Attch 1 Drawings SXHT111031 RPR Elec Transf Var PAFB BID SET.pdf

PDF 11 MB Posted

Attached to
Repair Transformer Various (Project SXHT 11-1031), PSFB, FL Federal contract opportunity
Solicitation number
FA252121B0001
Issued by
Department of the Air Force Space Command

About this file

This federal contract opportunity is a solicitation from the Department of the Air Force Space Command to replace aging electrical infrastructure at various facilities at Patrick Space Force Base in Florida. The project consists of replacing open-wire pole-mount and live-front transformers with new pad mounted transformers, installing new high-voltage cables from switches to transformers and low-voltage cables from transformers to main panels. It also includes demolishing stand-alone electrical vaults and installing new facility main distribution panels in buildings 429, 546, 720, 806, 905, 972, 985, and 986. The solicitation number is FA252121B0001 and offers this repair and replacement work.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Transformer Various (Project SXHT 11-1031), PSFB, FL, newest first.
File Type Posted
SF 1409_ABSTRACT OF OFFERS_Post.pdf PDF
Solicitation Amendment FA252121B00010003 SF 30.pdf PDF
Attachment 16 Panelboard Surface 2021-02-10 08.36.52.pdf PDF
Attachment 12 Construction Wage Determination (FL 20210001. Modification 5) dated 09 Jul 2021 (Pages 8).pdf PDF
Attachment 13 Florida Department of Environmental Protection FDEP SRCO with NFA MOD.pdf PDF
Attachment 14 P041_FactSheet_Update2021.pdf PDF
Solicitation Amendment FA252121B00010004 SF 30.pdf PDF
Attachment 15 Demolition Floor plan 2021-02-10 08.35.00.pdf PDF
Attachment 17 Answers to site visits.pdf PDF
FA252121B00010002.pdf PDF
Attachment 7a-RulesofEngagement-Pre-BidSiteVisit.pdf PDF
Solicitation Amendment FA252121B00010001 SF 30.pdf PDF
MFR Dates Alteration.pdf PDF
Solicitation - FA252121B0001.pdf PDF
Attachment 9-Contractor Access Instructions.pdf PDF
Attachment 6-Q and A Template.docx DOCX document
Attachment 4-GPP Cert SXHT 11-1031.pdf PDF
Attch 11 Consolidated Answers 21B0001.pdf PDF
Attch 10 AMRS Meter Specification.pdf PDF
Attachment 7-RulesofEngagement-Pre-BidSiteVisit.pdf PDF
Attachment 3 - Construction Wage Determination (FL 20200001).pdf PDF
Attachement 5-HazWasteForm.doc DOC document
Attachment 9-Installation Access List WORD.docx DOCX document
Attachment 8-CECC Form 3052.xls XLS spreadsheet
Attachment 2-Specifications SXHT 11-1031 1.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIR FORCE BASE

MIAMI

TAMPA

ORLANDO

PATRICK

TALLAHASSEE

JACKSONVILLE

PINEDA EXPRESSWAY

SOUTH GATE (PERSONNEL ONLY)

B

A

N

A

N

A

R

I V

E

R

B A

N

A N

A

R

I V

E R

A

T

L A

N

T

C

O

E

A

N

TRUCK DELIVERY ONLY

BUILDING 423-CONTRACTING OFFICER

BUILDING 535-45TH CES

MAIN GATE (PERSONNEL ONLY)

S.R. A1A

B

A

N

A

V

E

R

A

T

L A

N

T

E

A

N

GOLF COURSE

A

C

C

E

S

S R

O

A

D

H

A

B

I T

T

U

N

R

E

D

S

T

O

N

E

R

O

A

D

C O

N T

R O

L

R

O A

D

U

N

K

N

O

W

N

R

EC

R

EATIO

N

R

O

AD

U

N

K

N

O

W

N

A

C

C

E

S

SR

O

A

D

R

I V

E

R

S

I D

E

A

I L

UNKNOWN

S

O

U

T

H

T

E

C

H

R

O

A

D

A

C

C

E

S

S

R

O

A

D

ACCESS

ROAD

U

N

K

N

O

W

N

ACCESS ROAD

A

C

C

E

S

A

D

A

C

C

E

S

S

R

O

A

D

W

E

S

T

T

E

C

H

R

O

A

D

U

N

K

N

O

W

N

PEQUOT TRAIL

A

C

C

E

A

D

F

O

R

E

C

A

L

N

E

A

R

A

P

A

H

O

T

R

A

I L

A

N

G

E

L

F

I S

H

C

O

V

E

B O

N I T

A

C O

V E

C

H

E

R

O

K

E

E

T

R

A

I L

C

H

I

C

K

A

S

A

W

T

R

A

I

L

C O

N T

R O

L

R

O A

D

F

A

L

C

V

E

N

U

E

SOUTH TECH ROAD

C

H

O

C

K

T

A

W

T

R

A

I

L

COUGAR R

UN

SAN

D

O

LLAR

C

O

VE

E

N

D

E

A

V

O

R

R

O

A

D

C

O

M

A

N

C

H

E

T

R

A

I

L

S

U

R

F

S

I D

E

C

O

V

E

ACCESS ROAD

J

U

P

IT

E

R

S

T

R

E

E

T

A

T

L

A

S

A

V

E

N

U

E

A

C

C

E

A

D

PORPOISE COVE

C

O

Y

O

T

E

R

U

N

T

U

S

K

E

G

R

M

I

V

E

U

N

K

N

O

W

N

RIVERSIDE

TRAIL

R

E

E

F

C

O

U

R

T

STARFISH

COVE

A

C

C

E

S

S

R

O

A

D

O

M

A

L

L

Y

I

V

E

M

A

R

L

I N

C

O

V

E

M

E

R

M

A

ID

C

O

V

E

ACCESS ROAD

U T

E

T R

A I L

A

C

C

E

A

D

P

O

R

P

O

IS

EC

O

V

E

T

I

T

A

D

C

R

E

E

T

R

A

IL

NORTH D

RIV

E

SANDOLLAR

COVE

S

E

A

M

IS

T

C

O

V

E

C

O

Q

U

I

V

E

P

A

R

R

N

S

E

Q

U

O

I

A

T

R

A

I

L

DUSKY

RUN

N C

O

C

L U

B

S

O U

H

P

R

K I N

G

U

T

E

T

R

A

IL

SEQ

U

O

IA

T

R

AIL

T

H

U

N

D

N

E

B R

E A

K E

R S

L A

N E

P

E

Q

U

A

I

L

J

A

G

U

A

R

A

V

E

N

U

E

SHOSHONI

TRAIL

P

A

N

T

H

N

COUGAR

RUN

JAGUAR AVENUE

A

C

C

E

S

S

R

O

A

D

DUSKY R

UN

CONTROL ROAD

I

R

O

Q

U

A

I

L

ACCESS ROAD

P

A

N

TH

E

R

R

U

N

S

T

O

R

M

Y

L

A

N

E

D

E

L

I

V

E

S

P

A

C

E

L

I

F

E

N

U

E

BEAR RUN

A

L

L

I

G

A

T

N

A C

C E

A

D

U N

K N

O W

N

SHOSHONI TRAIL

W

E

A

D

C A

N I N

E

D

R I V

E

S

C

R

B

J

Y

N

A

C

C

E

S

S

R

O

A

D

THUNDER LANE

T

H

O

R

S

T

R

E

E

T

M

IN

U

T

E

M

A

N

S

T

R

E

E

T

J

U

P

IT

E

R

S

T

R

E

E

T

C

H

A

L

L

E

N

G

E

R

S

T

R

E

E

T

E

D

W

A

R

D

W

H

IT

E

S

T

R

E

E

T

B

R

E

A

K

E

N

E

P

E

R

S

H

IN

G

P

L

A

C

E

H

O

P

I

T

R

A

I L

R

E

U

R

T

P

H

A

R

M

A

C

Y

D

R

IV

E

M

A

T

A

D

O

R

S

T

R

E

E

T

UNKNOWN

R

E

S

C

A

D

R

E

L

A

Y

S

T

A

T

IO

N

R

O

A

D

S O

U T

H

P

A T

R I C

K

D

R I V

E

M

A

I

N

T

E

N

A

N

A

D

CONTROL ROAD

CONTROL ROAD

S

A

T

U

R

N

R

O

A

D

S

C

H

O

O

L

A

V

E

N

U

E

L

E

S

U

N

S

E

T

B

O

U

L

E

V

A

R

D

C

O

N

T

R

A

D

ANVIL R

OAD

ACCESS ROAD

W E

C

H

R

O A

D

G

R

E

E

N

S

K

E

E

P

N

E

MACE ROAD

STATE ROAD 404 (ONRAMP)

