This federal contract opportunity is a solicitation from the Department of the Air Force Space Command to replace aging electrical infrastructure at various facilities at Patrick Space Force Base in Florida. The project consists of replacing open-wire pole-mount and live-front transformers with new pad mounted transformers, installing new high-voltage cables from switches to transformers and low-voltage cables from transformers to main panels. It also includes demolishing stand-alone electrical vaults and installing new facility main distribution panels in buildings 429, 546, 720, 806, 905, 972, 985, and 986. The solicitation number is FA252121B0001 and offers this repair and replacement work.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR FORCE BASE
MIAMI
TAMPA
ORLANDO
PATRICK
TALLAHASSEE
JACKSONVILLE
PINEDA EXPRESSWAY
SOUTH GATE (PERSONNEL ONLY)
B
A
N
A
N
A
R
I V
E
R
B A
N
A N
A
R
I V
E R
A
T
L A
N
T
C
O
E
A
N
TRUCK DELIVERY ONLY
BUILDING 423-CONTRACTING OFFICER
BUILDING 535-45TH CES
MAIN GATE (PERSONNEL ONLY)
S.R. A1A
B
A
N
A
V
E
R
A
T
L A
N
T
E
A
N
GOLF COURSE
A
C
C
E
S
S R
O
A
D
H
A
B
I T
T
U
N
R
E
D
S
T
O
N
E
R
O
A
D
C O
N T
R O
L
R
O A
D
U
N
K
N
O
W
N
R
EC
R
EATIO
N
R
O
AD
U
N
K
N
O
W
N
A
C
C
E
S
SR
O
A
D
R
I V
E
R
S
I D
E
A
I L
UNKNOWN
S
O
U
T
H
T
E
C
H
R
O
A
D
A
C
C
E
S
S
R
O
A
D
ACCESS
ROAD
U
N
K
N
O
W
N
ACCESS ROAD
A
C
C
E
S
A
D
A
C
C
E
S
S
R
O
A
D
W
E
S
T
T
E
C
H
R
O
A
D
U
N
K
N
O
W
N
PEQUOT TRAIL
A
C
C
E
A
D
F
O
R
E
C
A
L
N
E
A
R
A
P
A
H
O
T
R
A
I L
A
N
G
E
L
F
I S
H
C
O
V
E
B O
N I T
A
C O
V E
C
H
E
R
O
K
E
E
T
R
A
I L
C
H
I
C
K
A
S
A
W
T
R
A
I
L
C O
N T
R O
L
R
O A
D
F
A
L
C
V
E
N
U
E
SOUTH TECH ROAD
C
H
O
C
K
T
A
W
T
R
A
I
L
COUGAR R
UN
SAN
D
O
LLAR
C
O
VE
E
N
D
E
A
V
O
R
R
O
A
D
C
O
M
A
N
C
H
E
T
R
A
I
L
S
U
R
F
S
I D
E
C
O
V
E
ACCESS ROAD
J
U
P
IT
E
R
S
T
R
E
E
T
A
T
L
A
S
A
V
E
N
U
E
A
C
C
E
A
D
PORPOISE COVE
C
O
Y
O
T
E
R
U
N
T
U
S
K
E
G
R
M
I
V
E
U
N
K
N
O
W
N
RIVERSIDE
TRAIL
R
E
E
F
C
O
U
R
T
STARFISH
COVE
A
C
C
E
S
S
R
O
A
D
O
M
A
L
L
Y
I
V
E
M
A
R
L
I N
C
O
V
E
M
E
R
M
A
ID
C
O
V
E
ACCESS ROAD
U T
E
T R
A I L
A
C
C
E
A
D
P
O
R
P
O
IS
EC
O
V
E
T
I
T
A
D
C
R
E
E
T
R
A
IL
NORTH D
RIV
E
SANDOLLAR
COVE
S
E
A
M
IS
T
C
O
V
E
C
O
Q
U
I
V
E
P
A
R
R
N
S
E
Q
U
O
I
A
T
R
A
I
L
DUSKY
RUN
N C
O
C
L U
B
S
O U
H
P
R
K I N
G
U
T
E
T
R
A
IL
SEQ
U
O
IA
T
R
AIL
T
H
U
N
D
N
E
B R
E A
K E
R S
L A
N E
P
E
Q
U
A
I
L
J
A
G
U
A
R
A
V
E
N
U
E
SHOSHONI
TRAIL
P
A
N
T
H
N
COUGAR
RUN
JAGUAR AVENUE
A
C
C
E
S
S
R
O
A
D
DUSKY R
UN
CONTROL ROAD
I
R
O
Q
U
A
I
L
ACCESS ROAD
P
A
N
TH
E
R
R
U
N
S
T
O
R
M
Y
L
A
N
E
D
E
L
I
V
E
S
P
A
C
E
L
I
F
E
N
U
E
BEAR RUN
A
L
L
I
G
A
T
N
A C
C E
A
D
U N
K N
O W
N
SHOSHONI TRAIL
W
E
A
D
C A
N I N
E
D
R I V
E
S
C
R
B
J
Y
N
A
C
C
E
S
S
R
O
A
D
THUNDER LANE
T
H
O
R
S
T
R
E
E
T
M
IN
U
T
E
M
A
N
S
T
R
E
E
T
J
U
P
IT
E
R
S
T
R
E
E
T
C
H
A
L
L
E
N
G
E
R
S
T
R
E
E
T
E
D
W
A
R
D
W
H
IT
E
S
T
R
E
E
T
B
R
E
A
K
E
N
E
P
E
R
S
H
IN
G
P
L
A
C
E
H
O
P
I
T
R
A
I L
R
E
U
R
T
P
H
A
R
M
A
C
Y
D
R
IV
E
M
A
T
A
D
O
R
S
T
R
E
E
T
UNKNOWN
R
E
S
C
A
D
R
E
L
A
Y
S
T
A
T
IO
N
R
O
A
D
S O
U T
H
P
A T
R I C
K
D
R I V
E
M
A
I
N
T
E
N
A
N
A
D
CONTROL ROAD
CONTROL ROAD
S
A
T
U
R
N
R
O
A
D
S
C
H
O
O
L
A
V
E
N
U
E
L
E
S
U
N
S
E
T
B
O
U
L
E
V
A
R
D
C
O
N
T
R
A
D
ANVIL R
OAD
ACCESS ROAD
W E
C
H
R
O A
D
G
R
E
E
N
S
K
E
E
P
N
E
MACE ROAD
STATE ROAD 404 (ONRAMP)
R
E
S
C
A
D
STATE ROAD 404
S T
A T
E
R
O A
D
A
A
R
E
S
C
A
D
A
C
C
E
S
S
R
O
A
D
A
C
C
E
S
S
R
O
A
D
A C
C E
S S
R O
A D
10992
10990
1420 1421
SOQ5
SOQ6
T15
SOQ7
PAV2
T1619
T12
TBD
T7
T6
Unknown
10985
TBD
TBD
TBD
10989
10991
T968
SOQ2
PAV9
SOQ1
SOQ4
TBD
T14
TBD
TBD
PAV6
PAV4
PAV8
PAV5
PAV1
SOQ3
T13
T-Golon10
TBD
TBD
PB8
ANT1
SCALE:
STATE OF FLORIDA
NONE
R
E
D
S
T
O
A
D
A
T
L
E
N
U
E
D
E
L
I
V
E
C
H
A
L
L
E
N
G
E
R
S
T
R
E
E
T
P
E
R
S
H
I
G
A
C
E
S
A
T
U
A
D
SOUTH TECH ROAD
W
E
A
D
10990
10985
PAV4
U
N
K
N
O
W
N
SXHT 11-1031
REPAIR ELECTRICAL
TRANSFORMERS, VARIOUS
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIED
HAZARDOUS MATERIALS
G-001
F
L A
B O
Y M
A
L L E
N
M
P
I L O
V I C
I N
I T
Y
M
A P
L
O C
A T
I O
N
P
L A
N
A N
D
D
R A
W I N
G
I N
D E
X
L
C
O L E
M A
N
S X
F
G
B
E A
R D
R E
P A
E
C T
R I C
A L
T R
A N
S F
O R
M E
R S
V
A R
I O
U S
S X
F
P A
F B
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
CE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, ENGINEERING FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A
P
P
R
O
V
E
D
PATRICK AIR FORCE BASE
FLORIDA
SCALE:
LOCATION MAP
NONE
TRUE
NORTH
NORTH
PLAN
BLDG 429
BLDG 546
BLDG 720
BLDG 806
BLDG 905
BLDG 986
BLDG 985
BLDG 945
BLDG 972
DRAWING INDEX
SHEET NO. DESCRIPTION
G-001
VICINITY MAP, LOCATION PLAN AND DRAWING INDEX
ELECTRICAL
E-001
GENERAL NOTES, LEGEND AND ABBREVIATIONS
E-002 SEQUENCE OF WORK NOTES - 1
E-003 SEQUENCE OF WORK NOTES - 2
ED-100 FLAG NOTES - DEMOLITION
ED-101 BLDG 429 SITE PLAN - DEMOLITION
ED-102 BLDG 429 ENLARGED PLANS - DEMOLITION
ED-111 BLDG 546 PLANS - DEMOLITION
ED-121 BLDG 720 PLANS - DEMOLITION
ED-131 BLDG 806 PLANS - DEMOLITION
ED-141 BLDG 905 PLANS - DEMOLITION
ED-142 BLDG 905 SINGLE LINE DIAGRAM - DEMOLITION
ED-151 BLDG 945 PLANS - DEMOLITION
ED-161 BLDG 972 PLANS - DEMOLITION
ED-171 BLDG 985 PLANS - DEMOLITION
ED-181 BLDG 986 PLANS - DEMOLITION
E-100 FLAG NOTES - NEW CONSTRUCTION
E-101 BLDG 429 SITE PLAN - NEW CONSTRUCTION
E-102 BLDG 429 ENLARGED PLANS - NEW CONSTRUCTION
E-111 BLDG 546 PLANS - NEW CONSTRUCTION
E-121 BLDG 720 PLANS - NEW CONSTRUCTION
E-122 BLDG 720 SINGLE LINE DIAGRAM - NEW CONSTRUCTION
E-131 BLDG 806 PLANS - NEW CONSTRUCTION
E-141 BLDG 905 PLANS - NEW CONSTRUCTION
E-142 BLDG 905 SINGLE LINE DIAGRAM - NEW CONSTRUCTION
E-151 BLDG 945 PLANS - NEW CONSTRUCTION
E-152 BLDG 945 SINGLE LINE DIAGRAM - NEW CONSTRUCTION
E-161 BLDG 972 PLANS - NEW CONSTRUCTION
E-171 BLDG 985 PLANS - NEW CONSTRUCTION
E-181 BLDG 986 PLANS - NEW CONSTRUCTION
E-501 DETAILS - 1
E-502 DETAILS - 2
E-503 DETAILS - 3
E-601 TRANSFORMERS SCHEDULE
ENGINEER OF RECORD (E.O.R.)
