This document is a Synopsis Information sheet for a federal construction project at Patrick Space Force Base in Florida. The project, designated as SXHT 24-9000, involves completing the interior build-out of a weapons maintenance storage addition (Building B9678) that was previously terminated after partial exterior and system work. Scope includes interior finishes, fire sprinkler and alarm system adjustments, HVAC completion, electrical and communications work, furniture installation, and exterior improvements such as transformer pad regrading and chain link fencing. The project is estimated between $1,000,000 and $5,000,000 with a performance period of 180 calendar days, and the original contract drawings have been annotated to highlight the specific work requirements.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYNOPSIS INFORMATION
PROJECT NO: SXHT 24-9000
PROJECT TITLE: Repair Weapons Maintenance Addition, B9678
DESCRIPTION OF WORK:
Complete the interior build out of B9678 weapons maintenance storage addition project that was terminated after exterior construction and fire alarm and fire suppression and partial HVAC was done. This project consists of interior finishes, lowering fire sprinkler heads to appropriate height of drop ceiling, locating fire alarm devices to actual locations, completing HVAC, removing temporary ductless split unit (return to CES), electrical & comm work, furniture and existing joint between old building and addition, shown on Sheet A-021 and A-451. Frame interior wall around window between addition and room 119 to preserve existing window. Exterior work includes raising existing transformer pad to include regrading, CMU infill and match existing exterior finishes, horizontal chain link fencing and gate at exterior, The original contract drawings have been annotated with dashed lines to show scope of work (grayed out information not in scope) and full project specifications are included.
Magnitude of Construction: between $1,000,000 and $5,000,000
PERIOD OF PERFORMANCE: 180 calendar days.