R

E

S

C

A

D

STATE ROAD 404

S T

A T

E

R

O A

D

A

A

R

E

S

C

A

D

A

C

C

E

S

S

R

O

A

D

A

C

C

E

S

S

R

O

A

D

A C

C E

S S

R O

A D

10992

10990

1420 1421

SOQ5

SOQ6

T15

SOQ7

PAV2

T1619

T12

TBD

T7

T6

Unknown

10985

TBD

TBD

TBD

10989

10991

T968

SOQ2

PAV9

SOQ1

SOQ4

TBD

T14

TBD

TBD

PAV6

PAV4

PAV8

PAV5

PAV1

SOQ3

T13

T-Golon10

TBD

TBD

PB8

ANT1

SCALE:

STATE OF FLORIDA

NONE

R

E

D

S

T

O

A

D

A

T

L

E

N

U

E

D

E

L

I

V

E

C

H

A

L

L

E

N

G

E

R

S

T

R

E

E

T

P

E

R

S

H

I

G

A

C

E

S

A

T

U

A

D

SOUTH TECH ROAD

W

E

A

D

10990

10985

PAV4

U

N

K

N

O

W

N

SXHT 11-1031

REPAIR ELECTRICAL

TRANSFORMERS, VARIOUS

PERMIT(S)/ENVIRONMENTAL ACTIONS

REQUIRED PRIOR TO CONSTRUCTION

ERP/STORMWATER

ERP/WETLANDS/DREDGE & FILL

FDEP/DRINKING WATER

FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL

SURVEY/WILDLIFE

OTHER

NONE

FDEP/IND. WASTE WATER

IRP

FDEP/FUEL TANK

NOI/SWPPP

ASBESTOS

NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT

IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN

ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL

UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.

HEAVY METALS

YES NO

LEAD

PCB

NOT

VERIFIED

HAZARDOUS MATERIALS

G-001

F

L A

B O

Y M

A

L L E

N

M

P

I L O

V I C

I N

I T

Y

M

A P

L

O C

A T

I O

N

P

L A

N

A N

D

D

R A

W I N

G

I N

D E

X

L

C

O L E

M A

N

S X

F

G

B

E A

R D

R E

P A

E

C T

R I C

A L

T R

A N

S F

O R

M E

R S

V

A R

I O

U S

S X

F

P A

F B

F

L U

S A

F

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

SHEET

IDENTIFICATION

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D n g i n e e r i n g I n c

L L E

N

E A

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

An O ne id a N at io n Co m pa ny

CE OPERATIONS:

COMMUNICATIONS:

PROJECT MANAGER:

CHIEF, ENGINEERING FLIGHT:

USER:

SAFETY:

SECURITY FORCES:

ATO:

OTHER:

ENVIRONMENTAL:

FIRE:

A

P

P

R

O

V

E

D

PATRICK AIR FORCE BASE

FLORIDA

SCALE:

LOCATION MAP

NONE

TRUE

NORTH

NORTH

PLAN

BLDG 429

BLDG 546

BLDG 720

BLDG 806

BLDG 905

BLDG 986

BLDG 985

BLDG 945

BLDG 972

DRAWING INDEX

SHEET NO. DESCRIPTION

G-001

VICINITY MAP, LOCATION PLAN AND DRAWING INDEX

ELECTRICAL

E-001

GENERAL NOTES, LEGEND AND ABBREVIATIONS

E-002 SEQUENCE OF WORK NOTES - 1

E-003 SEQUENCE OF WORK NOTES - 2

ED-100 FLAG NOTES - DEMOLITION

ED-101 BLDG 429 SITE PLAN - DEMOLITION

ED-102 BLDG 429 ENLARGED PLANS - DEMOLITION

ED-111 BLDG 546 PLANS - DEMOLITION

ED-121 BLDG 720 PLANS - DEMOLITION

ED-131 BLDG 806 PLANS - DEMOLITION

ED-141 BLDG 905 PLANS - DEMOLITION

ED-142 BLDG 905 SINGLE LINE DIAGRAM - DEMOLITION

ED-151 BLDG 945 PLANS - DEMOLITION

ED-161 BLDG 972 PLANS - DEMOLITION

ED-171 BLDG 985 PLANS - DEMOLITION

ED-181 BLDG 986 PLANS - DEMOLITION

E-100 FLAG NOTES - NEW CONSTRUCTION

E-101 BLDG 429 SITE PLAN - NEW CONSTRUCTION

E-102 BLDG 429 ENLARGED PLANS - NEW CONSTRUCTION

E-111 BLDG 546 PLANS - NEW CONSTRUCTION

E-121 BLDG 720 PLANS - NEW CONSTRUCTION

E-122 BLDG 720 SINGLE LINE DIAGRAM - NEW CONSTRUCTION

E-131 BLDG 806 PLANS - NEW CONSTRUCTION

E-141 BLDG 905 PLANS - NEW CONSTRUCTION

E-142 BLDG 905 SINGLE LINE DIAGRAM - NEW CONSTRUCTION

E-151 BLDG 945 PLANS - NEW CONSTRUCTION

E-152 BLDG 945 SINGLE LINE DIAGRAM - NEW CONSTRUCTION

E-161 BLDG 972 PLANS - NEW CONSTRUCTION

E-171 BLDG 985 PLANS - NEW CONSTRUCTION

E-181 BLDG 986 PLANS - NEW CONSTRUCTION

E-501 DETAILS - 1

E-502 DETAILS - 2

E-503 DETAILS - 3

E-601 TRANSFORMERS SCHEDULE

ENGINEER OF RECORD (E.O.R.)

MIKE PILO, FL PE #50067

ALPHA MRC, INC., #AA0003182/ #IB0001162

2395 N. COURTENAY PKWY, SUITE 102

MERRITT ISLAND, FL 32953

321-449-9455

ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS

A m r c w k s p r o j e c t s R

A E I S C

C A

F S P

A F B

A

N N

E X

E S R

A E I S R l e c

T r a n s f

V a r D r a w i n g s G d w g

P

M

A u t o

C A

D

P

D F

G e n e r a l

D o c u m e n t a t i o n p c

1229014770C Rectangle

1229014770C Rectangle

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

SHEET

IDENTIFICATION

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

An O ne id a N at io n Co m pa ny

A - AMPERES, AMPS

AFC - AVAILABLE FAULT CURRENT

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

AHU - AIR HANDLING UNIT

AIC - AMPS INTERRUPTING CAPACITY

ATS AUTOMATIC TRANSFER SWITCH

BKR - BREAKER

C - CONDUIT

CB - CIRCUIT BREAKER

CKT - CIRCUIT

CLG - CEILING

CU - COPPER

CONC - CONCRETE

DC - DROP CORD

DIA (Ø) - DIAMETER

DIM - DIMENSION

DISC - DISCONNECT SWITCH

DWG - DRAWING

ELECT - ELECTRIC

EMT - ELECTRICAL METALLIC TUBING

ETR - EXISTING TO REMAIN

EXT - EXTERIOR

EXIST - EXISTING

EA - EACH

FAC. - FACILITY

FLA - FULL LOAD AMPS

FT - FEET

GEN - GENERATOR/GENSET

GFCI - GROUND FAULT CIRCUIT INTERRUPTER

GND - GROUND

HP - HORSEPOWER

INT - INTERIOR

I - CURRENT

ID - INSIDE DIAMETER

IN - INCH, INCHES

KCMIL - THOUSAND CIRCULAR MILS

KW - KILOWATT

LTG - LIGHTING

LV - LOW VOLTAGE

LF - LINEAL FEET

LPS - LOW PRESSURE SODIUM

MECH - MECHANICAL

MCP - MOTOR CIRCUIT PROTECTION

MTD - MOUNTED

MCM - THOUSAND CIRCULAR MILS

MCB - MAIN CIRCUIT BREAKER

MLO - MAIN LUGS ONLY

N/A - NOT APPLICABLE

NC - NORMALLY CLOSED

NIC - NOT IN CONTRACT

NO - NORMALLY OPEN

NTS - NOT TO SCALE

Ø - PHASE

PNL - PANEL, PANELBOARD

PVC - POLYVINYL CHLORIDE

PWR - POWER

RECP - RECEPTACLE

RGS - RIGID GALVANIZED STEEL

RM - ROOM

SPD - SURGE PROTECTION DEVICE

ST - SHUNT TRIP

STRP - STRIP

SW - SWITCH

SYS - SYSTEM

TYP - TYPICAL

UG - UNDERGROUND

UON - UNLESS OTHERWISE NOTED

V - VOLTS

W - WATTAGE

WP - WEATHERPROOF

XFER - TRANSFER

XFMR - TRANSFORMER

(APPLIES TO ALL ELECTRICAL SHEETS)

ELECTRICAL GENERAL NOTES:

1. IT IS THE INTENT OF THESE CONTRACT DRAWINGS TO PROVIDE A COMPLETE

AND WORKABLE FACILITY.

2. DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS,

BENDS, ELBOWS, OR OTHER SPECIFIC ELEMENTS THAT MAY BE REQUIRED FOR

PROPER INSTALLATION OF THE WORK. SUCH WORK SHALL BE VERIFIED AT THE

SITE. ADDITIONAL BENDS, OFFSETS, AND CONDUIT AS REQUIRED BY VERTICAL

AND HORIZONTAL EQUIPMENT LOCATIONS OR OTHER JOB CONDITIONS, SHALL

BE PROVIDED TO COMPLETE THE WORK AT NO ADDITIONAL COST TO THE

GOVERNMENT.

3. EXCEPT WHERE SHOWN IN DIMENSIONAL DETAIL, THE LOCATIONS OF

EQUIPMENT SHOWN ON PLANS ARE APPROXIMATE. SUCH ITEMS SHALL BE

PLACED TO ELIMINATE INTERFERENCE WITH OTHER EQUIPMENT. THE EXACT

LOCATIONS SHALL BE DETERMINED IN THE FIELD.

4. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2017 EDITION OF THE NATIONAL

ELECTRICAL CODE (NFPA 70).

5. MATERIALS SHALL BE LISTED BY THE UNDERWRITER'S LABORATORIES, INC. OR

ANOTHER APPROVED/CERTIFIED TESTING LABORATORY. SHOULD PLANS AND

CODES CONFLICT, CONTACT THE CONTRACTING OFFICER. MAKE NO CHANGES,

EVEN IN CASE OF CONFLICT, WITHOUT FIRST OBTAINING THE APPROVAL OF THE

CONTRACTING OFFICER.

6. A GREEN, COPPER GROUND WIRE SHALL BE INSTALLED IN ALL CONDUIT

SYSTEMS AND SHALL BE BONDED TO ALL ENCLOSURES, BOXES, AND

EQUIPMENT. RECEPTACLES WITH GREEN WIRE SHALL BE BONDED TO BOX

THEN TO RECEPTACLE SUCH THAT REMOVAL OF RECEPTACLE DEVICE SHALL

NOT INTERRUPT GREEN WIRE BOND TO METALLIC BOX OR ENCLOSURE.

7. BONDING JUMPERS SHALL BE USED TO BOND CONDUIT TO ENCLOSURES,

BOXES, AND EQUIPMENT WHERE CONCENTRIC OR ECCENTRIC KNOCKOUTS ARE

USED.

8. EQUIPMENT SIZES INDICATED ARE MINIMUM, BEFORE INSTALLING ANY WIRE OR

CONDUIT, THE CONTRACTOR SHALL OBTAIN THE EXACT EQUIPMENT

REQUIREMENTS AND SHALL INSTALL WIRE, CONDUIT, CIRCUIT BREAKERS AND

OTHER ITEMS OF THE CORRECT SIZE FOR THE EQUIPMENT ACTUALLY

INSTALLED. HOWEVER, WIRE AND CONDUIT SIZES FOR THE EQUIPMENT SHALL

BE TAKEN AS A MINIMUM AND SHALL NOT BE REDUCED WITHOUT WRITTEN

APPROVAL.

9. THE INSTALLATION OF THE ELECTRICAL WORK SHALL BE COORDINATED WITH

THE WORK OF THE OTHER TRADES.

10. THE INSTALLATION SHALL BE ACCOMPLISHED BY WORKERS SKILLED IN THIS

TYPE OF WORK. THE INSTALLATION SHALL BE MADE SO THAT THERE IS NO

DEGRADATION OF THE DESIGNED FIRE RATINGS.

11. THE CONTRACTOR SHALL INSTALL HIS WORK IN SUCH A MANNER AND AT SUCH

A TIME AS WILL REQUIRE A MINIMUM OF CUTTING AND PATCHING OF THE

BUILDING STRUCTURE.

12. 'PROVIDE', AS USED HERE ON THE DRAWINGS, IS AN ALL-INCLUSIVE TERM

REQUIRING CONTRACTOR TO FURNISH, INSTALL, WIRE, AND CONNECT ALL

SPECIFIED EQUIPMENT AS WELL AS COMPONENTS, ACCESSORIES, WIRING, AND

MOUNTING HARDWARE TO INSURE THAT SPECIFIED EQUIPMENT FUNCTIONS TO

MEET SYSTEM(S) REQUIREMENTS.

13. WHERE NEW-TO-EXISTING CONNECTIONS ARE INDICATED, THE CONTRACTOR

SHALL PROVIDE ALL MATERIALS (JUNCTION BOXES, CONDUIT, WIRE, AND

CONNECTIONS) AND LABOR REQUIRED TO MAKE THE CONNECTIONS.

14. UNLESS OTHERWISE NOTED, ALL POWER CIRCUIT CONDUCTORS SHALL BE

COPPER AND MINIMUM #12AWG. CONDUITS SHALL BE 3/4" MINIMUM.

15. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT EXISTING

UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE FOR

REPAIR OR REPLACEMENT OF THE UTILITIES OR OTHER PROPERTY DAMAGED

BY OPERATIONS IN CONJUNCTION WITH THE COMPLETION OF THIS WORK.

16. ALL BOLTS, NUTS, WASHERS, ETC. USED FOR GROUNDING AND BONDING

CONNECTIONS SHALL BE COPPER. CONTRACTOR SHALL UTILIZE CONNECTORS

TO PREVENT GALVANIC ACTION.

17. FINAL ACCEPTANCE WILL DEPEND UPON SATISFACTORY PERFORMANCE OF

EQUIPMENT. NO CONDUCTOR SHALL BE ENERGIZED UNTIL THE INSTALLATION

HAS BEEN APPROVED.

18. ALL EXPOSED ELECTRICAL CONDUIT VULNERABLE TO MECHANICAL DAMAGE

SHALL BE RIGID GALVANIZED STEEL, UNLESS NOTED OTHERWISE. ALL OTHER

CONDUIT INSIDE FACILITY SHALL BE ELECTRICAL METALLIC TUBING (EMT).

19. CONDUITS SHALL BE SUPPORTED BY SUITABLE CLAMPS, HANGERS OR STRAPS

TO PROVIDE A RIGID INSTALLATION. CONDUIT SUPPORTS SHALL NOT BE

FASTENED OR ATTACHED TO OTHER PIPES. PERFORATED STRAP HANGERS

WILL NOT BE ALLOWED. EMPTY CONDUIT SHALL BE THOROUGHLY SWABBED

OUT WITH DRY SWAB TO REMOVE MOISTURE AND DEBRIS BEFORE WIRE IS

DRAWN IN. END OF CONDUIT SHALL BE TIGHTLY PLUGGED UNTIL WIRE IS

PULLED. NO CONDUIT SHALL BE LOCATED TO IMPAIR THE STRENGTH OF

STRUCTURAL MEMBERS. MAKE CHANGES IN DIRECTION OF RUNS WITH

SYMMETRICAL BENDS. MAKE FIELD MADE BENDS AND OFFSETS WITH HICKEY

OR CONDUIT BENDING MACHINE. DO NOT INSTALL CRUSHED OR DEFORMED

CONDUITS. AVOID TRAPPED CONDUITS. PREVENT PLASTER, DIRT, OR TRASH

FROM LODGING IN CONDUIT, BOXES, FITTINGS. FREE CLOGGED CONDUITS OF

OBSTRUCTIONS.

20. IN ACCORDANCE WITH NFPA 70, GROUND EXPOSED, NON-CURRENT CARRYING

METALLIC PARTS OF ELECTRICAL EQUIPMENT, METALLIC RACEWAY SYSTEMS,

GROUNDING CONDUCTOR IN METALLIC RACEWAYS.