MIKE PILO, FL PE #50067
ALPHA MRC, INC., #AA0003182/ #IB0001162
2395 N. COURTENAY PKWY, SUITE 102
MERRITT ISLAND, FL 32953
321-449-9455
ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS
A m r c w k s p r o j e c t s R
A E I S C
C A
F S P
A F B
A
N N
E X
E S R
A E I S R l e c
T r a n s f
V a r D r a w i n g s G d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p c
1229014770C Rectangle
1229014770C Rectangle
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
A - AMPERES, AMPS
AFC - AVAILABLE FAULT CURRENT
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
AHU - AIR HANDLING UNIT
AIC - AMPS INTERRUPTING CAPACITY
ATS AUTOMATIC TRANSFER SWITCH
BKR - BREAKER
C - CONDUIT
CB - CIRCUIT BREAKER
CKT - CIRCUIT
CLG - CEILING
CU - COPPER
CONC - CONCRETE
DC - DROP CORD
DIA (Ø) - DIAMETER
DIM - DIMENSION
DISC - DISCONNECT SWITCH
DWG - DRAWING
ELECT - ELECTRIC
EMT - ELECTRICAL METALLIC TUBING
ETR - EXISTING TO REMAIN
EXT - EXTERIOR
EXIST - EXISTING
EA - EACH
FAC. - FACILITY
FLA - FULL LOAD AMPS
FT - FEET
GEN - GENERATOR/GENSET
GFCI - GROUND FAULT CIRCUIT INTERRUPTER
GND - GROUND
HP - HORSEPOWER
INT - INTERIOR
I - CURRENT
ID - INSIDE DIAMETER
IN - INCH, INCHES
KCMIL - THOUSAND CIRCULAR MILS
KW - KILOWATT
LTG - LIGHTING
LV - LOW VOLTAGE
LF - LINEAL FEET
LPS - LOW PRESSURE SODIUM
MECH - MECHANICAL
MCP - MOTOR CIRCUIT PROTECTION
MTD - MOUNTED
MCM - THOUSAND CIRCULAR MILS
MCB - MAIN CIRCUIT BREAKER
MLO - MAIN LUGS ONLY
N/A - NOT APPLICABLE
NC - NORMALLY CLOSED
NIC - NOT IN CONTRACT
NO - NORMALLY OPEN
NTS - NOT TO SCALE
Ø - PHASE
PNL - PANEL, PANELBOARD
PVC - POLYVINYL CHLORIDE
PWR - POWER
RECP - RECEPTACLE
RGS - RIGID GALVANIZED STEEL
RM - ROOM
SPD - SURGE PROTECTION DEVICE
ST - SHUNT TRIP
STRP - STRIP
SW - SWITCH
SYS - SYSTEM
TYP - TYPICAL
UG - UNDERGROUND
UON - UNLESS OTHERWISE NOTED
V - VOLTS
W - WATTAGE
WP - WEATHERPROOF
XFER - TRANSFER
XFMR - TRANSFORMER
(APPLIES TO ALL ELECTRICAL SHEETS)
ELECTRICAL GENERAL NOTES:
1. IT IS THE INTENT OF THESE CONTRACT DRAWINGS TO PROVIDE A COMPLETE
AND WORKABLE FACILITY.
2. DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS,
BENDS, ELBOWS, OR OTHER SPECIFIC ELEMENTS THAT MAY BE REQUIRED FOR
PROPER INSTALLATION OF THE WORK. SUCH WORK SHALL BE VERIFIED AT THE
SITE. ADDITIONAL BENDS, OFFSETS, AND CONDUIT AS REQUIRED BY VERTICAL
AND HORIZONTAL EQUIPMENT LOCATIONS OR OTHER JOB CONDITIONS, SHALL
BE PROVIDED TO COMPLETE THE WORK AT NO ADDITIONAL COST TO THE
GOVERNMENT.
3. EXCEPT WHERE SHOWN IN DIMENSIONAL DETAIL, THE LOCATIONS OF
EQUIPMENT SHOWN ON PLANS ARE APPROXIMATE. SUCH ITEMS SHALL BE
PLACED TO ELIMINATE INTERFERENCE WITH OTHER EQUIPMENT. THE EXACT
LOCATIONS SHALL BE DETERMINED IN THE FIELD.
4. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2017 EDITION OF THE NATIONAL
ELECTRICAL CODE (NFPA 70).
5. MATERIALS SHALL BE LISTED BY THE UNDERWRITER'S LABORATORIES, INC. OR
ANOTHER APPROVED/CERTIFIED TESTING LABORATORY. SHOULD PLANS AND
CODES CONFLICT, CONTACT THE CONTRACTING OFFICER. MAKE NO CHANGES,
EVEN IN CASE OF CONFLICT, WITHOUT FIRST OBTAINING THE APPROVAL OF THE
CONTRACTING OFFICER.
6. A GREEN, COPPER GROUND WIRE SHALL BE INSTALLED IN ALL CONDUIT
SYSTEMS AND SHALL BE BONDED TO ALL ENCLOSURES, BOXES, AND
EQUIPMENT. RECEPTACLES WITH GREEN WIRE SHALL BE BONDED TO BOX
THEN TO RECEPTACLE SUCH THAT REMOVAL OF RECEPTACLE DEVICE SHALL
NOT INTERRUPT GREEN WIRE BOND TO METALLIC BOX OR ENCLOSURE.
7. BONDING JUMPERS SHALL BE USED TO BOND CONDUIT TO ENCLOSURES,
BOXES, AND EQUIPMENT WHERE CONCENTRIC OR ECCENTRIC KNOCKOUTS ARE
USED.
8. EQUIPMENT SIZES INDICATED ARE MINIMUM, BEFORE INSTALLING ANY WIRE OR
CONDUIT, THE CONTRACTOR SHALL OBTAIN THE EXACT EQUIPMENT
REQUIREMENTS AND SHALL INSTALL WIRE, CONDUIT, CIRCUIT BREAKERS AND
OTHER ITEMS OF THE CORRECT SIZE FOR THE EQUIPMENT ACTUALLY
INSTALLED. HOWEVER, WIRE AND CONDUIT SIZES FOR THE EQUIPMENT SHALL
BE TAKEN AS A MINIMUM AND SHALL NOT BE REDUCED WITHOUT WRITTEN
APPROVAL.
9. THE INSTALLATION OF THE ELECTRICAL WORK SHALL BE COORDINATED WITH
THE WORK OF THE OTHER TRADES.
10. THE INSTALLATION SHALL BE ACCOMPLISHED BY WORKERS SKILLED IN THIS
TYPE OF WORK. THE INSTALLATION SHALL BE MADE SO THAT THERE IS NO
DEGRADATION OF THE DESIGNED FIRE RATINGS.
11. THE CONTRACTOR SHALL INSTALL HIS WORK IN SUCH A MANNER AND AT SUCH
A TIME AS WILL REQUIRE A MINIMUM OF CUTTING AND PATCHING OF THE
BUILDING STRUCTURE.
12. 'PROVIDE', AS USED HERE ON THE DRAWINGS, IS AN ALL-INCLUSIVE TERM
REQUIRING CONTRACTOR TO FURNISH, INSTALL, WIRE, AND CONNECT ALL
SPECIFIED EQUIPMENT AS WELL AS COMPONENTS, ACCESSORIES, WIRING, AND
MOUNTING HARDWARE TO INSURE THAT SPECIFIED EQUIPMENT FUNCTIONS TO
MEET SYSTEM(S) REQUIREMENTS.
13. WHERE NEW-TO-EXISTING CONNECTIONS ARE INDICATED, THE CONTRACTOR
SHALL PROVIDE ALL MATERIALS (JUNCTION BOXES, CONDUIT, WIRE, AND
CONNECTIONS) AND LABOR REQUIRED TO MAKE THE CONNECTIONS.
14. UNLESS OTHERWISE NOTED, ALL POWER CIRCUIT CONDUCTORS SHALL BE
COPPER AND MINIMUM #12AWG. CONDUITS SHALL BE 3/4" MINIMUM.
15. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT EXISTING
UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE FOR
REPAIR OR REPLACEMENT OF THE UTILITIES OR OTHER PROPERTY DAMAGED
BY OPERATIONS IN CONJUNCTION WITH THE COMPLETION OF THIS WORK.
16. ALL BOLTS, NUTS, WASHERS, ETC. USED FOR GROUNDING AND BONDING
CONNECTIONS SHALL BE COPPER. CONTRACTOR SHALL UTILIZE CONNECTORS
TO PREVENT GALVANIC ACTION.
17. FINAL ACCEPTANCE WILL DEPEND UPON SATISFACTORY PERFORMANCE OF
EQUIPMENT. NO CONDUCTOR SHALL BE ENERGIZED UNTIL THE INSTALLATION
HAS BEEN APPROVED.
18. ALL EXPOSED ELECTRICAL CONDUIT VULNERABLE TO MECHANICAL DAMAGE
SHALL BE RIGID GALVANIZED STEEL, UNLESS NOTED OTHERWISE. ALL OTHER
CONDUIT INSIDE FACILITY SHALL BE ELECTRICAL METALLIC TUBING (EMT).
19. CONDUITS SHALL BE SUPPORTED BY SUITABLE CLAMPS, HANGERS OR STRAPS
TO PROVIDE A RIGID INSTALLATION. CONDUIT SUPPORTS SHALL NOT BE
FASTENED OR ATTACHED TO OTHER PIPES. PERFORATED STRAP HANGERS
WILL NOT BE ALLOWED. EMPTY CONDUIT SHALL BE THOROUGHLY SWABBED
OUT WITH DRY SWAB TO REMOVE MOISTURE AND DEBRIS BEFORE WIRE IS
DRAWN IN. END OF CONDUIT SHALL BE TIGHTLY PLUGGED UNTIL WIRE IS
PULLED. NO CONDUIT SHALL BE LOCATED TO IMPAIR THE STRENGTH OF
STRUCTURAL MEMBERS. MAKE CHANGES IN DIRECTION OF RUNS WITH
SYMMETRICAL BENDS. MAKE FIELD MADE BENDS AND OFFSETS WITH HICKEY
OR CONDUIT BENDING MACHINE. DO NOT INSTALL CRUSHED OR DEFORMED
CONDUITS. AVOID TRAPPED CONDUITS. PREVENT PLASTER, DIRT, OR TRASH
FROM LODGING IN CONDUIT, BOXES, FITTINGS. FREE CLOGGED CONDUITS OF
OBSTRUCTIONS.
