This memorandum amends the solicitation for a project to replace transformers and electrical infrastructure at several facilities on Patrick Space Force Base in Florida. The original solicitation established dates for a site visit on June 18th, questions due by June 22nd, and bids due on July 7th. However, due to the June 19th federal holiday, the site visit has been rescheduled to June 24th at 1:00 PM EST. The new timeline also pushes questions due to June 28th by 11:00 AM EST and bids due on July 14th at 9:00 AM EST, with bid opening at 10:30 AM EST on the same day. The memorandum notes a delay in posting the official SF30 document to the federal contracting system due to technical difficulties. The project involves replacing open-wire pole-mount and live-front transformers with new pad-mounted transformers, installing new high-voltage cables, low-voltage cables, and facility main distribution panels, and demolishing standalone electrical vaults at several buildings on Patrick Space Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Transformer Various (Project SXHT 11-1031), PSFB, FL, newest first.
File Type Posted
SF 1409_ABSTRACT OF OFFERS_Post.pdf PDF
Solicitation Amendment FA252121B00010003 SF 30.pdf PDF
Attachment 14 P041_FactSheet_Update2021.pdf PDF
Solicitation Amendment FA252121B00010004 SF 30.pdf PDF
Attachment 16 Panelboard Surface 2021-02-10 08.36.52.pdf PDF
Attachment 12 Construction Wage Determination (FL 20210001. Modification 5) dated 09 Jul 2021 (Pages 8).pdf PDF
Attachment 15 Demolition Floor plan 2021-02-10 08.35.00.pdf PDF
Attachment 13 Florida Department of Environmental Protection FDEP SRCO with NFA MOD.pdf PDF
Attachment 17 Answers to site visits.pdf PDF
FA252121B00010002.pdf PDF
Attachment 7a-RulesofEngagement-Pre-BidSiteVisit.pdf PDF
Solicitation Amendment FA252121B00010001 SF 30.pdf PDF
Solicitation - FA252121B0001.pdf PDF
Attachement 5-HazWasteForm.doc DOC document
Attachment 9-Contractor Access Instructions.pdf PDF
Attachment 6-Q and A Template.docx DOCX document
Attachment 4-GPP Cert SXHT 11-1031.pdf PDF
Attachment 9-Installation Access List WORD.docx DOCX document
Attachment 8-CECC Form 3052.xls XLS spreadsheet
Attachment 2-Specifications SXHT 11-1031 1.pdf PDF
Attch 11 Consolidated Answers 21B0001.pdf PDF
Attch 10 AMRS Meter Specification.pdf PDF
Attachment 7-RulesofEngagement-Pre-BidSiteVisit.pdf PDF
Attch 1 Drawings SXHT111031 RPR Elec Transf Var PAFB BID SET.pdf PDF
Attachment 3 - Construction Wage Determination (FL 20200001).pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

UNITED STATES SPACE FORCE

SPACE LAUNCH DELTA 45

6/21/2021

MEMORANDUM FOR RECORD

FROM: 45 CONS/LGCAB

1201 Edward H. White II Street Patrick SFB FL 32925-3242

SUBJECT: Amendment to Solicitation- FA252121B0001

1. The Solicitation (FA252121B0001) that was posted on 6/4/2021 established timelines and deadlines that were in congruence with the acquisition timeline.The Dates were as follows Site visit 6/18, Questions and answers due 6/22 bids due and opening 7/7. However due to federal guidance sent out 6/17 to observer 6/19 as a federal holiday led to the need reschedule the site visit planned for 6/18. The rescheduling of the site visit will result in the the complete timeline being altered.

2. The new dates and timeline will be the following.

Site visit – 6/24 1:00 PM EST Questions and answers due- 6/28 11:AM EST Bids due- 7/14 9:00 Am EST Bid Opening 7/14 10:30 Am EST

3. Due to Techincal difficulties of the contract writing system (CONIT) there will be a delay in the posting of the official SF30 document. A help desk ticket was entered 6/21/2021

Andrew Washington Contract Specialist