21. FASTEN CONDUITS TO SHEET METAL BOXES AND CABINETS WITH TWO

LOCKNUTS WHERE REQUIRED BY NFPA 70, WHERE INSULATED BUSHINGS ARE

USED, AND WHERE BUSHINGS CANNOT BE BROUGHT INTO FIRM CONTACT WITH

THE BOX; OTHERWISE, USE MINIMUM SINGLE LOCKNUT AND BUSHING.

LOCKNUTS SHALL HAVE SHARP EDGES FOR DIGGING INTO WALLS OF METAL

ENCLOSURE. INSTALL BUSHINGS ON ENDS OF CONDUITS, AND PROVIDE

INSULATING TYPE WHERE REQUIRED BY NFPA 70.

22. PROVIDE AND INSTALL AT WALL OR FLOOR PENETRATIONS A PERMANENT FIRE

STOP SYSTEM. THE SYSTEM SHALL CONSIST OF A WATER BASED FIRE STOP

COMPOUND AS THE FILL, VOID, OR CAVITY MATERIAL ALONG WITH

APPROPRIATE DAMMING MATERIAL (AS PER MANUFACTURER'S INSTRUCTIONS).

THE FIRE STOP COMPOUND SHALL NOT CONTAIN ANY SOLVENTS, INORGANIC

FIBERS, OR SILICONE COMPOUNDS AND SHALL NOT REQUIRE HEAT TO

ACTIVATE THE SEAL. THE FIRE STOP COMPOUND SHALL BE ONE-PART

MATERIALS, REQUIRING NO CRITICAL MIXING. THE PENETRATION SEAL

MATERIAL MUST BE UNAFFECTED BY MOISTURE AND MUST MAINTAIN THE

INTEGRITY OF THE FLOOR OR WALL ASSEMBLY FOR ITS RATED TIME PERIOD

WHEN TESTED IN ACCORDANCE WITH ASTM E84. THE SYSTEM SHALL BE UL

CLASSIFIED AND INSTALLED TO PROVIDE A 2 HOUR FIRE RATING. THE

PENETRATION FIRE STOP MATERIAL SHALL BE FLAME-SAFE FS1900 SERIES

COMPOUND AS MANUFACTURED BY GRACE CONSTRUCTION PRODUCTS OR

EQUAL.

23. DEVICE PLATES FOR SWITCHES AND RECEPTACLES SHALL BE SUITABLY

MARKED, SHOWING THE PANEL AND CIRCUIT NUMBER OF THE SOURCE.

REQUIRED MARKING SHALL CONSIST OF A SELF-ADHESIVE LABEL HAVING 1/4

INCH EMBOSSED LETTERS.

24. DAMAGE DONE TO ZINC COATING OF GALVANIZED CONDUIT, BOXES, AND

FITTINGS, INCLUDING EXPOSED CONDUIT THREADS AND ZINC FINISHES

SCRATCHING, SHALL BE REPAIRED BY CLEANING, PREPPING, AND COATING

DAMAGED SURFACE WITH INORGANIC ZINC COMPOUND.

25. PROVIDE ELECTRICAL CONDUIT AS FOLLOWS:

- RIGID GALVANIZED STEEL - ABOVE GRADE OUTSIDE AND INSIDE WHEN

SUBJECT TO PHYSICAL DAMAGE

- EMT - ABOVE GRADE INSIDE WHERE NOT SUBJECT TO PHYSICAL DAMAGE

- PVC SCHEDULE 40 - BELOW GRADE

- PVC SCHEDULE 80 - BELOW GRADE WHERE SUBJECT TO PHYSICAL DAMAGE

26. CONTRACTOR SHALL PROTECT THE GREEN AREAS WHERE DEMOLITION AND/OR

NEW CONSTRUCTION WORK WILL BE PERFORMED. ALL GRASSED AREAS

DISTURBED ARE TO BE SODDED AND WATERED UNTIL ACCEPTANCE. SOD

DISTURBED AREAS TO MATCH EXISTING.

ENGINEER OF RECORD (E.O.R.)

MIKE PILO, FL PE #50067

ALPHA MRC, INC., #AA0003182/ #IB0001162

2395 N. COURTENAY PKWY, SUITE 102

MERRITT ISLAND, FL 32953

321-449-9455

ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS

SEQUENCING OF WORK:

REFER TO E-002 AND E-003 FOR SEQUENCE OF WORK NOTES

APPLICABLE TO EACH INDIVIDUAL SITE.

DISSIMILAR METALS:

CONTRACTOR SHALL PROVIDE ADEQUATE SEPARATION OF

DISSIMILAR METALS BY APPROPRIATE MEANS, SUCH AS 15#

SEPARATION FELT FOR ROOFS AND ASPHALTIC TAPE,

NEOPRENE TAPE, PEEL AND STICK TAPE, OR ASPHALTIC PAINT

AT OTHER LOCATIONS AS REQUIRED.

ALL CONNECTORS, FASTENERS, BOLTS, ETC., SHALL BE

SELECTED IN ORDER TO PREVENT OR MINIMIZE ANY GALVANIC

REACTION BETWEEN DISSIMILAR METALS. AND UNLESS

OTHERWISE NOTED PROVIDE 304 STAINLESS STEEL.

APPLICABLE CODES

WORK SHALL BE IN COMPLIANCE WITH THE FOLLOWING CODES AND

THEIR LATEST REVISION AND WITH PROJECT SPECIFICATIONS:

BUILDING CONSTRUCTION AND SAFETY NFPA 5000

NATIONAL ELECTRIC CODE/INTERNATIONAL

ELECTRICAL CODE SERIES, NEC - NFPA 70

GENERAL BUILDING REQUIREMENTS UFC 1-200-012016

INTERIOR ELECTRICAL SYSTEMS UFC 3-520-01

NEW - TO BE INSTALLED

GROUNDING CONDUCTOR, BELOW GRADEG

NEW UNDERGROUND

PRIMARY SERVICE FEEDER

EXISTING UNDERGROUND

PRIMARY FEEDER TO REMAIN

E

TO BE REMOVED

NEW UNDERGROUND

SECONDARY SERVICE FEEDER

EXISTING UNDERGROUND SECONDARY

SERVICE FEEDER TO REMAIN

ES

(ALL MAY NOT BE USED)

ELECTRICAL SYMBOLS LEGEND:

PANELBOARD - EXISTING TO REMAIN - SEE PANEL

SCHEDULES FOR SPECIFIC INFORMATION (PLAN VIEW)

DISCONNECT SWITCH NON-FUSED, NUMBER INDICATES

SWITCH SIZE, 3-POLE UNLESS OTHERWISE NOTE;

EXTERIOR DISCONNECTS SHALL BE NEMA 4X ST. STL.

SPD

EQUIPMENT ENCLOSURE ON SINGLE

LINE DIAGRAM AND/OR EXISTING

UNDERGROUND TRENCHES/UTILITIES

SURGE PROTECTION DEVICE

JUNCTION BLOCK

TRANSFORMER (PLAN VIEW)

TRANSFORMER, SIZE AND RATING AS

INDICATED (DIAGRAM VIEW)

CIRCUIT BREAKER, 3-POLE, NUMBER

INDICATE STRIP RATING WHERE APPLICABLE

GROUNDING ELECTRODE, GROUND

FUSED SWITCH

CONDUIT - CHANGE OF

ELEVATION (PLAN VIEW ONLY)

G

GENERATOR

FUSED SWITCH

PANELBOARD - EXISTING TO BE DEMOLISHED - SEE PANEL

SCHEDULES FOR SPECIFIC INFORMATION (PLAN VIEW)

PANELBOARD EXISTING TO BE MODIFIED AND/OR NEW - SEE

PANEL SCHEDULES FOR SPECIFIC INFORMATION (PLAN VIEW)

M

EQUIPMENT CENTER LINE℄

MEDIUM VOLTAGE CABLE TERMINATION

EXISTING - TO REMAIN

NON-FUSED SWITCH

NEW PENETRATION ON EXISTING WALL

EXISTING WALL - TO REMAIN

MOTOR

EXISTING WALL TO BE DEMOLISHED

EXISTING UNDERGROUND

PRIMARY FEEDER TO BE REMOVED

E

EXISTING UNDERGROUND SECONDARY

SERVICE FEEDER TO BE REMOVED

E

ES

ES

ABBREVIATIONS:

UNDERGROUND TRENCHES/NEW

DIRECTLY BURIED FEEDERS

SIDEWALK AND/OR PAVEMENT AREA TO BE

REMOVED, INSTALL AND/OR REPAIR AND

NEW TRANSFORMER CONCRETE PADS

E-001

F

L A

B O

Y M

A

L L E

N

M

P

I L O

G E

N E

R A

L

N

O T

E S

L

E G

E N

D

A N

D

A

B B

R E

V I A

T I O

N S

L

C

O L E

M A

N

S X

F

G

B

E A

R D

R E

P A

E

C T

R I C

A L

T R

A N

S F

O R

M E

R S

V

A R

I O

U S

S X

F

P A

F B

F

L

AREA OF WORK

SOLID WASTE MANAGEMENT UNIT (SWMU)

A m r c w k s p r o j e c t s R

A E I S C

C A

F S P

A F B

A

N N

E X

E S R

A E I S R e c

T r a n s f

V a r D r a w i n g s E d w g

P

M

A u t o

C A

D

P

D F

G e n e r a l

D o c u m e n t a t i o n p c

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

SHEET

IDENTIFICATION

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

An O ne id a N at io n Co m pa ny

ENGINEER OF RECORD (E.O.R.)

