Attachement 5-HazWasteForm.doc

DOC document 41 KB Posted

Attached to
Repair Transformer Various (Project SXHT 11-1031), PSFB, FL Federal contract opportunity
Solicitation number
FA252121B0001
Issued by
Department of the Air Force Space Command

About this file

This document contains a hazardous waste forecast form and details of a federal contract opportunity for replacing electric transformers and related infrastructure at various facilities on a military installation. The hazardous waste forecast form requires contractors to identify any hazardous materials that will be used in the project, the related processes, anticipated waste streams and quantities. The federal contract opportunity is to provide labor, equipment and materials to replace open-wire pole-mount and live-front transformers with new pad-mounted transformers, install new high and low-voltage cables, demolish electrical vaults, and set up new distribution panels at eight specified facilities on an Air Force base. The solicitation number and awarding agency are provided.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Transformer Various (Project SXHT 11-1031), PSFB, FL, newest first.
File Type Posted
SF 1409_ABSTRACT OF OFFERS_Post.pdf PDF
Solicitation Amendment FA252121B00010003 SF 30.pdf PDF
Attachment 14 P041_FactSheet_Update2021.pdf PDF
Solicitation Amendment FA252121B00010004 SF 30.pdf PDF
Attachment 15 Demolition Floor plan 2021-02-10 08.35.00.pdf PDF
Attachment 13 Florida Department of Environmental Protection FDEP SRCO with NFA MOD.pdf PDF
Attachment 16 Panelboard Surface 2021-02-10 08.36.52.pdf PDF
Attachment 12 Construction Wage Determination (FL 20210001. Modification 5) dated 09 Jul 2021 (Pages 8).pdf PDF
Attachment 17 Answers to site visits.pdf PDF
FA252121B00010002.pdf PDF
Attachment 7a-RulesofEngagement-Pre-BidSiteVisit.pdf PDF
Solicitation Amendment FA252121B00010001 SF 30.pdf PDF
MFR Dates Alteration.pdf PDF
Solicitation - FA252121B0001.pdf PDF
Attachment 9-Installation Access List WORD.docx DOCX document
Attachment 8-CECC Form 3052.xls XLS spreadsheet
Attachment 2-Specifications SXHT 11-1031 1.pdf PDF
Attch 11 Consolidated Answers 21B0001.pdf PDF
Attch 10 AMRS Meter Specification.pdf PDF
Attachment 7-RulesofEngagement-Pre-BidSiteVisit.pdf PDF
Attch 1 Drawings SXHT111031 RPR Elec Transf Var PAFB BID SET.pdf PDF
Attachment 3 - Construction Wage Determination (FL 20200001).pdf PDF
Attachment 9-Contractor Access Instructions.pdf PDF
Attachment 6-Q and A Template.docx DOCX document
Attachment 4-GPP Cert SXHT 11-1031.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION

PROJECT #:
SXHT 11-1031
PROJECT TITLE:
Replace Electric Tranformers/Various

Facilities include buildings 429, 546, 720, 806, 905, 972, 985, and 986

CONTRACTOR:

POINT OF CONTACT:

PHONE:

FAX:

HAZARDOUS MATERIAL:
DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL

(INCLUDE METHOD OF APPLICATION)

DESCRIPTION OF WASTE:
QUANTITY:

Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.

Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:

1) Must remove and dispose of paints, building components, or equipment containing hazardous materials (lead, mercury, etc.)

2) Submits an MSDS for approval of use of a material known to be hazardous.

On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.

1. Project #: Provide installation project number.

2. Project Title: Provide installation project title.

3. Contractor: Enter complete name of contractor performing process.

4. Point of Contact: Provide name of individual knowledgeable on requirements of materials listed.

5. Phone/Fax: Provide phone and fax numbers for point of contact.

6. Hazardous Material: Provide common name of each hazardous material

7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).

8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.

9. Quantity: Estimate quantity of waste to be generated

10. Sign and date each form at bottom

Attachment 5

CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________

File details come from the government source that posted it. Updated .