A6 Fuel Hoses QAs - Update 2 (21 Dec 20).xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Solicitation for Floating Fuel Hoses at Thule AB, Greenland
Solicitation number
FA2523-21-Q-0001
Issued by

About this file

This document provides a consolidated set of questions and answers regarding a solicitation for floating fuel hoses at Thule Air Base in Greenland. The solicitation seeks to procure and deliver to Denmark two new sets of floating hoses with associated hose reels and accessories to support fueling operations. Key details include an extended response deadline of 4 January 2021 due to COVID-19 impacts on manufacturing lead times, anticipated award by 15 January 2021, acceptance of quotes in either Euros or Danish Krone, and clarification that variations to stated hose characteristics are acceptable if performance requirements are still met. The solicitation is being conducted by the Department of the Air Force Space Command.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Response

FA2523-21-Q-0001 - Consolidated Questions and Answers Spreadsheet
#QuestionResponseResponse Posted
1I could not locate whether the submittal cost are in US Dollars, Euro or Danish Krone?It is in DKK. The Combo Synopsis-Solicitation Fuel Hoses document has been updated accordingly.16-Dec-20
2In document A4 Capability Matrix, section E it seems that the language is incompleteA4 Section E, updated to: "Supporting Information Location: Indicate where in the Offeror's quote the minimum requirement is met"16-Dec-20
3Could you kindly advise the difference between the two photos, the frame of the right photo is totally different than the one initially shared to us, left photo. Is the right photo the one you are currently using?
Thule AB presently has two sets (of two) fuel hoses. One set was procured from Manuli Oil & Marine (U.S.A.), Inc. through contract F05604-02-C-0013. The second set was procured from Techflow Marine Ltd through contract FA2523-16-P-0004. The images provided show both of these fuel hose sets. Offerors are reminded to submit a quote based on the solicited SOW and not the previously awarded requirements.16-Dec-20
4Please confirm if it is acceptable also to quote in Euro currency since Denmark is member of the European Union.Updated to Euro.21-Dec-20
5We hope an extension with be granted.The solicitation has been extended until 1100AM CET, 4 Jan 20 to allow the maximum time for offerors to submit a quote. Due to the strict manufacturing lead times we are unable to extend the solicitation period any further.21-Dec-20
6The full tender is to be submitted via SAM portal? Or can it be submitted via email?Submit quotes to both POCs by email.21-Dec-20
7Following submission of the tender on or before 30th December what is the anticipated contract award date? As the deadline is the 15th May in Denmark the lead time is tightThe anticipated date of award is 15 Jan 20.21-Dec-20
8(Redacted) can offer the project in Danish Krones or Euros. Please can you confirm if this is changing?Updated to Euro.21-Dec-20
9(Redacted) supplied on the last 2 hose reels 600ft hoses with an additional 15ft section on the end. This additional 15ft section is not mentioned in the new scope request. Can you confirm if the extra 15ft is required?The extra 15ft section is not required.21-Dec-20
10(Redacted) supplied butterfly valves behind the camlock couplings on the previously supplied 2 hose reels. The new scope request asks for Ball valves. Can you confirm if this is correct?The SOW has been revised to require butterfly valves as opposed to ball valves.21-Dec-20
11Hose characteristics on the solicitation do not match perfectly against the Manuli Long Length floating hose data sheet previously supplied by (Redacted). Can you clarify if these very small hose deviations are acceptable: (Table reddacted) All other items are correct (Working pressure, test pressure etc.).The Manuli Long Length floating hose is acceptable. The SOW has been updated to state: "Note: Variations to the data stated in this subparagraph are acceptable if the hoses can support the requirements listed in the section."21-Dec-20
12FAT and inspecting in the UK by USAF. This is all subject to COVID restrictions at the time of test.The Government's intent is to execute the FAT inspections on-site. However, the USAF will initiate a modification to the contract if budgetary or COVID restrictions prevents this after award.21-Dec-20
13What delivery terms are required for this solicitation?The FOB point is destination. Additionally, contractors are reminded to review and complete DFARS clause 252.229-7001, Tax Relief, as applicable.21-Dec-20