MIKE PILO, FL PE #50067

ALPHA MRC, INC., #AA0003182/ #IB0001162

2395 N. COURTENAY PKWY, SUITE 102

MERRITT ISLAND, FL 32953

321-449-9455

ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS

E-002

F

L A

B O

Y M

A

L L E

N

M

P

I L O

S E

Q U

E N

W

O R

K

N

O T

L

C

O L E

M A

N

S X

F

G

B

E A

R D

R E

P A

E

C T

R I C

A L

T R

A N

S F

O R

M E

R S

V

A R

I O

U S

S X

F

P A

F B

F

L

FACILITY 429 - SEQUENCE OF WORK NOTES:

EXISTING CONDITIONS:

TRANSFORMERS: 3 EA. SINGLE-PHASE 75 KVA TRANSFORMERS INSIDE STANDALONE VAULT (FACILITY 429)

PRIMARY: FED UNDERGROUND FROM SW #68

SECONDARY: TWO 120/208V SERVICE FEEDS AS DESCRIBED BELOW

· 700 AMP SERVICE TO FACILITY 404 (TO BE UPGRADED TO 900 AMPS ON ANOTHER PROJECT), LANDING

ON AN ENCLOSED CIRCUIT BREAKER MAIN IN MECHANICAL/ELECTRICAL ROOM. BUILDING IS

SCHEDULED FOR A RENOVATION WHICH INCLUDES A NEW MAIN PANEL AND A NEW SERVICE FEEDER.

CE IS PROPOSING A NEW HANDHOLE TO BE LOCATED NEAR THE VAULT, FOR THE PURPOSE OF

BECOMING AN INTERCEPT-POINT FOR THE SERVICE FEEDER FROM THE NEW TRANSFORMER.

· 175 AMP SERVICE TO FACILITY 401, LANDING ON A MAIN PANELBOARD IN MECHANICAL/ELECTRICAL

ROOM.

PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):

1. INSTALL NEW PAD-MOUNTED TRANSFORMER NEAR THE EXISTING VAULT AND NEAR PRIMARY

DUCTBANK AND NEAR UNDERGROUND SERVICE FOR BUILDING 404.

2. UNEARTH PRIMARY DUCTBANK NEAR TRANSFORMER AND CUT CONCRETE ENCASEMENT TO EXPOSE

ONE SPARE CONDUIT. EXTEND CONDUIT INTO NEW TRANSFORMER'S PRIMARY COMPARTMENT. RUN

NEW 13.2 KV CABLE FROM SW #68 TO NEW TRANSFORMER AND PREPARE CABLE-END TERMINATIONS

FOR CONNECTION.

3. INSTALL NEW SERVICE HANDHOLE BETWEEN NEW TRANSFORMER AND EXISTING UNDERGROUND

SERVICE FOR BUILDING 404, RUN NEW SERVICE FEEDER FROM TRANSFORMER TO HANDHOLE.

UNEARTH EXISTING SERVICE FEEDER TO FACILITY 404 NEAR NEW HANDHOLE IN PREPARATION FOR

INTERCEPTING EXISTING FEEDER AND RE-ROUTING INTO HANDHOLE.

4. RUN NEW UNDERGROUND SERVICE FEEDER FROM NEW TRANSFORMER TO MECHANICAL/ELECTRICAL

ROOM IN FACILITY 401.

5. SCHEDULE SHORT OUTAGE FOR BOTH FACILITY 404 AND FACILITY 401. DURING THE OUTAGE, PERFORM

THE FOLLOWING WORK: INTERCEPT EXISTING FACILITY 404 SERVICE FEEDER, RE-ROUTE INTO NEW

HANDHOLE, AND SPLICE EXISTING SERVICE CONDUCTORS WITH NEW. CONNECT NEW FACILITY 401

SERVICE FEEDER AT TRANSFORMER AND AT SERVICE MAIN. DISCONNECT EXISTING VAULT

TRANSFORMERS FROM SW #68, AND CONNECT NEW TRANSFORMER PRIMARY.

6. AFTER OUTAGE, REMOVE VAULT TRANSFORMERS, WIRING, EQUIPMENT, AND ACCESSORIES. REMOVE

VAULT BUILDING.

7. REPLACE EXISTING MAIN PANEL IN FACILITY 401, PRESERVE AND RECONNECT EXISTING BRANCH

FEEDERS TO NEW PANEL. NOTE: CONTRACTOR TO WORK AROUND NEC CODE VIOLATIONS IN MECH

ROOM AND IS NOT RESPONSIBLE FOR CORRECTIVE ACTION DOWNSTREAM OF MAIN PANEL.

TEMPORARY GENERATOR REQUIREMENTS:

· FACILITY 404: DUE TO THE OCCUPANCY NATURE OF FACILITY 404, A GENERATOR CANNOT RUN

DURING THE NIGHT, PROPOSED STEP #5 MUST TAKE PLACE DURING NORMAL BUSINESS HOURS AND

TEMPORARY GENERATOR WILL BE REQUIRED TO PROVIDE POWER DURING THAT TIME PERIOD (FOR

TEMPORARY GENERATOR INFORMATION, REFER TO SCHEDULE ON DRAWING E-601).

· FACILITY 401: A TEMPORARY GENERATOR WILL BE REQUIRED TO PROVIDE POWER DURING

PROPOSED STEP #5 (FOR TEMPORARY GENERATOR INFORMATION, REFER TO SCHEDULE ON

DRAWING E-601).

FACILITY 546 - SEQUENCE OF WORK NOTES:

EXISTING CONDITIONS:

TRANSFORMERS: 3 EA. SINGLE-PHASE 100 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 546

PRIMARY: FED UNDERGROUND FROM SW #48A.

NOTE: SW #48A ALSO FEEDS AN EXISTING PAD-MOUNTED 480/277V TRANSFORMER

SERVING FACILITY 546, TO REMAIN.

SECONDARY: ONE 120/208V SERVICE FEED AS DESCRIBED BELOW.

· 1000 AMP SERVICE TO MAIN FUSE-BASED PANEL LOCATED IN JANITOR ROOM. THE EXISTING GEAR IS

OBSOLETE AND UNSERVICEABLE, THERE ARE SEVERAL NEC CODE VIOLATIONS RELATED TO PANEL, SUB-PANEL, AND DISCONNECT CLEARANCES, AND GROUNDING OF BRANCH FEEDERS. BRANCH

FEEDERS CONNECTED TO THE DISTRIBUTION EQUIPMENT ARE AGED AND WITH BRITTLE INSULATION.

THE WORKING SPACE IS CONGESTED AND SHARED WITH SINKS, WATER PIPING, AND EQUIPMENT

UNRELATED TO THE ELECTRICAL DISTRIBUTION. THE SPACE IS NOT SUITABLE AS AN ELECTRICAL

ROOM AND THERE IS NO PRACTICAL WAY TO REPLACE THE MAIN PANEL WITHOUT RISKING DAMAGE

TO THE EXISTING BRANCH CIRCUIT CONDUCTORS, OR TO RESOLVE THE CLEARANCE ISSUES. IT IS

RECOMMENDED THE DISTRIBUTION SYSTEM IS LEFT UNDISTURBED UNTIL A COMPLETE RENOVATION

CAN BE UNDERTAKEN.

PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):

1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA N OF FACILITY 546, AND

ADJACENT TO EXISTING 480/277V PAD-MOUNTED TRANSFORMER.

2. RUN PRIMARY DUCTBANK FROM SW #48A TO TRANSFORMER, AND INSTALL NEW PRIMARY CABLES.

TERMINATE WITH ELBOWS AND LEAVE READY TO CONNECT AT SWITCH.

