This is Amendment Two to a Request for Proposal (RFP) issued by the United States Space Force at Buckley Space Force Base for Outdoor Recreation (ODR) Countertop & Cabinets. The solicitation number is FA254326R0012, with a NAICS code 236220 (Commercial and Institutional Building Construction) and PSC/FSC code Z2JZ (Repair or Alteration of Miscellaneous Buildings). This is a competitive combined synopsis/solicitation conducted under Non-Appropriated Fund (NAF) procurement rules and the Revolutionary FAR Overhaul (RFO). The anticipated period of performance is 60 calendar days from Notice to Proceed, and contractors must propose a timeline not to exceed 60 days. The Government has reserved the right to cancel the solicitation if funds become unavailable, with no obligation to reimburse offerors for costs incurred.
The project requires three main deliverables: demolition and disposal of existing counters and back-wall cabinetry with worksite preparation and damage repair; fabrication and installation of an L-shaped front counter with reception caps, electrical circuits, and internet data drops; and fabrication and installation of a back-wall storage system including locking base cabinet, whiteboard, and open shelving. Proposals must include a Cover Page stating the offeror's name, CAGE code, UEI, and any exceptions to the Statement of Work; Volume I with technical narratives addressing three factors (demolition/disposal/worksite prep, front counter design and materials, and back-wall storage system); and Volume II with pricing broken into three CLINs totaling project cost on a complete installed basis including profit, overhead, and shipping. Evaluation will use Lowest Price Technically Acceptable (LPTA) methodology. The site visit is scheduled for Tuesday, 01 September 2026 at 10:00 A.M. MST at Buckley SFB Outdoor Recreation Facility (Building 1022). Requests for Information are due by Thursday, 03 September 2026 at 12:00 P.M. MST, and proposals are due by Thursday, 17 September 2026 at 12:00 P.M. mountain time, valid for 90 calendar days. Base access forms must be submitted by Wednesday, 26 August 2026 at 10:00 A.M. MST for personnel requiring access to the installation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
UNITED STATES SPACE FORCE
Space Base Delta 2
Semper Supra
10 September 2026
MEMORANDUM FOR ALL INTERESTED CABINETRY & RETAIL INTERIOR
CONTRACTORS
FROM: 460 Contracting Squadron / PKA (Infrastructure Flight) 510 S Aspen St Buckley Space Force Base (SFB), CO 80011
SUBJECT: AMENDMENT TWO (2) - Request for Proposal (RFP), Outdoor Recreation
(ODR) Countertop & Cabinets
SOLICITATION NUMBER: FA254326R0012
ACQUISITION DETAILS:
• NAICS Code: 236220 – Commercial and Institutional Building Construction
• PSC/FSC Code: Z2JZ – Repair or Alteration of Miscellaneous Buildings
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No Award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals.
In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
1. This is a competitive combined synopsis / solicitation conducted in accordance with (IAW)
Buckley SFB Non-Appropriated Fund (NAF) procurement rules, the Revolutionary FAR Overhaul (RFO) as supplemented, and standard commercial NAF procurement principles.
2. You are hereby requested to submit a proposal for the above subject-referenced project which will follow the proposal process as outlined in this RFP.
3. To ensure timely and equitable evaluation of proposals, Offerors must follow the instructions and meet solicitation requirements, including terms and conditions, and representations and certifications. This document provides general guidance for preparing proposals as well as specific instructions on the format and content of proposal submission. The Offeror’s proposal must be submitted IAW these instructions. Any Offeror who submits an incomplete proposal or does not conform to the instructions may be considered non-compliant and may not be evaluated.
4. Interchanges: The Government intends to, and reserves the right to, make award based upon initial proposal submissions without conducting interchanges. Interchanges are the fluid exchange of information between the Contracting Officer and Offerors during the procurement process. Interchanges may address any aspect of the proposal: technical, cost/price, past performance, contract documentation, and/or any matter in the evaluation process. Therefore, each offer should contain the Offeror’s best terms. However, the Government reserves the right to hold interchanges if, during the evaluation, it is determined to be in the best interest of the Government. Offeror responses to Interchange Notices (INs) will be considered in making the final selection decision. Interchanges may be conducted with one, some, all or no Offerors as the Government is not required to conduct interchanges with any or all Offerors responding to this RFP.
5. Amendment(s) to the RFP: The Government reserves the right to amend the RFP documents at any time. It is the Offeror’s responsibility to comply with any/all amendments. If this RFP is amended, all terms and conditions not revised will remain unchanged. Each Offeror shall acknowledge receipt of any amendments in conjunction with the Offeror’s proposal.
6. Wage Determination: The Wage Determination for use on this project shall be the latest applicable rate retrieved from SAM.gov in accordance with the Davis-Bacon Act.
7. The proposal shall include the following:
a. Cover Page:
The cover page shall include the Offeror’s name, CAGE code, UEI, and project title.
The contractor shall explicitly state if there are or are not any exceptions taken to the Statement of Work (SOW). If no exceptions are taken to the SOW, all work is expected to be completed IAW the SOW. The Government’s anticipated period of performance is 60 calendar days. Contractors shall propose a period of performance Not to Exceed 60 days from Notice to Proceed (NTP).
b. Volume I: Technical
The contractor shall provide the following technical factors in their proposals via narrative format. The technical volume shall address any concerns or alternatives to the Government’s solution. Simply restating the SOW, Appendices, or Attachments may result in a technically unacceptable rating.
