Solicitation for Floating Fuel Hoses at Thule AB, Greenland
Solicitation number
FA2523-21-Q-0001
Issued by

About this file

This combined synopsis and solicitation seeks proposals for two sets of new floating fuel hoses with associated reels and accessories to be delivered to the Port of Fredericia, Denmark. The solicitation requires the delivery of floating hoses that are 8 inches by 600 feet long, with internal and external diameters of 205mm and 233mm respectively. The hoses must support a minimum working pressure of 250psi and test pressure of 450psi, with a burst pressure of 1200psi. Accompanying each hose set must be all necessary fittings, clamps, couplings, valves, camlock adaptors, towing clamps, seals, and a handling harness. The reels must accommodate the 8-inch by 600-foot bunker hoses and include a hydraulic motor drive unit with failsafe brake, an electro-hydraulic power unit rated at 7.5kW to 10HP, and an electric starter unit also rated at 7.5kW to 10HP. The hydraulic system components must be constructed of 316L stainless steel and undergo pressure testing. Proposals are due by December 30, 2020 and the hoses must be delivered assembled on the reels to the Port of Fredericia, Denmark by May 15, 2021. The solicitation is issued by the Department of the Air Force Space Command.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Fuel Hose System, Thule ABVendor Name:
Product Name:
SOW Para.Minimum RequirementJustification for Meeting Requirements: Narrative on how vendor meets minimum requirement (Vendor must provide narrative to get credit - can attach or reference narrative)Supporting Information Location: Indicate where in the vendors offer the minimum requirement.
Fuel Oil Reeling System2.1 Spec.1• 8 inch x 600 foot (8” x 600’) Long length floater hose.

o Electrically: Discontinuous. ANSI 150 WN RF. Textile Long Length Hose.

o Soft wall. Inside dia. 205 mm, outside dia. 233 mm, weight in air empty 12.3kg/m, weight in air full of water 46.1kg/m. Note: Variations to the data stated in this subparagraph are acceptable if the hoses can support the requirements listed in the section.

o Working pressure of 250 psi or higher, test pressure 450 psi, burst pressure 1200 psi.

o Aromatic resistance up to 50%.

o Flow velocity up to 21 m/s.

o Each assembly includes all necessary fittings, 8" towing slit clamps, 8" couplings, ball butterfly valves, 8" towing clamps, 8" seal O-rings, 8" seal back-up rings, 8" camlock adaptors w/valves and 8" towing clamp handling harness.

Reel Drum and Drive Frame 2.1 Spec.1 o Refueling hose drum & support frame capable of accommodating 8-inch x 600’ bunker hose o Hydraulic motor drive unit c/w failsafe brake o Electro/hydraulic power unit (7.5 kW - 10 HP) o Direct-on-line electric starter unit (7.5 kW - 10 HP) o Electrical Supply Main 208 volts 3 phase 60 Hz o Hydraulic Piping: 316L Stainless Steel – Metric o Hydraulic Fittings 316L Stainless Steel – Double Ferrule – Metric

Hydraulic Power Unit (HPU)2.1 Spec.1• 208 volt, 3-phase, 60 Hz Hydraulic Power Unit (HPU) should be integrated onto reel with a 10 HP (7.5 kW) capacity electric motor
Documentation2.1 Spec.1• Standard Documentation Pack, Manufacturing Data Book and Factory Pressure Testing Certifications
Freight and Delivery2.1 Spec. 22. Freight costs must be included to Port of Fredericia, Denmark. All materials must be delivered as one shipment NLT 15 MAY 2021.
Factory Acceptance Testing2.1 Spec. 2The hoses must be assembled onto the associated reels prior to shipping from the manufacturer’s facility to the Port of Fredericia, Denmark. Proper coordination and advance communication must be provided with the government representatives to allow for Factory Acceptance Testing (FAT) and to witness the final assembly/spooling of the hoses onto the reels before they are shipped. Government points of contact will be provided upon contract award. FAT to include as a minimum:

• Reel system light run functional test

• Hydraulic system, hydraulic pressure tested - 1.5 x Max Working Pressure

• Hydraulic system cleaned & flushed to ISO 17/15/12

• Hydraulic system sealed/capped after flushing

• Hose Pressure testing at 1.5 x max working pressure