20. IN ACCORDANCE WITH NFPA 70, GROUND EXPOSED, NON-CURRENT CARRYING
METALLIC PARTS OF ELECTRICAL EQUIPMENT, METALLIC RACEWAY SYSTEMS,
GROUNDING CONDUCTOR IN METALLIC RACEWAYS.
21. FASTEN CONDUITS TO SHEET METAL BOXES AND CABINETS WITH TWO
LOCKNUTS WHERE REQUIRED BY NFPA 70, WHERE INSULATED BUSHINGS ARE
USED, AND WHERE BUSHINGS CANNOT BE BROUGHT INTO FIRM CONTACT WITH
THE BOX; OTHERWISE, USE MINIMUM SINGLE LOCKNUT AND BUSHING.
LOCKNUTS SHALL HAVE SHARP EDGES FOR DIGGING INTO WALLS OF METAL
ENCLOSURE. INSTALL BUSHINGS ON ENDS OF CONDUITS, AND PROVIDE
INSULATING TYPE WHERE REQUIRED BY NFPA 70.
22. PROVIDE AND INSTALL AT WALL OR FLOOR PENETRATIONS A PERMANENT FIRE
STOP SYSTEM. THE SYSTEM SHALL CONSIST OF A WATER BASED FIRE STOP
COMPOUND AS THE FILL, VOID, OR CAVITY MATERIAL ALONG WITH
APPROPRIATE DAMMING MATERIAL (AS PER MANUFACTURER'S INSTRUCTIONS).
THE FIRE STOP COMPOUND SHALL NOT CONTAIN ANY SOLVENTS, INORGANIC
FIBERS, OR SILICONE COMPOUNDS AND SHALL NOT REQUIRE HEAT TO
ACTIVATE THE SEAL. THE FIRE STOP COMPOUND SHALL BE ONE-PART
MATERIALS, REQUIRING NO CRITICAL MIXING. THE PENETRATION SEAL
MATERIAL MUST BE UNAFFECTED BY MOISTURE AND MUST MAINTAIN THE
INTEGRITY OF THE FLOOR OR WALL ASSEMBLY FOR ITS RATED TIME PERIOD
WHEN TESTED IN ACCORDANCE WITH ASTM E84. THE SYSTEM SHALL BE UL
CLASSIFIED AND INSTALLED TO PROVIDE A 2 HOUR FIRE RATING. THE
PENETRATION FIRE STOP MATERIAL SHALL BE FLAME-SAFE FS1900 SERIES
COMPOUND AS MANUFACTURED BY GRACE CONSTRUCTION PRODUCTS OR
EQUAL.
23. DEVICE PLATES FOR SWITCHES AND RECEPTACLES SHALL BE SUITABLY
MARKED, SHOWING THE PANEL AND CIRCUIT NUMBER OF THE SOURCE.
REQUIRED MARKING SHALL CONSIST OF A SELF-ADHESIVE LABEL HAVING 1/4
INCH EMBOSSED LETTERS.
24. DAMAGE DONE TO ZINC COATING OF GALVANIZED CONDUIT, BOXES, AND
FITTINGS, INCLUDING EXPOSED CONDUIT THREADS AND ZINC FINISHES
SCRATCHING, SHALL BE REPAIRED BY CLEANING, PREPPING, AND COATING
DAMAGED SURFACE WITH INORGANIC ZINC COMPOUND.
25. PROVIDE ELECTRICAL CONDUIT AS FOLLOWS:
- RIGID GALVANIZED STEEL - ABOVE GRADE OUTSIDE AND INSIDE WHEN
SUBJECT TO PHYSICAL DAMAGE
- EMT - ABOVE GRADE INSIDE WHERE NOT SUBJECT TO PHYSICAL DAMAGE
- PVC SCHEDULE 40 - BELOW GRADE
- PVC SCHEDULE 80 - BELOW GRADE WHERE SUBJECT TO PHYSICAL DAMAGE
26. CONTRACTOR SHALL PROTECT THE GREEN AREAS WHERE DEMOLITION AND/OR
NEW CONSTRUCTION WORK WILL BE PERFORMED. ALL GRASSED AREAS
DISTURBED ARE TO BE SODDED AND WATERED UNTIL ACCEPTANCE. SOD
DISTURBED AREAS TO MATCH EXISTING.
ENGINEER OF RECORD (E.O.R.)
MIKE PILO, FL PE #50067
ALPHA MRC, INC., #AA0003182/ #IB0001162
2395 N. COURTENAY PKWY, SUITE 102
MERRITT ISLAND, FL 32953
321-449-9455
ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS
SEQUENCING OF WORK:
REFER TO E-002 AND E-003 FOR SEQUENCE OF WORK NOTES
APPLICABLE TO EACH INDIVIDUAL SITE.
DISSIMILAR METALS:
CONTRACTOR SHALL PROVIDE ADEQUATE SEPARATION OF
DISSIMILAR METALS BY APPROPRIATE MEANS, SUCH AS 15#
SEPARATION FELT FOR ROOFS AND ASPHALTIC TAPE,
NEOPRENE TAPE, PEEL AND STICK TAPE, OR ASPHALTIC PAINT
AT OTHER LOCATIONS AS REQUIRED.
ALL CONNECTORS, FASTENERS, BOLTS, ETC., SHALL BE
SELECTED IN ORDER TO PREVENT OR MINIMIZE ANY GALVANIC
REACTION BETWEEN DISSIMILAR METALS. AND UNLESS
OTHERWISE NOTED PROVIDE 304 STAINLESS STEEL.
APPLICABLE CODES
WORK SHALL BE IN COMPLIANCE WITH THE FOLLOWING CODES AND
THEIR LATEST REVISION AND WITH PROJECT SPECIFICATIONS:
BUILDING CONSTRUCTION AND SAFETY NFPA 5000
NATIONAL ELECTRIC CODE/INTERNATIONAL
ELECTRICAL CODE SERIES, NEC - NFPA 70
GENERAL BUILDING REQUIREMENTS UFC 1-200-012016
INTERIOR ELECTRICAL SYSTEMS UFC 3-520-01
NEW - TO BE INSTALLED
GROUNDING CONDUCTOR, BELOW GRADEG
NEW UNDERGROUND
PRIMARY SERVICE FEEDER
EXISTING UNDERGROUND
PRIMARY FEEDER TO REMAIN
E
TO BE REMOVED
NEW UNDERGROUND
SECONDARY SERVICE FEEDER
EXISTING UNDERGROUND SECONDARY
SERVICE FEEDER TO REMAIN
ES
(ALL MAY NOT BE USED)
ELECTRICAL SYMBOLS LEGEND:
PANELBOARD - EXISTING TO REMAIN - SEE PANEL
SCHEDULES FOR SPECIFIC INFORMATION (PLAN VIEW)
DISCONNECT SWITCH NON-FUSED, NUMBER INDICATES
SWITCH SIZE, 3-POLE UNLESS OTHERWISE NOTE;
EXTERIOR DISCONNECTS SHALL BE NEMA 4X ST. STL.
SPD
EQUIPMENT ENCLOSURE ON SINGLE
LINE DIAGRAM AND/OR EXISTING
UNDERGROUND TRENCHES/UTILITIES
SURGE PROTECTION DEVICE
JUNCTION BLOCK
TRANSFORMER (PLAN VIEW)
TRANSFORMER, SIZE AND RATING AS
INDICATED (DIAGRAM VIEW)
CIRCUIT BREAKER, 3-POLE, NUMBER
INDICATE STRIP RATING WHERE APPLICABLE
GROUNDING ELECTRODE, GROUND
FUSED SWITCH
CONDUIT - CHANGE OF
ELEVATION (PLAN VIEW ONLY)
G
GENERATOR
FUSED SWITCH
PANELBOARD - EXISTING TO BE DEMOLISHED - SEE PANEL
SCHEDULES FOR SPECIFIC INFORMATION (PLAN VIEW)
PANELBOARD EXISTING TO BE MODIFIED AND/OR NEW - SEE
PANEL SCHEDULES FOR SPECIFIC INFORMATION (PLAN VIEW)
M
EQUIPMENT CENTER LINE℄
MEDIUM VOLTAGE CABLE TERMINATION
EXISTING - TO REMAIN
NON-FUSED SWITCH
NEW PENETRATION ON EXISTING WALL
EXISTING WALL - TO REMAIN
MOTOR
EXISTING WALL TO BE DEMOLISHED
EXISTING UNDERGROUND
PRIMARY FEEDER TO BE REMOVED
E
EXISTING UNDERGROUND SECONDARY
SERVICE FEEDER TO BE REMOVED
E
ES
ES
ABBREVIATIONS:
UNDERGROUND TRENCHES/NEW
DIRECTLY BURIED FEEDERS
SIDEWALK AND/OR PAVEMENT AREA TO BE
REMOVED, INSTALL AND/OR REPAIR AND
NEW TRANSFORMER CONCRETE PADS
E-001
F
L A
B O
Y M
A
L L E
N
M
P
I L O
G E
N E
R A
L
N
O T
E S
L
E G
E N
D
A N
D
A
B B
R E
V I A
T I O
N S
L
C
O L E
M A
N
S X
F
G
B
E A
R D
R E
P A
E
C T
R I C
A L
T R
A N
S F
O R
M E
R S
V
A R
I O
U S
S X
F
P A
F B
F
L
AREA OF WORK
SOLID WASTE MANAGEMENT UNIT (SWMU)
A m r c w k s p r o j e c t s R
A E I S C
C A
F S P
A F B
A
N N
E X
E S R
A E I S R e c
T r a n s f
V a r D r a w i n g s E d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p c
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
ENGINEER OF RECORD (E.O.R.)
MIKE PILO, FL PE #50067
ALPHA MRC, INC., #AA0003182/ #IB0001162
2395 N. COURTENAY PKWY, SUITE 102
MERRITT ISLAND, FL 32953
321-449-9455
ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS
E-002
F
L A
B O
Y M
A
L L E
N
M
P
I L O
S E
Q U
E N
W
O R
K
N
O T
L
C
O L E
M A
N
S X
F
G
B
E A
R D
R E
P A
E
C T
R I C
A L
T R
A N
S F
O R
M E
R S
V
A R
I O
U S
S X
F
P A
F B
F
L
FACILITY 429 - SEQUENCE OF WORK NOTES:
EXISTING CONDITIONS:
TRANSFORMERS: 3 EA. SINGLE-PHASE 75 KVA TRANSFORMERS INSIDE STANDALONE VAULT (FACILITY 429)
PRIMARY: FED UNDERGROUND FROM SW #68
SECONDARY: TWO 120/208V SERVICE FEEDS AS DESCRIBED BELOW
· 700 AMP SERVICE TO FACILITY 404 (TO BE UPGRADED TO 900 AMPS ON ANOTHER PROJECT), LANDING
ON AN ENCLOSED CIRCUIT BREAKER MAIN IN MECHANICAL/ELECTRICAL ROOM. BUILDING IS
SCHEDULED FOR A RENOVATION WHICH INCLUDES A NEW MAIN PANEL AND A NEW SERVICE FEEDER.
