SXHT 24-9000 Construct Weapons Maintenance Addition
Solicitation number
FA252125B0007
Issued by

About this file

This document is a synopsis for a federal construction project to repair and complete a weapons maintenance storage addition at Patrick Space Force Base in Florida. The project (Project No. SXHT 24-9000) involves finishing an interior build-out of Building B9678, which was previously terminated after exterior construction and partial system installations. Specific work includes interior finishes, fire alarm and sprinkler system adjustments, HVAC completion, electrical and communications work, furniture installation, and exterior improvements such as transformer pad regrading and chain link fencing.

The project has a magnitude of construction between $1,000,000 and $5,000,000 with a performance period of 180 calendar days. A pre-bid site visit is mandatory for all bidders, and the original contract drawings have been annotated to show the specific scope of work. The project will complete remaining construction elements, including framing interior walls, matching exterior finishes, and resolving the joint between the existing building and the addition.

View the file

Other files

File Type Posted
FA252125B0007 Abstract of Bids.pdf PDF
WD FL20250196.pdf PDF
Solicitation Amendment FA252125B00070006 SF 30.pdf PDF
Furniture RFI 01.pdf PDF
Solicitation Amendment FA252125B00070005 SF 30.pdf PDF
Solicitation Amendment - FA252125B00070005.pdf PDF
QA Form SXHT 24-9000 rev1.pdf PDF
Solicitation Amendment - FA252125B00070004.pdf PDF
Solicitation Amendment FA252125B00070004 SF 30.pdf PDF
QA Form SXHT 24-9000.pdf PDF
Solicitation Amendment - FA252125B00070003.pdf PDF
Solicitation Amendment FA252125B00070003 SF 30.pdf PDF
SXHT 24-9000 QA Amendment 2.pdf PDF
Solicitation Amendment - FA252125B00070002 Conformed.pdf PDF
Solicitation Amendment FA252125B00070002 SF 30.pdf PDF
A04_SXHT 24-9000 Synopsis.pdf PDF
25B0007 Site Visit Sign in Sheet.pdf PDF
Solicitation Amendment FA252125B00070001 SF 30.pdf PDF
Solicitation Amendment - FA252125B00070001.pdf PDF
Wage Determination PSFB_6.6.2025.pdf PDF
A01a_SLD45 Front End SPEC FINAL.pdf PDF
Badge Request 45 SFS Form V13.pdf PDF
SDVOSB-SelfPerformanceCertificationWrksht.pdf PDF
SXHT 24-9000 CECC Form 3052.xlsx XLSX spreadsheet
Solicitation - FA252125B0007.pdf PDF
A01b_SXHT 24-9000 Project Specs EDITED.pdf PDF
A04_SXHT 24-9000 GPP Certification Signed.pdf PDF
Patrick SFB Wage Determination.pdf PDF
A02_SXHT 24-9000 Drawings.pdf PDF
A06_SXHT 24-9000 ODS.pdf PDF
A10_ Energy Management and Control Systems Standards.pdf PDF
QUESTION AND ANSWER FORM.docx DOCX document
A02a_SXHT 24-9000 PAFB-B9678add_FFE_Final Design_Redacted.pdf PDF
A07_SXHT 24-9000 Haz Waste.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYNOPSIS INFORMATION

PROJECT NO: SXHT 24-9000

PROJECT TITLE: Repair Weapons Maintenance Addition, B9678

DESCRIPTION OF WORK:

Complete the interior build out of B9678 weapons maintenance storage addition project that was terminated after exterior construction and fire alarm and fire suppression and partial HVAC was done. This project consists of interior finishes, lowering fire sprinkler heads to appropriate height of drop ceiling, locating fire alarm devices to actual locations, completing HVAC, removing temporary ductless split unit (return to CES), electrical & comm work, furniture and existing joint between old building and addition, shown on Sheet A-021 and A-451. Frame interior wall around window between addition and room 119 to preserve existing window. Exterior work includes raising existing transformer pad to include regrading, CMU infill and match existing exterior finishes, horizontal chain link fencing and gate at exterior, The original contract drawings have been annotated with dashed lines to show scope of work (grayed out information not in scope) and full project specifications are included. A pre-bid site visit is required for all bidders.

Magnitude of Construction: between $1,000,000 and $5,000,000

PERIOD OF PERFORMANCE: 180 calendar days.