3. RUN NEW FACILITY 546 UNDERGROUND FEEDER FROM NEW TRANSFORMER TO VAULT, THEN RUN

FEEDER IN EXPOSED CONDUIT INSIDE VAULT.

4. DISCONNECT EXISTING TRANSFORMERS' SECONDARY FEEDER CABLES. INTERCEPT EXISTING

SECONDARY SERVICE CABLES/CONDUIT INSIDE VAULT WITH A NEW PULL BOX, TERMINATE NEW

SERVICE FEEDER IN PULL BOX, AND SPLICE NEW SERVICE CABLES WITH EXISTING.

5. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL ACCESSORIES AND PRIMARY CABLES.

6. ENERGIZE NEW TRANSFORMER AND MAIN DISTRIBUTION SYSTEM.

TEMPORARY GENERATOR REQUIREMENTS:

· CONSTRUCTING THE NEW SYSTEM AROUND THE EXISTING, AND SWITCHING OVER AT THE END, WILL

MINIMIZE OR ELIMINATE THE REQUIREMENT FOR A TEMPORARY GENERATOR. THE OUTAGE WOULD

BE REQUIRED REGARDLESS DURING MAIN SERVICE SWITCHOVER.

FACILITY 720 - SEQUENCE OF WORK NOTES:

EXISTING CONDITIONS:

TRANSFORMERS: 3 EA. SINGLE-PHASE 100 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 720

PRIMARY: FED UNDERGROUND FROM JUNCTION BLOCK NEXT TO SW #47

SECONDARY: ONE 120/208V SERVICE FEED AS DESCRIBED BELOW.

· 1000 AMP SERVICE TO FACILITY 720, LANDING ON A MAIN PANEL IN ELECTRICAL ROOM ADJACENT TO

VAULT. PANEL IS IN DISMAL CONDITION AND SO ARE BRANCH CIRCUIT CONDUITS AND AUXILIARY

GUTTERS. IT IS NOT RECOMMENDED THE EXISTING BRANCH CIRCUIT CONDUITS ARE REMOVED FROM

THE PANEL ENCLOSURE, AS THIS WOULD PRESENT A HIGH RISK FOR DAMAGING EXISTING CABLES

AND REQUIRING DOWNSTREAM WORK IN EXCESS OF THE ORIGINAL SCOPE.

PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):

1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA NORTHWEST OF FACILITY 720.

2. INSTALL NEW MAIN PANEL IN ELECTRICAL ROOM, AS CLOSE AS POSSIBLE TO EXISTING PANEL. NEW

PANEL TO CONTAIN ALL REQUIRED BRANCH CIRCUIT BREAKERS TO FEED ALL EXISTING MAIN PANEL

DOWNSTREAM CIRCUITS.

3. INSTALL NEW UNDERGROUND SERVICE FEEDER FROM NEW TRANSFORMER TO NEW MAIN PANEL IN

ELECTRICAL ROOM.

4. INSTALL NEW 13.2KV DUCTBANK AND PRIMARY FEEDER FROM SW #47 JUNCTION BLOCK TO NEW

TRANSFORMER. LEAVE PRIMARY ELBOWS READY FOR CONNECTION.

5. SCHEDULE OUTAGE FOR FACILITY 720. DE-ENERGIZE EXISTING TRANSFORMERS AND DISCONNECT

PRIMARY FEEDERS.

6. REMOVE ALL INTERNAL COMPONENTS OF EXISTING MAIN PANEL, LEAVE BRANCH FEEDER

CONDUCTORS IN PLACE. REMOVE SERVICE FEEDER FROM EXISTING MAIN PANEL.

7. USE EXISTING MAIN PANEL ENCLOSURE AS A JUNCTION BOX TO SPLICE AND EXTEND EXISTING

BRANCH FEEDERS TO NEW MAIN PANEL, AND RECONNECT.

8. PROVIDE A GALVANIZED STEEL COVER FOR THE EXISTING MAIN PANEL ENCLOSURE, COVER SHALL BE

CUSTOM FABRICATED TO BE THE EXACT SIZE OF ENCLOSURE, AND SCREW HOLES SHALL MATCH IN

QUANTITY AND LOCATION.

9. ENERGIZE NEW TRANSFORMER AND MAIN PANEL.

10. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL ACCESSORIES.

TEMPORARY GENERATOR REQUIREMENTS:

· CONSTRUCTING THE NEW SYSTEM AROUND THE EXISTING, AND SWITCHING OVER AT THE END, WILL

ELIMINATE THE REQUIREMENT FOR A TEMPORARY GENERATOR. PROVIDING A TEMPORARY

GENERATOR FOR THE OUTAGE REQUIRED DURING MAIN PANEL BRANCH FEEDER SWITCHOVER, IS

NOT A PRACTICAL OPTION.

FACILITY 806 - SEQUENCE OF WORK NOTES:

EXISTING CONDITIONS:

TRANSFORMERS: 1 EA. 3-PHASE 150 KVA TRANSFORMER (LIVE FRONT) INSIDE GENERATOR BUILDING

(FACILITY 806)

PRIMARY: FED UNDERGROUND FROM JUNCTION BLOCK ADJACENT TO BUILDING, AND THROUGH A

FLOOR TRENCH LOCATED UNDER TRANSFORMER.

SECONDARY: ONE 480V SERVICE FEED TO THE EXISTING AIR FIELD LIGHTING SYSTEM AUTOMATIC

TRANSFER SWITCH LOCATED IN THE SAME BUILDING. THE DOWNSTREAM SYSTEMS ARE

AGED AND OBSOLETE.

PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):

1. DISCONNECT AND REMOVE EXISTING PAD-MOUNTED TRANSFORMER. REMOVE PRIMARY CABLE TO

EXISTING JUNCTION BLOCK. LEAVE SECONDARY SERVICE CONDUCTORS IN PLACE.

2. INSTALL NEW PAD-MOUNTED, DEAD FRONT TRANSFORMER IN PLACE OF THE EXISTING.

3. RECONNECT EXISTING SECONDARY CONDUCTORS.

4. INSTALL NEW PRIMARY CABLES FROM EXISTING JUNCTION BLOCK TO NEW TRANSFORMER.

5. RE-ENERGIZE SYSTEM.

NOTE: NEW TRANSFORMER CAN BE REUSED AFTER FACILITY RENOVATION OR REMOVAL, AND

REINSTALLED ON NEW PAD.

TEMPORARY GENERATOR REQUIREMENTS:

· THE AIR FIELD LIGHTING SYSTEM IS BACKED UP WITH AN EXISTING GENERATOR, WHICH CAN RUN

DURING THE CONSTRUCTION PERIOD.

FACILITY 905 - SEQUENCE OF WORK NOTES:

EXISTING CONDITIONS:

TRANSFORMERS: 3 EA. SINGLE-PHASE 50 KVA TRANSFORMERS INSIDE STANDALONE VAULT (FACILITY 905)

PRIMARY: FED UNDERGROUND FROM SW #26

SECONDARY: TWO ACTIVE 480/277V SERVICE FEEDS AS DESCRIBED BELOW.

· 200 AMP SERVICE TO WESTWARD LIFT STATION GENERATOR BUILDING.

· 20 AMP SERVICE TO EXISTING PARKING AREA LIGHTING.

PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):

1. INSTALL NEW PAD-MOUNTED TRANSFORMER NEAR THE GENERATOR BUILDING.

2. RUN NEW 13.2KV FEEDER FROM SW #26 TO NEW TRANSFORMER, USING A COMBINATION OF SPARE

CONDUITS IN EXISTING DUCTBANK., AND NEW DUCTBANKS.

3. RUN NEW UNDERGROUND SERVICE FEEDER TO EXISTING ATS IN GENERATOR BUILDING.

4. RUN NEW UNDERGROUND FEEDER TO EXISTING AREA LIGHTING.

5. DISCONNECT ATS FROM EXISTING FEEDER AND RECONNECT TO NEW FEEDER.

6. REPLACE 3-WIRE FEEDERS WITH 4-WIRE FEEDERS, FROM EXISTING GENERATOR TO ATS, AND FROM

ATS TO HOUSE PANEL. KEEP OUTAGES TO A MINIMUM.