CE IS PROPOSING A NEW HANDHOLE TO BE LOCATED NEAR THE VAULT, FOR THE PURPOSE OF
BECOMING AN INTERCEPT-POINT FOR THE SERVICE FEEDER FROM THE NEW TRANSFORMER.
· 175 AMP SERVICE TO FACILITY 401, LANDING ON A MAIN PANELBOARD IN MECHANICAL/ELECTRICAL
ROOM.
PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):
1. INSTALL NEW PAD-MOUNTED TRANSFORMER NEAR THE EXISTING VAULT AND NEAR PRIMARY
DUCTBANK AND NEAR UNDERGROUND SERVICE FOR BUILDING 404.
2. UNEARTH PRIMARY DUCTBANK NEAR TRANSFORMER AND CUT CONCRETE ENCASEMENT TO EXPOSE
ONE SPARE CONDUIT. EXTEND CONDUIT INTO NEW TRANSFORMER'S PRIMARY COMPARTMENT. RUN
NEW 13.2 KV CABLE FROM SW #68 TO NEW TRANSFORMER AND PREPARE CABLE-END TERMINATIONS
FOR CONNECTION.
3. INSTALL NEW SERVICE HANDHOLE BETWEEN NEW TRANSFORMER AND EXISTING UNDERGROUND
SERVICE FOR BUILDING 404, RUN NEW SERVICE FEEDER FROM TRANSFORMER TO HANDHOLE.
UNEARTH EXISTING SERVICE FEEDER TO FACILITY 404 NEAR NEW HANDHOLE IN PREPARATION FOR
INTERCEPTING EXISTING FEEDER AND RE-ROUTING INTO HANDHOLE.
4. RUN NEW UNDERGROUND SERVICE FEEDER FROM NEW TRANSFORMER TO MECHANICAL/ELECTRICAL
ROOM IN FACILITY 401.
5. SCHEDULE SHORT OUTAGE FOR BOTH FACILITY 404 AND FACILITY 401. DURING THE OUTAGE, PERFORM
THE FOLLOWING WORK: INTERCEPT EXISTING FACILITY 404 SERVICE FEEDER, RE-ROUTE INTO NEW
HANDHOLE, AND SPLICE EXISTING SERVICE CONDUCTORS WITH NEW. CONNECT NEW FACILITY 401
SERVICE FEEDER AT TRANSFORMER AND AT SERVICE MAIN. DISCONNECT EXISTING VAULT
TRANSFORMERS FROM SW #68, AND CONNECT NEW TRANSFORMER PRIMARY.
6. AFTER OUTAGE, REMOVE VAULT TRANSFORMERS, WIRING, EQUIPMENT, AND ACCESSORIES. REMOVE
VAULT BUILDING.
7. REPLACE EXISTING MAIN PANEL IN FACILITY 401, PRESERVE AND RECONNECT EXISTING BRANCH
FEEDERS TO NEW PANEL. NOTE: CONTRACTOR TO WORK AROUND NEC CODE VIOLATIONS IN MECH
ROOM AND IS NOT RESPONSIBLE FOR CORRECTIVE ACTION DOWNSTREAM OF MAIN PANEL.
TEMPORARY GENERATOR REQUIREMENTS:
· FACILITY 404: DUE TO THE OCCUPANCY NATURE OF FACILITY 404, A GENERATOR CANNOT RUN
DURING THE NIGHT, PROPOSED STEP #5 MUST TAKE PLACE DURING NORMAL BUSINESS HOURS AND
TEMPORARY GENERATOR WILL BE REQUIRED TO PROVIDE POWER DURING THAT TIME PERIOD (FOR
TEMPORARY GENERATOR INFORMATION, REFER TO SCHEDULE ON DRAWING E-601).
· FACILITY 401: A TEMPORARY GENERATOR WILL BE REQUIRED TO PROVIDE POWER DURING
PROPOSED STEP #5 (FOR TEMPORARY GENERATOR INFORMATION, REFER TO SCHEDULE ON
DRAWING E-601).
FACILITY 546 - SEQUENCE OF WORK NOTES:
EXISTING CONDITIONS:
TRANSFORMERS: 3 EA. SINGLE-PHASE 100 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 546
PRIMARY: FED UNDERGROUND FROM SW #48A.
NOTE: SW #48A ALSO FEEDS AN EXISTING PAD-MOUNTED 480/277V TRANSFORMER
SERVING FACILITY 546, TO REMAIN.
SECONDARY: ONE 120/208V SERVICE FEED AS DESCRIBED BELOW.
· 1000 AMP SERVICE TO MAIN FUSE-BASED PANEL LOCATED IN JANITOR ROOM. THE EXISTING GEAR IS
OBSOLETE AND UNSERVICEABLE, THERE ARE SEVERAL NEC CODE VIOLATIONS RELATED TO PANEL, SUB-PANEL, AND DISCONNECT CLEARANCES, AND GROUNDING OF BRANCH FEEDERS. BRANCH
FEEDERS CONNECTED TO THE DISTRIBUTION EQUIPMENT ARE AGED AND WITH BRITTLE INSULATION.
THE WORKING SPACE IS CONGESTED AND SHARED WITH SINKS, WATER PIPING, AND EQUIPMENT
UNRELATED TO THE ELECTRICAL DISTRIBUTION. THE SPACE IS NOT SUITABLE AS AN ELECTRICAL
ROOM AND THERE IS NO PRACTICAL WAY TO REPLACE THE MAIN PANEL WITHOUT RISKING DAMAGE
TO THE EXISTING BRANCH CIRCUIT CONDUCTORS, OR TO RESOLVE THE CLEARANCE ISSUES. IT IS
RECOMMENDED THE DISTRIBUTION SYSTEM IS LEFT UNDISTURBED UNTIL A COMPLETE RENOVATION
CAN BE UNDERTAKEN.
PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):
1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA N OF FACILITY 546, AND
ADJACENT TO EXISTING 480/277V PAD-MOUNTED TRANSFORMER.
2. RUN PRIMARY DUCTBANK FROM SW #48A TO TRANSFORMER, AND INSTALL NEW PRIMARY CABLES.
TERMINATE WITH ELBOWS AND LEAVE READY TO CONNECT AT SWITCH.
3. RUN NEW FACILITY 546 UNDERGROUND FEEDER FROM NEW TRANSFORMER TO VAULT, THEN RUN
FEEDER IN EXPOSED CONDUIT INSIDE VAULT.
4. DISCONNECT EXISTING TRANSFORMERS' SECONDARY FEEDER CABLES. INTERCEPT EXISTING
SECONDARY SERVICE CABLES/CONDUIT INSIDE VAULT WITH A NEW PULL BOX, TERMINATE NEW
SERVICE FEEDER IN PULL BOX, AND SPLICE NEW SERVICE CABLES WITH EXISTING.
5. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL ACCESSORIES AND PRIMARY CABLES.
6. ENERGIZE NEW TRANSFORMER AND MAIN DISTRIBUTION SYSTEM.
TEMPORARY GENERATOR REQUIREMENTS:
· CONSTRUCTING THE NEW SYSTEM AROUND THE EXISTING, AND SWITCHING OVER AT THE END, WILL
MINIMIZE OR ELIMINATE THE REQUIREMENT FOR A TEMPORARY GENERATOR. THE OUTAGE WOULD
BE REQUIRED REGARDLESS DURING MAIN SERVICE SWITCHOVER.
FACILITY 720 - SEQUENCE OF WORK NOTES:
EXISTING CONDITIONS:
TRANSFORMERS: 3 EA. SINGLE-PHASE 100 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 720
PRIMARY: FED UNDERGROUND FROM JUNCTION BLOCK NEXT TO SW #47
SECONDARY: ONE 120/208V SERVICE FEED AS DESCRIBED BELOW.
· 1000 AMP SERVICE TO FACILITY 720, LANDING ON A MAIN PANEL IN ELECTRICAL ROOM ADJACENT TO
VAULT. PANEL IS IN DISMAL CONDITION AND SO ARE BRANCH CIRCUIT CONDUITS AND AUXILIARY
GUTTERS. IT IS NOT RECOMMENDED THE EXISTING BRANCH CIRCUIT CONDUITS ARE REMOVED FROM
THE PANEL ENCLOSURE, AS THIS WOULD PRESENT A HIGH RISK FOR DAMAGING EXISTING CABLES
AND REQUIRING DOWNSTREAM WORK IN EXCESS OF THE ORIGINAL SCOPE.
PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):
1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA NORTHWEST OF FACILITY 720.
2. INSTALL NEW MAIN PANEL IN ELECTRICAL ROOM, AS CLOSE AS POSSIBLE TO EXISTING PANEL. NEW
PANEL TO CONTAIN ALL REQUIRED BRANCH CIRCUIT BREAKERS TO FEED ALL EXISTING MAIN PANEL
DOWNSTREAM CIRCUITS.
3. INSTALL NEW UNDERGROUND SERVICE FEEDER FROM NEW TRANSFORMER TO NEW MAIN PANEL IN
ELECTRICAL ROOM.
4. INSTALL NEW 13.2KV DUCTBANK AND PRIMARY FEEDER FROM SW #47 JUNCTION BLOCK TO NEW
TRANSFORMER. LEAVE PRIMARY ELBOWS READY FOR CONNECTION.
5. SCHEDULE OUTAGE FOR FACILITY 720. DE-ENERGIZE EXISTING TRANSFORMERS AND DISCONNECT
PRIMARY FEEDERS.
6. REMOVE ALL INTERNAL COMPONENTS OF EXISTING MAIN PANEL, LEAVE BRANCH FEEDER
CONDUCTORS IN PLACE. REMOVE SERVICE FEEDER FROM EXISTING MAIN PANEL.
7. USE EXISTING MAIN PANEL ENCLOSURE AS A JUNCTION BOX TO SPLICE AND EXTEND EXISTING
BRANCH FEEDERS TO NEW MAIN PANEL, AND RECONNECT.