Technical Factor (Contractors may use this as a checklist) Factor 1) Demolition, Disposal & Worksite Prep: Provide a plan for demolishing and disposing of the existing counters and back-wall cabinetry in accordance with SOW Section 4.1. The narrative must describe worksite protection methods and outline the approach to patching, repairing, and painting wall, ceiling, or flooring damage caused by construction.
Factor 2) Front Counter Design & Materials: The contractor shall detail their technical approach to fabricating and installing the L-shaped front counter and reception caps in accordance with SOW Section 4.2. The narrative must confirm compliance with the countertop material and edge profile specifications in accordance with SOW Sections
4.2.1.7 and 4.2.1.8. Additionally, the contractor shall outline their plan to run the electrical circuit and install the internet data drops in accordance with SOW Section 4.5.
Factor 3) Back-Wall Storage System:
The contractor shall detail their technical approach to fabricating and installing the back-wall storage system, including the locking base cabinet, whiteboard, and open shelving layers, in accordance with SOW Section 4.3. The proposal must describe the hardware configurations and explain the methodology for anchoring the casework to the wall studs in accordance with SOW Sections 4.3.1.4 and 4.3.1.5.
c. Volume II: Pricing
The pricing volume must include the total cost. The Contractor shall provide a cost proposal on a complete installed basis, including profit, overhead, and shipping broken down as appropriate. The pricing volume should include:
o All material and equipment types, units, and quantities.
o All labor categories and labor hours.
CLIN: Description: Quantity: Total Price:
0001 Demolition, Disposal, & Wall/Floor Prep 1 Job $ 0002 Front-Counter Procurement & Installation 1 Job $ 0003 Back-Wall Storage System Procurement & Installation 1 Job $ Total: $
8. Compliant Proposals: In order for a proposal to be considered compliant, the proposal must meet all requirements in section 7 of this RFP.
9. Method of Evaluation: This project will be awarded to the Lowest Price Technically Acceptable (LPTA) proposal. Contractors must conform to all instructions of this document in order for a proposal to be considered compliant. Interchanges may be conducted in order to allow proposals to become compliant. The Government reserves the right to only evaluate compliant proposals.
• First, the Government will arrange the proposals by price (from lowest to highest total price). The total price is determined IAW the project total. The Government will then evaluate the lowest price to determine if it is compliant with the RFP requirements. If the lowest price is determined compliant, the Government will evaluate it for Technical Acceptability in accordance with the RFP.
• If the lowest priced proposal is not rated technically acceptable, the Government reserves the right to conduct Interchanges. If the lowest price is ultimately rated technically unacceptable, the next lowest priced proposal will be evaluated, and the process will continue (in order of price) until an Offeror is rated technically acceptable. If the lowest priced compliant proposal is found technically acceptable, evaluation stops, and that Offeror’s proposal will be evaluated to determine if it is fair and reasonable.
10. The following provisions and clauses in their latest editions apply to this acquisition:
a. 5352.242-9000 Contractor Access to Air Force Installations
b. 5352.201-9101 USSF Ombudsman
c. 52.212-4 Terms and Conditions-Commercial Products and Commercial Services.
(Deviation 2026-O0038)
d. 52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation
2026-O0040, Revision 1)
11. Site Visit: As prescribed in RFO 52.237-1, Site Visit, all prospective offerors are urged and expected to inspect the site where the work will be performed. The site visit will be conducted on Tuesday, 01 September 2026 at 10:00 A.M. Mountain Standard Time (MST) at BSFB.
We will meet at the Buckley SFB Outdoor Recreation Facility (Bldg. 1022). Any personnel that require base access shall submit the BSFB Access Form 128 (Attachment 2) to the Contract Specialist (CS) and Contracting Officer (CO) no later than Wednesday, 26 August 2026 at 10:00 A.M. Mountain Standard Time (MST) in advance of the site visit with the Name, DOB, and Driver’s License Number/State, and Foreign Status. The CS and CO email addresses are located in paragraph thirteen (13).
12. All associated Requests for Information (RFIs) are due no later than Thursday, 03 September 2026 at 12:00 P.M MST to the CS and CO. Upon issuance of the Government’s responses to the RFI’s, the Government may accept additional RFI’s that are submitted within 72 hours for consideration. The Government reserves the right to answer or not answer the additional RFI’s. The Government anticipates posting initial responses to RFI’s within 6 calendar days after receiving the RFIs from potential offerors.
13. Proposal Due Date: Proposals shall be submitted to the Contract Specialist and the Contracting Officer no later than Thursday, 17 September 2026 at 12:00 P.M., mountain time. Proposals shall be valid for 90 calendar days.
14. Should there be any questions, please contact the Contracting Specialist, SSgt Jared Haulman, at jared.haulman@spaceforce.mil or the Contracting Officer, JaCorian Duffield, at jacorian.duffield@spaceforce.mil.
JACORIAN K. DUFFIELD, NH-03, USAF
460 CONS PKA Contracting Officer
List of Attachments (5):
1. Statement of Work (SOW) dated 10 September 2026
2. RFI Q&A dated 10 September 2026
3. ODR Rec Attachments
4. NAF_Standard_Clauses_Incorporated_By_Reference_Full_Text CAO 30 May 25
5. Wage Determination_CO20260016
6. BSFB Access Form 128 Template
7. Request for Information Template
| 2026-09-10T15:25:10-0600 | |
| DUFFIELD.JACORIAN.K.1133120056 |
File details come from the government source that posted it. Updated .