7. DISCONNECT EXISTING PRIMARY FROM SW #26, CONNECT NEW TRANSFORMER PRIMARY.

8. REMOVE VAULT TRANSFORMERS, WIRING, EQUIPMENT, AND ACCESSORIES. REMOVE VAULT BUILDING.

TEMPORARY GENERATOR REQUIREMENTS:

· THE LIFT STATION HAS A GENERATOR BACKUP, NO TEMPORARY GENERATOR POWER REQUIRED.

FACILITY 945 - SEQUENCE OF WORK NOTES:

EXISTING CONDITIONS:

TRANSFORMERS: 3 EA. SINGLE-PHASE 75 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 945

PRIMARY: FED UNDERGROUND FROM JUNCTION BLOCK NEXT TO SW #16

SECONDARY: TWO 120/208V SERVICE FEEDS AS DESCRIBED BELOW.

· 600 AMP SERVICE TO FACILITY TO A MAIN PANEL IN CHILLER ROOM ADJACENT TO VAULT. PANEL IS

OLD, FEEDS CHILLER EQUIPMENT AND SUB-PANELS.

· 600 AMP SERVICE TO A SECOND PANEL IN CHILLER ROOM PANEL IS OLD, FEEDS MECHANICAL

EQUIPMENT AND SUB-PANELS.

PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION)

1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA SOUTH OF FAC. 945.

2. RUN NEW SERVICE FEEDER FROM NEW TRANSFORMER TO CHILLER ROOM, TERMINATE NEAR EXISTING

MAIN PANEL.

3. RUN NEW 13.2KV DUCTBANK AND FEEDER FROM SW #16 TO NEW TRANSFORMER.

4. SCHEDULE OUTAGE FOR FACILITY 945.

5. REPLACE PANELS IN CHILLER ROOM BY DISCONNECTING EXISTING BRANCH CIRCUITS FROM EXISTING

PANELS AND REMOVING PANELS, AND REPLACING WITH NEW. EXTEND NEW FEEDER INTO NEW MAIN

PANEL'S MAIN BREAKER. NOTE: NEW PANELS TO CONTAIN ALL REQUIRED BRANCH CIRCUIT BREAKERS

TO FEED ALL EXISTING MAIN PANEL DOWNSTREAM CIRCUITS.

6. DISCONNECT EXISTING TRANSFORMERS AND FEEDERS. ENERGIZE NEW TRANSFORMER AND MAIN

PANEL.

7. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL ACCESSORIES.

8. INSTALL NEW LIGHT FIXTURE IN VAULT.

TEMPORARY GENERATOR REQUIREMENTS

· TEMPORARY GENERATOR WILL NOT BE REQUIRED.

A m r c w k s p r o j e c t s R

A E I S C

C A

F S P

A F B

A

N N

E X

E S R

A E I S R e c

T r a n s f

V a r D r a w i n g s E d w g

P

M

A u t o

C A

D

P

D F

G e n e r a l

D o c u m e n t a t i o n p c

Rectangle

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

SHEET

IDENTIFICATION

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

An O ne id a N at io n Co m pa ny

ENGINEER OF RECORD (E.O.R.)

MIKE PILO, FL PE #50067

ALPHA MRC, INC., #AA0003182/ #IB0001162

2395 N. COURTENAY PKWY, SUITE 102

MERRITT ISLAND, FL 32953

321-449-9455

ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS

FACILITY 972 - SEQUENCE OF WORK NOTES:

EXISTING CONDITIONS:

TRANSFORMERS: 3 EA. SINGLE-PHASE 50 KVA TRANSFORMERS INSIDE STANDALONE VAULT (FACILITY 972)

PRIMARY: FED UNDERGROUND FROM SW #8

SECONDARY: TWO 120/208V SERVICE FEEDS AS DESCRIBED BELOW.

· 500 AMP UNDERGROUND SERVICE TO FACILITY 996, LANDING ON A RECENTLY INSTALLED MAIN PANELBOARD IN

MECHANICAL/ELECTRICAL ROOM. PROPOSING A NEW HANDHOLE TO BE LOCATED NEAR THE VAULT, TO INTERCEPT AND REUSE

THE EXISTING SERVICE FEEDER. MAIN PANELBOARD TO REMAIN.

· 100 AMP SERVICE TO A SMALL PANELBOARD ON THE EXTERIOR WALL OF THE VAULT, WITH A BRANCH FEEDER TO A

DISTRIBUTION PANEL IN BUILDING 997.

PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION)

1. INSTALL NEW PAD MOUNTED TRANSFORMER NEAR THE EXISTING VAULT.

2. RUN NEW FACILITY 996 UNDERGROUND FEEDER TO NEW SERVICE HANDHOLE INSTALLED NEXT TO THE POINT WHERE

EXISTING SERVICE CONDUITS ENTER THE VAULT.

3. RUN NEW FACILITY 997 UNDERGROUND FEEDER TO A POINT NEXT TO EXISTING PANEL WITHIN FACILITY.

4. RUN PRIMARY DUCTBANK FROM SW #8 TO TRANSFORMER, AND INSTALL NEW PRIMARY CABLES. TERMINATE WITH ELBOWS

AND LEAVE READY TO CONNECT AT SWITCH

5. SCHEDULE OUTAGE FOR BOTH FACILITY 996 AND 997.

6. DE-ENERGIZE EXISTING VAULT AND DISCONNECT PRIMARY AND SECONDARY CABLES FROM TRANSFORMERS.

7. INTERCEPT FACILITY 996 FEEDER, EXTEND INTO NEW HANDHOLE, AND SPLICE EXISTING CONDUCTORS WITH NEW.

8. CONNECT NEW SERVICE FEEDER TO 997 PANEL.

9. ENERGIZE NEW TRANSFORMER AND FACILITIES 996 & 997.

10. REMOVE VAULT TRANSFORMERS, WIRING, EQUIPMENT, AND ACCESSORIES. REMOVE VAULT BUILDING.

TEMPORARY GENERATOR REQUIREMENTS:

· THE NEW SYSTEM WILL BE INSTALLED AROUND THE EXISTING AS MUCH AS POSSIBLE. THE FEEDER INTERCEPTS (STEPS #7 & 8)

CAN BE UNDERTAKEN WITHIN A SHORT OUTAGE TIME, AS TO CURTAIL THE REQUIREMENT FOR TEMPORARY GENERATOR

POWER. IF THE CONTRACTOR EXPECTS THE OUTAGE DURATION TO EXCEED 8 HOURS, THEN A TEMPORARY GENERATOR SHALL

BE PROVIDED TO SUPPORT BOTH FACILITIES DURING OUTAGE WORK (FOR TEMPORARY GENERATOR INFORMATION, REFER TO

SCHEDULE ON DRAWING E-601).

FACILITY 985 - SEQUENCE OF WORK NOTES:

EXISTING CONDITIONS:

TRANSFORMERS: 3 EA. SINGLE-PHASE 100 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 985

NOTE: 13.2KV PRIMARY RUNS THRU 986 VAULT BEFORE LANDING ON 985 VAULT

PRIMARY: FED UNDERGROUND FROM SW #12 AND THRU 986 VAULT

NOTE: 13.2 KV FEEDER LANDS ON A DEAD-FRONT JUNCTION BLOCK INSIDE VAULT THAT ALSO FEEDS EXISTING 300

KVA PAD-MOUNTED 480/277V TRANSFORMER, WHICH IS TO REMAIN.

SECONDARY: TWO 120/208V SERVICE FEEDS AS DESCRIBED BELOW.

· 1000 AMP SERVICE TO MAIN DISCONNECT CIRCUIT BREAKER IN ELECTRICAL ROOM ADJACENT TO VAULT. THE MAIN CIRCUIT

BREAKER FEEDS ONE DOWNSTREAM PANELBOARD. REPLACEMENT USING THE EXISTING SPACE IS NOT PRACTICAL: FIRST, MODERN 1000 AMP DISCONNECT ENCLOSURES LARGER THAN THE EXISTING UNIT AND WOULD NOT FIT IN THE SAME SPACE.

SECONDLY, THE INSULATION OF BRANCH FEEDER CONDUCTORS IS AGED, BRITTLE, AND IN SOME CASES IN VIOLATION OF THE

NEC, ATTEMPTING TO DISCONNECT BRANCH FEEDERS FROM THE EXISTING DISTRIBUTION EQUIPMENT FOR REUSE ON NEW

EQUIPMENT COULD CREATE A DANGEROUS CONDITION. THIRD, THE ROOM IS SHARED WITH COMM SERVICE, FURTHER

INCREASING THE CONGESTION. THIS ROOM NEEDS TO BE LEFT UNDISTURBED UNTIL A FULL FACILITY RENOVATION CAN BE

UNDERTAKEN.