8. PROVIDE A GALVANIZED STEEL COVER FOR THE EXISTING MAIN PANEL ENCLOSURE, COVER SHALL BE
CUSTOM FABRICATED TO BE THE EXACT SIZE OF ENCLOSURE, AND SCREW HOLES SHALL MATCH IN
QUANTITY AND LOCATION.
9. ENERGIZE NEW TRANSFORMER AND MAIN PANEL.
10. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL ACCESSORIES.
TEMPORARY GENERATOR REQUIREMENTS:
· CONSTRUCTING THE NEW SYSTEM AROUND THE EXISTING, AND SWITCHING OVER AT THE END, WILL
ELIMINATE THE REQUIREMENT FOR A TEMPORARY GENERATOR. PROVIDING A TEMPORARY
GENERATOR FOR THE OUTAGE REQUIRED DURING MAIN PANEL BRANCH FEEDER SWITCHOVER, IS
NOT A PRACTICAL OPTION.
FACILITY 806 - SEQUENCE OF WORK NOTES:
EXISTING CONDITIONS:
TRANSFORMERS: 1 EA. 3-PHASE 150 KVA TRANSFORMER (LIVE FRONT) INSIDE GENERATOR BUILDING
(FACILITY 806)
PRIMARY: FED UNDERGROUND FROM JUNCTION BLOCK ADJACENT TO BUILDING, AND THROUGH A
FLOOR TRENCH LOCATED UNDER TRANSFORMER.
SECONDARY: ONE 480V SERVICE FEED TO THE EXISTING AIR FIELD LIGHTING SYSTEM AUTOMATIC
TRANSFER SWITCH LOCATED IN THE SAME BUILDING. THE DOWNSTREAM SYSTEMS ARE
AGED AND OBSOLETE.
PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):
1. DISCONNECT AND REMOVE EXISTING PAD-MOUNTED TRANSFORMER. REMOVE PRIMARY CABLE TO
EXISTING JUNCTION BLOCK. LEAVE SECONDARY SERVICE CONDUCTORS IN PLACE.
2. INSTALL NEW PAD-MOUNTED, DEAD FRONT TRANSFORMER IN PLACE OF THE EXISTING.
3. RECONNECT EXISTING SECONDARY CONDUCTORS.
4. INSTALL NEW PRIMARY CABLES FROM EXISTING JUNCTION BLOCK TO NEW TRANSFORMER.
5. RE-ENERGIZE SYSTEM.
NOTE: NEW TRANSFORMER CAN BE REUSED AFTER FACILITY RENOVATION OR REMOVAL, AND
REINSTALLED ON NEW PAD.
TEMPORARY GENERATOR REQUIREMENTS:
· THE AIR FIELD LIGHTING SYSTEM IS BACKED UP WITH AN EXISTING GENERATOR, WHICH CAN RUN
DURING THE CONSTRUCTION PERIOD.
FACILITY 905 - SEQUENCE OF WORK NOTES:
EXISTING CONDITIONS:
TRANSFORMERS: 3 EA. SINGLE-PHASE 50 KVA TRANSFORMERS INSIDE STANDALONE VAULT (FACILITY 905)
PRIMARY: FED UNDERGROUND FROM SW #26
SECONDARY: TWO ACTIVE 480/277V SERVICE FEEDS AS DESCRIBED BELOW.
· 200 AMP SERVICE TO WESTWARD LIFT STATION GENERATOR BUILDING.
· 20 AMP SERVICE TO EXISTING PARKING AREA LIGHTING.
PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):
1. INSTALL NEW PAD-MOUNTED TRANSFORMER NEAR THE GENERATOR BUILDING.
2. RUN NEW 13.2KV FEEDER FROM SW #26 TO NEW TRANSFORMER, USING A COMBINATION OF SPARE
CONDUITS IN EXISTING DUCTBANK., AND NEW DUCTBANKS.
3. RUN NEW UNDERGROUND SERVICE FEEDER TO EXISTING ATS IN GENERATOR BUILDING.
4. RUN NEW UNDERGROUND FEEDER TO EXISTING AREA LIGHTING.
5. DISCONNECT ATS FROM EXISTING FEEDER AND RECONNECT TO NEW FEEDER.
6. REPLACE 3-WIRE FEEDERS WITH 4-WIRE FEEDERS, FROM EXISTING GENERATOR TO ATS, AND FROM
ATS TO HOUSE PANEL. KEEP OUTAGES TO A MINIMUM.
7. DISCONNECT EXISTING PRIMARY FROM SW #26, CONNECT NEW TRANSFORMER PRIMARY.
8. REMOVE VAULT TRANSFORMERS, WIRING, EQUIPMENT, AND ACCESSORIES. REMOVE VAULT BUILDING.
TEMPORARY GENERATOR REQUIREMENTS:
· THE LIFT STATION HAS A GENERATOR BACKUP, NO TEMPORARY GENERATOR POWER REQUIRED.
FACILITY 945 - SEQUENCE OF WORK NOTES:
EXISTING CONDITIONS:
TRANSFORMERS: 3 EA. SINGLE-PHASE 75 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 945
PRIMARY: FED UNDERGROUND FROM JUNCTION BLOCK NEXT TO SW #16
SECONDARY: TWO 120/208V SERVICE FEEDS AS DESCRIBED BELOW.
· 600 AMP SERVICE TO FACILITY TO A MAIN PANEL IN CHILLER ROOM ADJACENT TO VAULT. PANEL IS
OLD, FEEDS CHILLER EQUIPMENT AND SUB-PANELS.
· 600 AMP SERVICE TO A SECOND PANEL IN CHILLER ROOM PANEL IS OLD, FEEDS MECHANICAL
EQUIPMENT AND SUB-PANELS.
PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION)
1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA SOUTH OF FAC. 945.
2. RUN NEW SERVICE FEEDER FROM NEW TRANSFORMER TO CHILLER ROOM, TERMINATE NEAR EXISTING
MAIN PANEL.
3. RUN NEW 13.2KV DUCTBANK AND FEEDER FROM SW #16 TO NEW TRANSFORMER.
4. SCHEDULE OUTAGE FOR FACILITY 945.
5. REPLACE PANELS IN CHILLER ROOM BY DISCONNECTING EXISTING BRANCH CIRCUITS FROM EXISTING
PANELS AND REMOVING PANELS, AND REPLACING WITH NEW. EXTEND NEW FEEDER INTO NEW MAIN
PANEL'S MAIN BREAKER. NOTE: NEW PANELS TO CONTAIN ALL REQUIRED BRANCH CIRCUIT BREAKERS
TO FEED ALL EXISTING MAIN PANEL DOWNSTREAM CIRCUITS.
6. DISCONNECT EXISTING TRANSFORMERS AND FEEDERS. ENERGIZE NEW TRANSFORMER AND MAIN
PANEL.
7. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL ACCESSORIES.
8. INSTALL NEW LIGHT FIXTURE IN VAULT.
TEMPORARY GENERATOR REQUIREMENTS
· TEMPORARY GENERATOR WILL NOT BE REQUIRED.
A m r c w k s p r o j e c t s R
A E I S C
C A
F S P
A F B
A
N N
E X
E S R
A E I S R e c
T r a n s f
V a r D r a w i n g s E d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p c
Rectangle
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
ENGINEER OF RECORD (E.O.R.)
MIKE PILO, FL PE #50067
ALPHA MRC, INC., #AA0003182/ #IB0001162
2395 N. COURTENAY PKWY, SUITE 102
MERRITT ISLAND, FL 32953
321-449-9455
ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS
FACILITY 972 - SEQUENCE OF WORK NOTES:
EXISTING CONDITIONS:
TRANSFORMERS: 3 EA. SINGLE-PHASE 50 KVA TRANSFORMERS INSIDE STANDALONE VAULT (FACILITY 972)
PRIMARY: FED UNDERGROUND FROM SW #8
SECONDARY: TWO 120/208V SERVICE FEEDS AS DESCRIBED BELOW.
· 500 AMP UNDERGROUND SERVICE TO FACILITY 996, LANDING ON A RECENTLY INSTALLED MAIN PANELBOARD IN
MECHANICAL/ELECTRICAL ROOM. PROPOSING A NEW HANDHOLE TO BE LOCATED NEAR THE VAULT, TO INTERCEPT AND REUSE
THE EXISTING SERVICE FEEDER. MAIN PANELBOARD TO REMAIN.
· 100 AMP SERVICE TO A SMALL PANELBOARD ON THE EXTERIOR WALL OF THE VAULT, WITH A BRANCH FEEDER TO A
DISTRIBUTION PANEL IN BUILDING 997.
PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION)
1. INSTALL NEW PAD MOUNTED TRANSFORMER NEAR THE EXISTING VAULT.
2. RUN NEW FACILITY 996 UNDERGROUND FEEDER TO NEW SERVICE HANDHOLE INSTALLED NEXT TO THE POINT WHERE
EXISTING SERVICE CONDUITS ENTER THE VAULT.
3. RUN NEW FACILITY 997 UNDERGROUND FEEDER TO A POINT NEXT TO EXISTING PANEL WITHIN FACILITY.
4. RUN PRIMARY DUCTBANK FROM SW #8 TO TRANSFORMER, AND INSTALL NEW PRIMARY CABLES. TERMINATE WITH ELBOWS
AND LEAVE READY TO CONNECT AT SWITCH
5. SCHEDULE OUTAGE FOR BOTH FACILITY 996 AND 997.
6. DE-ENERGIZE EXISTING VAULT AND DISCONNECT PRIMARY AND SECONDARY CABLES FROM TRANSFORMERS.
7. INTERCEPT FACILITY 996 FEEDER, EXTEND INTO NEW HANDHOLE, AND SPLICE EXISTING CONDUCTORS WITH NEW.
8. CONNECT NEW SERVICE FEEDER TO 997 PANEL.
9. ENERGIZE NEW TRANSFORMER AND FACILITIES 996 & 997.
10. REMOVE VAULT TRANSFORMERS, WIRING, EQUIPMENT, AND ACCESSORIES. REMOVE VAULT BUILDING.
TEMPORARY GENERATOR REQUIREMENTS:
· THE NEW SYSTEM WILL BE INSTALLED AROUND THE EXISTING AS MUCH AS POSSIBLE. THE FEEDER INTERCEPTS (STEPS #7 & 8)
CAN BE UNDERTAKEN WITHIN A SHORT OUTAGE TIME, AS TO CURTAIL THE REQUIREMENT FOR TEMPORARY GENERATOR
POWER. IF THE CONTRACTOR EXPECTS THE OUTAGE DURATION TO EXCEED 8 HOURS, THEN A TEMPORARY GENERATOR SHALL
BE PROVIDED TO SUPPORT BOTH FACILITIES DURING OUTAGE WORK (FOR TEMPORARY GENERATOR INFORMATION, REFER TO
SCHEDULE ON DRAWING E-601).
FACILITY 985 - SEQUENCE OF WORK NOTES:
EXISTING CONDITIONS:
TRANSFORMERS: 3 EA. SINGLE-PHASE 100 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 985
NOTE: 13.2KV PRIMARY RUNS THRU 986 VAULT BEFORE LANDING ON 985 VAULT
PRIMARY: FED UNDERGROUND FROM SW #12 AND THRU 986 VAULT
NOTE: 13.2 KV FEEDER LANDS ON A DEAD-FRONT JUNCTION BLOCK INSIDE VAULT THAT ALSO FEEDS EXISTING 300
KVA PAD-MOUNTED 480/277V TRANSFORMER, WHICH IS TO REMAIN.
SECONDARY: TWO 120/208V SERVICE FEEDS AS DESCRIBED BELOW.
· 1000 AMP SERVICE TO MAIN DISCONNECT CIRCUIT BREAKER IN ELECTRICAL ROOM ADJACENT TO VAULT. THE MAIN CIRCUIT
BREAKER FEEDS ONE DOWNSTREAM PANELBOARD. REPLACEMENT USING THE EXISTING SPACE IS NOT PRACTICAL: FIRST, MODERN 1000 AMP DISCONNECT ENCLOSURES LARGER THAN THE EXISTING UNIT AND WOULD NOT FIT IN THE SAME SPACE.
SECONDLY, THE INSULATION OF BRANCH FEEDER CONDUCTORS IS AGED, BRITTLE, AND IN SOME CASES IN VIOLATION OF THE
NEC, ATTEMPTING TO DISCONNECT BRANCH FEEDERS FROM THE EXISTING DISTRIBUTION EQUIPMENT FOR REUSE ON NEW
EQUIPMENT COULD CREATE A DANGEROUS CONDITION. THIRD, THE ROOM IS SHARED WITH COMM SERVICE, FURTHER
INCREASING THE CONGESTION. THIS ROOM NEEDS TO BE LEFT UNDISTURBED UNTIL A FULL FACILITY RENOVATION CAN BE
UNDERTAKEN.
· 400 AMP SERVICE FEEDER TO FACILITY 988.
PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):
1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA W OF FACILITY 985 AND CLOSE TO VAULT.
2. RUN PRIMARY CONDUIT FROM VAULT TO TRANSFORMER, AND INSTALL NEW PRIMARY CABLES. TERMINATE WITH ELBOWS AND
LEAVE READY TO CONNECT AT JUNCTION BLOCK.
3. RUN NEW FACILITY 985 AND FACILITY 988 UNDERGROUND FEEDERS FROM NEW TRANSFORMER TO VAULT, THEN RUN FEEDERS
IN EXPOSED CONDUITS INSIDE VAULT TO TWO NEW SERVICE DISCONNECTS LOCATED BACK-TO-BACK WITH MAIN ELECTRICAL
ROOM.
4. DISCONNECT EXISTING TRANSFORMERS AND FEEDERS. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL
ACCESSORIES.
5. EXTEND EXISTING SECONDARY SERVICES INTO NEW SERVICE DISCONNECTS. CONNECT NEW TRANSFORMER PRIMARY AT
JUNCTION BLOCK.
6. ENERGIZE NEW TRANSFORMER AND MAIN DISTRIBUTION SYSTEM.
TEMPORARY GENERATOR REQUIREMENTS:
· CONSTRUCTING THE NEW SYSTEM AROUND THE EXISTING, AND SWITCHING OVER AT THE END, WILL ELIMINATE THE
REQUIREMENT FOR A TEMPORARY GENERATOR. THE OUTAGE WOULD BE REQUIRED REGARDLESS DURING MAIN SERVICE
SWITCHOVER.
FACILITY 986 - SEQUENCE OF WORK NOTES:
EXISTING CONDITIONS:
TRANSFORMERS: 3 EA. SINGLE-PHASE 100 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 986
PRIMARY: FED UNDERGROUND FROM SW #12.
NOTE: 13.2 KV FEEDER LANDS ON A DEAD-FRONT JUNCTION BLOCK INSIDE VAULT THAT ALSO FEEDS EXISTING
1000 KVA PAD-MOUNTED 480/277V TRANSFORMER, WHICH IS TO REMAIN.
SECONDARY: THREE 120/208V SERVICE FEEDS AS DESCRIBED BELOW.
· 1000 AMP SERVICE TO MAIN DISCONNECT CIRCUIT BREAKER IN ELECTRICAL ROOM ADJACENT TO VAULT. THE MAIN CIRCUIT
BREAKER FEEDS TWO DOWNSTREAM PANELBOARDS AND OTHER SMALLER PANELS & DISCONNECTS CRAMMED IN THE
UNDERSIZED ROOM. THE EXISTING GEAR IS OBSOLETE AND UNSERVICEABLE, HOWEVER REPLACEMENT USING THE EXISTING
SPACE IS NOT PRACTICAL: FIRST, PRESENT WORKING CLEARANCES FOR EXISTING EQUIPMENT ARE NOT IN ACCORDANCE WITH
THE NEC, AND INSTALLATION OF NEW EQUIPMENT WITHIN THE AVAILABLE SPACE WOULD NOT CORRECT THIS ISSUE.
SECONDLY, THE INSULATION OF BRANCH FEEDER CONDUCTORS IS AGED, BRITTLE, AND IN SOME CASES IN VIOLATION OF THE
NEC, ATTEMPTING TO DISCONNECT BRANCH FEEDERS FROM THE EXISTING DISTRIBUTION EQUIPMENT FOR REUSE ON NEW
EQUIPMENT COULD CREATE A DANGEROUS CONDITION. THIRD, THE ROOM IS SHARED WITH COMM SERVICE, FURTHER
INCREASING THE CONGESTION. THIS DISTRIBUTION SYSTEM NEEDS TO BE LEFT UNDISTURBED UNTIL A FULL FACILITY
RENOVATION CAN BE UNDERTAKEN AND THE ROOM CAN BE GUTTED AND ADJUSTED IN SIZE.
· 600 AMP SERVICE TO MAIN DISCONNECT CIRCUIT BREAKER IN SAME ROOM AS ABOVE, SAME CONDITIONS APPLY.
· 400 AMP SERVICE TO DISCONNECT LABELED “NOT USED / NO LOAD”. WILL NOT BE RE-FED.
PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):
1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA W OF FACILITY 986 AND CLOSE TO VAULT.
2. RUN PRIMARY CONDUIT FROM VAULT TO TRANSFORMER, AND INSTALL NEW PRIMARY CABLES. TERMINATE WITH ELBOWS AND
LEAVE READY TO CONNECT AT JUNCTION BLOCK.
3. RUN TWO NEW FACILITY 986 UNDERGROUND FEEDERS FROM NEW TRANSFORMER TO VAULT, THEN RUN FEEDERS IN EXPOSED
CONDUIT INSIDE VAULT TO TWO NEW SERVICE DISCONNECTS LOCATED BACK-TO-BACK WITH MAIN BREAKERS IN ELECTRICAL
ROOM.
4. DISCONNECT EXISTING TRANSFORMERS AND FEEDERS. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL
ACCESSORIES.
5. EXTEND EXISTING SECONDARY SERVICE INTO NEW SERVICE DISCONNECT. CONNECT NEW TRANSFORMER PRIMARY AT
JUNCTION BLOCK.
6. ENERGIZE NEW TRANSFORMER AND MAIN DISTRIBUTION SYSTEM.
TEMPORARY GENERATOR REQUIREMENTS:
· CONSTRUCTING THE NEW SYSTEM AROUND THE EXISTING, AND SWITCHING OVER AT THE END, WILL ELIMINATE THE
REQUIREMENT FOR A TEMPORARY GENERATOR. THE OUTAGE WOULD BE REQUIRED REGARDLESS DURING MAIN SERVICE
SWITCHOVER.
E-003
F
L A
B O
Y M
A
L L E
N
M
P
I L O
S E
Q U
E N
W
O R
K
N
O T
L
C
O L E
M A
N
S X
F
G
B
E A
R D
R E
P A
E
C T
R I C
A L
T R
A N
S F
O R
M E
R S
V
A R
I O
U S
S X
F
P A
F B
F
L
A m r c w k s p r o j e c t s R
A E I S C
C A
F S P
A F B
A
N N
E X
E S R
A E I S R e c
T r a n s f
V a r D r a w i n g s E d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
ENGINEER OF RECORD (E.O.R.)
MIKE PILO, FL PE #50067
ALPHA MRC, INC., #AA0003182/ #IB0001162
2395 N. COURTENAY PKWY, SUITE 102
MERRITT ISLAND, FL 32953
321-449-9455
ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS
REFER TO ELECTRICAL GENERAL
NOTES ON DRAWING E-001.
ED-100
F
L A
B O
Y
M
A
L L E
N
M
P
I L O
F L
T
E M
O L
I T
I O
N
L
C
O L E
M A
N
S X
F
G
B
E A
R D
R E
P A
E
C T
R I C
A L
T R
A N
S F
O R
M E
R S
V
A R
I O
U S
S X
F
P A
F B
F
L
GENERAL NOTES - HAZARDOUS MATERIALS :
1. THERE SHALL BE NO HAZARDOUS AIR EMISSIONS FROM DEBRIS PER 29 CFR 1910. ANY SANDBLASTING OR NEEDLE-JET OPERATIONS MUST
BE APPROVED BY THE CONTRACTING OFFICER AND SHOULD HAVE FULL CONTAINMENT.
2. THE CONTRACTOR SHALL COMPLY WITH, BUT NOT LIMITED TO: AFI 32-7086, HAZARDOUS MATERIALS MANAGEMENT, FEBRUARY 2015 AND
THE 45TH SW HAZMAT TRACKING PROCEDURES FOR CONSTRUCTION AND SERVICE CONTRACTORS. NO HAZARDOUS MATERIALS ARE
ALLOWED TO BE BROUGHT ON TO ANY 45 SW INSTALLATION WITHOUT PRIOR APPROVAL. THE CONTRACTOR SHALL CONTACT THE 45
CES/CEIE HAZARDOUS MATERIALS PROGRAM MANAGER AT 321-494-9268 OR 321-543-1338 AND/OR ARTHUR.LORENZ.CTR@US.AF.MIL TO
REVIEW HAZARDOUS MATERIALS AUTHORIZATION PROCEDURES PRIOR TO HAZARDOUS MATERIALS BEING BROUGHT ON TO 45 SW
FACILITIES.
3. THE PROJECT WHICH MAY CONTAIN HAZARDOUS CHEMICALS, THE SDS FOR THOSE PRODUCTS SHALL BE SUBMITTED TO THE TOXIC
SUBSTANCES REVIEWER FOR REVIEW TO DETERMINE PERSONAL PROTECTIVE EQUIPMENT REQUIREMENT FOR PERSONNEL USING
PRODUCTS ALONG WITH GC'S SAFETY PLAN, PRIOR TO START OF WORK.
4. UNIVERSAL WASTE ENCOUNTERED DURING DEMOLITION WORK SHALL BE MANAGED AND DISPOSED OF IN ACCORDANCE WITH F.A.C.
62-730.185, 40 CFR PART 273 AND 45SW OPLAN 19-14.
5. THE REQUIREMENTS ESTABLISHED IN THE OSHA STANDARD FOR LEAD, CADMIUM AND CHROMIUM IN CONSTRUCTION, 29 CFR 1926.62, 29 CFR
1926.1127 AND 29 CFR 1926.1126, RESPECTIVELY, MUST BE COMPLIED WITH FOR ANY CONSTRUCTION, REFURBISHMENT, OR DEMOLITION
OPERATIONS WHICH INVOLVES THE DISTURBANCE OF PAINTS OR COATINGS WHICH MAY CONTAIN HEAVY METALS. THE LEAD, CADMIUM AND
CHROMIUM STANDARDS ESTABLISH SPECIFIC PERSONAL PROTECTIVE EQUIPMENT TO INCLUDE RESPIRATORY PROTECTION BASED ON THE
TYPE OF WORK TO BE PERFORMED.
6. PERSONNEL WHO UTILIZE RESPIRATORY EQUIPMENT SHALL COMPLY WITH OSHA STANDARD 29 CFR 1910.134. THE REQUIREMENTS FOR
PROTECTION OF PERSONNEL DURING DISTURBANCE OF COATINGS CONTAINING HEAVY METALS APPLY WHEN THE CONTENT HAS BEEN
IDENTIFIED AS "LOW". OSHA STANDARD 29 CFR 1926.62 DOES NOT INDICATE A LEVEL OF CONTENT LIMIT. IF LEAD IS PRESENT AT ANY LEVEL, THE STANDARD SHALL BE ADHERED. FOLLOW 45 SW GUIDANCE FOR THE REMOVAL OF MATERIALS AND COATINGS CONTAINING HEAVY
METALS.
7. THE GC SHALL UTILIZE HEAVY METALS SURVEY REPORTS PROVIDED AS AN APPENDIX TO THE SPECIFICATIONS IN ORDER TO COMPLETE THE
SCOPE OF WORK PER THE DRAWINGS AND SPECIFICATIONS. THE GC SHALL CONTACT THE CONTRACTING OFFICER IF THE PRESENCE OF
MATERIALS CONTAINING PCBS, ASBESTOS, AND/OR HEAVY METALS, INCLUDING LEAD, CADMIUM, OR CHROMIUM IS SUSPECTED OR
DISTURBED, AND HAS NOT BEEN IDENTIFIED BY THIS CONTRACT, BUT IS REQUIRED TO BE DISTURBED IN ORDER TO:
· PERFORM THE CONTRACT WORK;
· SAFELY ACCESS THE AREA OF WORK WITHOUT EXPOSURE TO HAZMAT ABOVE THE PEL;
· HAVE WORKERS PERFORM THE CONTRACT WORK WITHOUT EXPOSURE TO HAZMAT ABOVE PEL.
UNDER NO CIRCUMSTANCES SHALL ANY MATERIALS CONTAINING PCBS, ASBESTOS, AND/OR HEAVY METALS BE REMOVED WITHOUT THE
CONTRACTING OFFICER APPROVAL.
8. WORKERS SHALL UTILIZE RESPIRATORY PROTECTION PER 29 CFR 1910.134 AGAINST SILICA AND PARTICULATES WHEN DISTURBING
CONCRETE AND CMU DURING DEMOLITION AND REPAIR ACTIVITIES.
9. IF FRIABLE AND/OR REGULATED ASBESTOS CONTAINING MATERIAL (RACM) AS DEFINED BY F.A.C. 62-257.200 (17) IS IDENTIFIED OR
GENERATED DURING DEMOLITION ACTIVITIES, IT MUST BE REMOVED BY A LICENSED ASBESTOS CONTRACTOR AS DEFINED BY FL-STAT
469.001 (7). ACM REMOVAL MUST BE COMPLETED AS PER F.A.C. 62-257, FL-STAT 469 AND IN ACCORDANCE WITH SPECIFICATION SECTION 02 82
13.00 98, ASBESTOS ABATEMENT. FDEP FORM 62-257.900(1)(NOTICE OF DEMOLITION OR ASBESTOS RENOVATION) MUST BE FORWARDED TO
FDEP AT LEAST 20 WORKING DAYS PRIOR TO ACM REMOVAL.
FLAG NOTES - DEMOLITION:
1. EXISTING SINGLE PHASE TRANSFORMER (BANK OF 3 EA.) TO BE REMOVED, SEE ASSOCIATED SINGLE LINE DIAGRAM INDICATING
TRANSFORMERS' SIZE AND VOLTAGE. REMOVE ALL ASSOCIATED 13.2 KV LIVE WIRING, ACCESSORIES, STRUCTURES, INSULATORS, AND
TERMINATIONS. REMOVE ALL SECONDARY CONNECTIONS, WIRING, AND ASSOCIATED STRUCTURES.
2. EXISTING 3-PHASE LIVE-FRONT TRANSFORMER TO BE REMOVED.
3. EXISTING PRIMARY (13.2 KV) TRANSFORMER FEEDER IN CONCRETE ENCASED DUCTBANK. DISCONNECT CABLES AND REMOVE. CONCRETE
ENCASED CONDUITS TO BE ABANDONED.
4. EXISTING UNDERGROUND SERVICE FEEDER TO FACILITY 996 TO BE INTERCEPTED. EXCAVATE AROUND CONDUITS AT LOCATION INDICATED, AND EXCAVATE BETWEEN CONDUITS AND NEW HANDHOLE (SEE NEW CONSTRUCTION DRAWING E-161). CAREFULLY CUT CONDUITS
WITHOUT DAMAGING EXISTING CONDUCTORS, AND REMOVE A SECTION OF CONDUIT SUFFICIENTLY LONG TO ALLOW EXISTING CONDUCTORS
TO BE EXTENDED INTO NEW HANDHOLE. PROTECT EXISTING CONDUCTORS AND CONDUCTOR INSULATION FOR REUSE
5. EXISTING UNDERGROUND SECONDARY SERVICE FEEDER TO BE DISCONNECTED, CONDUCTORS SHALL BE REMOVED, UNDERGROUND
CONDUITS SHALL BE ABANDONED, EXPOSED PORTIONS OF CONDUITS SHALL BE REMOVED.
6. EXISTING SECONDARY SERVICE FEEDER TO BE DISCONNECTED FROM TRANSFORMER, CONDUCTORS SHALL REMAIN. PROTECT EXPOSED
CONDUCTORS FOR REUSE.
7. EXISTING UNDERGROUND SERVICE FROM VAULT PANEL TO PANEL IN FACILITY 997, TO BE REMOVED.
8. SAW-CUT, REMOVE AND DISPOSE OF EXISTING SECTIONS OF CONCRETE SIDEWALK AND/OR PAVEMENT TO ACCOMMODATE NEW FEEDERS.
9. EXISTING PANEL TO BE DE-ENERGIZED. ALL INTERIOR COMPONENTS (CIRCUIT BREAKERS, BUSES, HARDWARE, FRAMEWORK) SHALL BE
REMOVED. PANEL FEEDER SHALL BE REMOVED. BRANCH CIRCUIT FEEDERS SHALL REMAIN, LABEL AND PROTECT CONDUCTORS FOR REUSE.
NOTE: PANEL SHALL BE RE-PURPOSED AS A PULL BOX TO SPLICE EXISTING BRANCH FEEDER CONDUCTORS WITH NEW, CONTRACTOR SHALL
PROVIDE A 12-GAUGE GALVANIZED STEEL BOX COVER TO MATCH PANEL DIMENSIONS AND WITH MATCHING SCREW HOLES.
10. EXISTING PANEL TO BE REMOVED. PANEL FEEDER SHALL BE REMOVED. BRANCH FEEDER CONDUITS AND CONDUCTORS SHALL REMAIN IN
PLACE AND PROTECTED FOR REUSE. NOTE: CONDUITS SHALL BE TEMPORARILY SUPPORTED IN PLACE UNTIL NEW PANEL ENCLOSURE HAS
BEEN PUNCHED WITH ALL REQUIRED KO'S AND IS INSTALLED.
11. EXISTING PANEL TO REMAIN, SHOWN FOR REFERENCE.
12. EXISTING TRANSFORMER VAULT TO BE REMOVED. REMOVE ALL EXPOSED CONDUIT/WIRING, LIGHTING, DEVICES, MASONRY,FLOOR
FOUNDATION, AND ROOF. RESTORE GROUND AND GRASS TO MATCH SURROUNDINGS.
13. EXISTING TRANSFORMER VAULT TO BE REMOVED IN ITS ENTIRETY. REMOVE ALL EXPOSED CONDUIT/WIRING, LIGHTING, DEVICES, MASONRY, ROOF, AND FLOOR FOUNDATION. RESTORE GROUND AND GRASS TO MATCH SURROUNDINGS.
14. EXISTING VAULT TO REMAIN AFTER TRANSFORMER & ACCESSORY REMOVAL. EXISTING LIGHTING AND DEVICES TO REMAIN.
15. EXISTING ELECTRICAL EQUIPMENT TO BE REMOVED, REMOVE ALL ASSOCIATED CONDUIT, WIRE, AND ACCESSORIES.
16. EXISTING ELECTRICAL EQUIPMENT TO REMAIN UNDISTURBED, SHOWN FOR REFERENCE.
17. EXISTING 13.2 KV SWITCH TO REMAIN, SHOWN FOR REFERENCE.
18. EXISTING 13.2 KV JUNCTION BLOCK TO REMAIN, SHOWN FOR REFERENCE.
19. EXISTING 480V TRANSFORMER TO REMAIN, SHOWN FOR REFERENCE.
20. EXISTING PRIMARY (13.2 KV) FEEDER TO BE REMOVED. EXISTING DUCTBANK TO BE RE-USED.
21. EXISTING PRIMARY (13.2 KV) FEEDER TO BE REMOVED.
22. CORE-DRILL EXISTING CMU WALL ASSEMBLY AT LOCATIONS SHOWN ON PLAN. REMOVE AND DISPOSE OF DEMOLISHED CMU; AVOID DAMAGE
TO ADJACENT WALL SURFACE. PATCH AND REPAIR WALL SURROUND DAMAGED BY DEMOLITION WORK.
23. EXISTING UNDERGROUND SERVICE FEEDER TO FACILITY 404 TO BE INTERCEPTED. EXCAVATE AROUND CONDUITS AT LOCATION INDICATED, AND EXCAVATE BETWEEN CONDUITS AND NEW HANDHOLE (SEE NEW CONSTRUCTION DRAWING E-101). CAREFULLY CUT CONDUITS
WITHOUT DAMAGING EXISTING CONDUCTORS, AND REMOVE A SECTION OF CONDUIT SUFFICIENTLY LONG TO ALLOW EXISTING CONDUCTORS
TO BE EXTENDED INTO NEW HANDHOLE. PROTECT EXISTING CONDUCTORS AND CONDUCTOR INSULATION FOR REUSE.
24. EXISTING PRIMARY CONCRETE ENCASED DUCTBANK CONTAINING 13.2 KV FEEDER SERVING TRANSFORMER IN BUILDING 429. DUCTBANK
ALSO CONTAINS 3 EA. ADDITIONAL SPARE CONDUITS. CONTRACTOR SHALL EXCAVATE AROUND DUCTBANK AND IDENTIFY LOCATION OF
SPARES WITHIN ENCASEMENT. CONTRACTOR SHALL CAREFULLY CUT CONCRETE AWAY FROM SPARE CONDUIT, TO AN EXTENT THAT WILL
ALLOW FOR TWO FACTORY 90-DEGREE ELBOWS TO BE ADAPTED TO THE EXPOSED DUCTS. NOTE: NEW PAD-MOUNTED TRANSFORMER WILL
BE INSTALLED AT THIS LOCATION.
25. PRIOR TO CUTTING DUCTBANK, CONTRACTOR SHALL COLLECT A SAMPLE OF THE DUCTBANK CONCRETE AND HAVE THE SAMPLE ANALYZED
FOR ASBESTOS CONTAINING MATERIALS (ACM), USING ANALYTICAL METHODS EPA 600/R-93/116 AND 600/M4-82-020. IF ACM IS DETECTED IN
THE DUCTBANK CONCRETE, CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER FOR DIRECTION BEFORE PROCEEDING
FURTHER WITH THE WORK. ANY CONTRACTOR'S WORK REQUIRING DISTURBANCE OF ACM SHALL BE PERFORMED IN ACCORDANCE WITH 29
CFR 1926.1101, 29 CFR 1926.850, 40 CFR 763, 45SW OPLAN 19-14, FLORIDA STATUTE 469, F.A.C. CHAPTER 62-257 AND FDEP FORM 62-257.900(1).
FDEP FORM 62-257.900 (1)(NOTICE OF DEMOLITION OR ASBESTOS RENOVATION) MUST BE FORWARDED TO FDEP AT LEAST 10 DAYS PRIOR TO
ACM REMOVAL.
26. EXISTING PORTION OF UNDERGROUND SERVICE FEEDER TO FACILITY 404 TO BE REMOVED (CONDUCTORS TO BE REMOVED AFTER NEW
SERVICE IS IN PLACE, CONDUITS TO BE ABANDONED).
27. NON-FRIABLE ASBESTOS WAS DETECTED IN ROOFING MATERIALS IN BUILDING 972. CARE MUST BE TAKEN DURING BUILDING DEMOLITION
ACTIVITIES NOT TO GENERATE FRIABLE ASBESTOS. IF FRIABLE ASBESTOS IS IDENTIFIED OR GENERATED DURING BUILDING DEMOLITION
ACTIVITIES, IT MUST BE ABATED AND REMOVED BY A LICENSED ASBESTOS CONTRACTOR AS DEFINED BY FL-STAT 469.001 (7). ACM
ABATEMENT AND REMOVAL MUST BE COMPLETED AS PER F.A.C. 62-257, FL-STAT 469 AND IN ACCORDANCE WITH SPECIFICATION SECTION 02
82 13.00 98, ASBESTOS ABATEMENT. FDEP FORM 62-257.900(1)(NOTICE OF DEMOLITION OR ASBESTOS RENOVATION) MUST BE FORWARDED
TO FDEP AT LEAST 20 WORKING DAYS PRIOR TO ACM REMOVAL.
A m r c w k s p r o j e c t s R
A E I S C
C A
F S P
A F B
A
N N
E X
E S R
A E I S R e c
T r a n s f
V a r D r a w i n g s E D d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p c
1229014770C Rectangle
1229014770C Text Box
NOT USED
Text Box
E
S
E
S
E
S
E S
E
E
E
1'-6"
E
S
E
S
E
S
E
E
E
E
E
E
E
E
E
E
E
S
E
E
E
E
E
E
E
E
E
E
SW
E
E
SW
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
ENGINEER OF RECORD (E.O.R.)
MIKE PILO, FL PE #50067
ALPHA MRC, INC., #AA0003182/ #IB0001162
2395 N. COURTENAY PKWY, SUITE 102
MERRITT ISLAND, FL 32953
321-449-9455
ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS
SCALE:
ELECTRICAL SITE PLAN - DEMOLITION
1/32" = 1'-0"
LAUNDRY
ROOM (N.I.C.)
RM 1LAUNDRY1
SCALE:
EXTERIOR/INTERIOR PHOTOS - DEMOLITION:
NONE
PHOTO ED-111:
BLDG 546 - EXT. - SWITCHGEAR
SCALE:
ENLARGED PLAN - BLDG 546 - DEMOLITION
3/16" = 1'-0"
PHOTO ED-111:
BLDG 546 - EXT. - TRANSFORMER
T
R
U
E
N
O
R
T
H
NORTH
PLAN
MECHANICAL
ROOM (N.I.C.)
RM 1MECH2
WEIGHT
ROOM (N.I.C.)
RM 106
ELECTRICAL
ROOM
RM 1ELEC1
TRUE
NORTH
NORTH
PLAN
AREA OF WORK:
BLDG 546
SCALE:
SINGLE LINE DIAGRAM BLDG 546 - DEMOLITION
N.T.S.
S1T3 T4 T1 T2
CUSTODIAL
ROOM
RM 1JAN1
STORAGE
ROOM (N.I.C.)
RM 1STOR1
HALLWAY
(N.I.C.)
RM 1HALL1
PHOTO ED-111:
BLDG 546 - INT. - TRANSFORMER
PHOTO ED-111:
BLDG 546 - INT. - MAIN PANEL
PHOTO ED-111:
BLDG 546 - INT. - DISCONNECT
SW #48A (FDR D1)
TO SW #48
(FDR D1)
BUILDING 546
T546 3-100KVA 208Y/120V
POLE TYPE GYM VAULT
T533
CT YD
500KVA
208Y/120V
T546
500KVA
480Y/277V
POOL
T533 SO.
750KVA
208Y/120V
GENERAL NOTES:
REFER TO ELECTRICAL GENERAL NOTES ON DRAWING E-001.
INFORMATION ON EXISTING CONDITIONS IS BASED ON THE AVAILABLE EXISTING
DOCUMENTS AND OBSERVABLE IN-PLACE ELEMENTS. CONTRACTOR TO FIELD
MEASURE AND VERIFY REQUIREMENTS FOR EXACT DIMENSIONS.
EXISTING ELECTRICAL UNDERGROUND/ABOVEGROUND LINES TO REMAIN, NOT
RELATED TO THIS SCOPE ARE NOT SHOWN FOR CLARITY PURPOSES.
KEY MAP NOTE:
PAFB KEY MAP IS SHOWING SOUTH BASE AREA ONLY FOR CLARITY PURPOSES.
FOR PAFB COMPLETE KEY MAP, REFER TO DRAWING G-001.
SEQUENCE OF WORK NOTE:
REFER TO DRAWINGS E-002 AND E-003 FOR FACILITY SEQUENCE OF WORK NOTES.
PHOTO ED-111:
BLDG 546 - INT. - ELECTRICAL ITEMS
BLDG 546
1 17
SW-48A
CARDIOVASCULAR
ROOM (N.I.C.)
RM 103
FROM SW-48A; FOR
CONTINUATION,
REFER TO DEMO SITE
PLAN THIS DRAWING
ELECTRICAL
ROOM
BOUNDARY
CUSTODIAL ROOM
IN BLDG 546
EXISTING ELECTRICAL ITEMS TO REMAIN
16'12'8'0'2'4' 4'
GRAPHIC SCALE 3/16" = 1'-0"
FROM/TO EXISTING PAD MOUNTED
480/277 TRANSFORMER AS SHOWN
ON DEMO SITE PLAN THIS DRAWING
EXISTING PAD MOUNTED 480/277
TRANSFORMER SERVING BLDG 546
TO REMAIN - SHOWN FOR REFERENCE
EXISTING MAIN
PANEL TO REMAIN
0'
GRAPHIC SCALE: 1/32" = 1'-0"
20'10'30' 40' 60' 80'20' 100'
ED-111
F
L A
B O
Y M
A
L L E
N
M
P
I L O
B L
A
E M
O L
I T
I O
N
L
C
O L E
M A
N
S X
F
G
B
E A
R D
R E
P A
E
C T
R I C
A L
T R
A N
S F
O R
M E
R S
V
A R
I O
U S
S X
F
P A
F B
F
L
PORTION OF
EXPOSED
SECONDARY
SERVICE
FEEDER TO BE
DEMOLISHED
PORTION OF
SECONDARY
SERVICE
FEEDER TO
REMAIN
PORTION OF EXPOSED SECONDARY
SERVICE FEEDER TO BE DEMOLISHED
PORTION OF SECONDARY
SERVICE FEEDER TO REMAIN
SCALE:
KEY PLAN
NTS
TRUE
NORTH
NORTH
PLAN
PAFB NORTH
PAFB SOUTH
TYP.
A m r c w k s p r o j e c t s R
A E I S C
C A
F S P
A F B
A
N N
E X
E S R
A E I S R e c
T r a n s f
V a r D r a w i n g s E D d w g
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p
E
E
E
E
8"
ES
E S
E
S
E
E
E
E
E
E
E
E
E
E
E
E
D
E
L
I
V
E
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
ENGINEER OF RECORD (E.O.R.)
MIKE PILO, FL PE #50067
ALPHA MRC, INC., #AA0003182/ #IB0001162
2395 N. COURTENAY PKWY, SUITE 102
MERRITT ISLAND, FL 32953
321-449-9455
ARCHITE…
This is the start of the file's text. The full file is on GovTribe.