· 400 AMP SERVICE FEEDER TO FACILITY 988.

PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):

1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA W OF FACILITY 985 AND CLOSE TO VAULT.

2. RUN PRIMARY CONDUIT FROM VAULT TO TRANSFORMER, AND INSTALL NEW PRIMARY CABLES. TERMINATE WITH ELBOWS AND

LEAVE READY TO CONNECT AT JUNCTION BLOCK.

3. RUN NEW FACILITY 985 AND FACILITY 988 UNDERGROUND FEEDERS FROM NEW TRANSFORMER TO VAULT, THEN RUN FEEDERS

IN EXPOSED CONDUITS INSIDE VAULT TO TWO NEW SERVICE DISCONNECTS LOCATED BACK-TO-BACK WITH MAIN ELECTRICAL

ROOM.

4. DISCONNECT EXISTING TRANSFORMERS AND FEEDERS. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL

ACCESSORIES.

5. EXTEND EXISTING SECONDARY SERVICES INTO NEW SERVICE DISCONNECTS. CONNECT NEW TRANSFORMER PRIMARY AT

JUNCTION BLOCK.

6. ENERGIZE NEW TRANSFORMER AND MAIN DISTRIBUTION SYSTEM.

TEMPORARY GENERATOR REQUIREMENTS:

· CONSTRUCTING THE NEW SYSTEM AROUND THE EXISTING, AND SWITCHING OVER AT THE END, WILL ELIMINATE THE

REQUIREMENT FOR A TEMPORARY GENERATOR. THE OUTAGE WOULD BE REQUIRED REGARDLESS DURING MAIN SERVICE

SWITCHOVER.

FACILITY 986 - SEQUENCE OF WORK NOTES:

EXISTING CONDITIONS:

TRANSFORMERS: 3 EA. SINGLE-PHASE 100 KVA TRANSFORMERS IN VAULT LOCATED WITHIN FACILITY 986

PRIMARY: FED UNDERGROUND FROM SW #12.

NOTE: 13.2 KV FEEDER LANDS ON A DEAD-FRONT JUNCTION BLOCK INSIDE VAULT THAT ALSO FEEDS EXISTING

1000 KVA PAD-MOUNTED 480/277V TRANSFORMER, WHICH IS TO REMAIN.

SECONDARY: THREE 120/208V SERVICE FEEDS AS DESCRIBED BELOW.

· 1000 AMP SERVICE TO MAIN DISCONNECT CIRCUIT BREAKER IN ELECTRICAL ROOM ADJACENT TO VAULT. THE MAIN CIRCUIT

BREAKER FEEDS TWO DOWNSTREAM PANELBOARDS AND OTHER SMALLER PANELS & DISCONNECTS CRAMMED IN THE

UNDERSIZED ROOM. THE EXISTING GEAR IS OBSOLETE AND UNSERVICEABLE, HOWEVER REPLACEMENT USING THE EXISTING

SPACE IS NOT PRACTICAL: FIRST, PRESENT WORKING CLEARANCES FOR EXISTING EQUIPMENT ARE NOT IN ACCORDANCE WITH

THE NEC, AND INSTALLATION OF NEW EQUIPMENT WITHIN THE AVAILABLE SPACE WOULD NOT CORRECT THIS ISSUE.

SECONDLY, THE INSULATION OF BRANCH FEEDER CONDUCTORS IS AGED, BRITTLE, AND IN SOME CASES IN VIOLATION OF THE

NEC, ATTEMPTING TO DISCONNECT BRANCH FEEDERS FROM THE EXISTING DISTRIBUTION EQUIPMENT FOR REUSE ON NEW

EQUIPMENT COULD CREATE A DANGEROUS CONDITION. THIRD, THE ROOM IS SHARED WITH COMM SERVICE, FURTHER

INCREASING THE CONGESTION. THIS DISTRIBUTION SYSTEM NEEDS TO BE LEFT UNDISTURBED UNTIL A FULL FACILITY

RENOVATION CAN BE UNDERTAKEN AND THE ROOM CAN BE GUTTED AND ADJUSTED IN SIZE.

· 600 AMP SERVICE TO MAIN DISCONNECT CIRCUIT BREAKER IN SAME ROOM AS ABOVE, SAME CONDITIONS APPLY.

· 400 AMP SERVICE TO DISCONNECT LABELED “NOT USED / NO LOAD”. WILL NOT BE RE-FED.

PROPOSED CONSTRUCTION (IN ORDER OF EXECUTION):

1. INSTALL NEW PAD-MOUNTED TRANSFORMER ON AVAILABLE OPEN AREA W OF FACILITY 986 AND CLOSE TO VAULT.

2. RUN PRIMARY CONDUIT FROM VAULT TO TRANSFORMER, AND INSTALL NEW PRIMARY CABLES. TERMINATE WITH ELBOWS AND

LEAVE READY TO CONNECT AT JUNCTION BLOCK.

3. RUN TWO NEW FACILITY 986 UNDERGROUND FEEDERS FROM NEW TRANSFORMER TO VAULT, THEN RUN FEEDERS IN EXPOSED

CONDUIT INSIDE VAULT TO TWO NEW SERVICE DISCONNECTS LOCATED BACK-TO-BACK WITH MAIN BREAKERS IN ELECTRICAL

ROOM.

4. DISCONNECT EXISTING TRANSFORMERS AND FEEDERS. REMOVE EXISTING TRANSFORMERS FROM VAULT, REMOVE ALL

ACCESSORIES.

5. EXTEND EXISTING SECONDARY SERVICE INTO NEW SERVICE DISCONNECT. CONNECT NEW TRANSFORMER PRIMARY AT

JUNCTION BLOCK.

6. ENERGIZE NEW TRANSFORMER AND MAIN DISTRIBUTION SYSTEM.

TEMPORARY GENERATOR REQUIREMENTS:

· CONSTRUCTING THE NEW SYSTEM AROUND THE EXISTING, AND SWITCHING OVER AT THE END, WILL ELIMINATE THE

REQUIREMENT FOR A TEMPORARY GENERATOR. THE OUTAGE WOULD BE REQUIRED REGARDLESS DURING MAIN SERVICE

SWITCHOVER.

E-003

F

L A

B O

Y M

A

L L E

N

M

P

I L O

S E

Q U

E N

W

O R

K

N

O T

L

C

O L E

M A

N

S X

F

G

B

E A

R D

R E

P A

E

C T

R I C

A L

T R

A N

S F

O R

M E

R S

V

A R

I O

U S

S X

F

P A

F B

F

L

A m r c w k s p r o j e c t s R

A E I S C

C A

F S P

A F B

A

N N

E X

E S R

A E I S R e c

T r a n s f

V a r D r a w i n g s E d w g

P

M

A u t o

C A

D

P

D F

G e n e r a l

D o c u m e n t a t i o n p

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

SHEET

IDENTIFICATION

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

An O ne id a N at io n Co m pa ny

ENGINEER OF RECORD (E.O.R.)

MIKE PILO, FL PE #50067

ALPHA MRC, INC., #AA0003182/ #IB0001162

2395 N. COURTENAY PKWY, SUITE 102

MERRITT ISLAND, FL 32953

321-449-9455

ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS

REFER TO ELECTRICAL GENERAL

NOTES ON DRAWING E-001.

ED-100

F

L A

B O

Y

M

A

L L E

N

M

P

I L O

F L

T

E M

O L

I T

I O

N

L

C

O L E

M A

N

S X

F

G

B

E A

R D

R E

P A

E

C T

R I C

A L

T R

A N

S F

O R

M E

R S

V

A R

I O

U S

S X

F

P A

F B

F

L

GENERAL NOTES - HAZARDOUS MATERIALS :

1. THERE SHALL BE NO HAZARDOUS AIR EMISSIONS FROM DEBRIS PER 29 CFR 1910. ANY SANDBLASTING OR NEEDLE-JET OPERATIONS MUST

BE APPROVED BY THE CONTRACTING OFFICER AND SHOULD HAVE FULL CONTAINMENT.

2. THE CONTRACTOR SHALL COMPLY WITH, BUT NOT LIMITED TO: AFI 32-7086, HAZARDOUS MATERIALS MANAGEMENT, FEBRUARY 2015 AND

THE 45TH SW HAZMAT TRACKING PROCEDURES FOR CONSTRUCTION AND SERVICE CONTRACTORS. NO HAZARDOUS MATERIALS ARE

ALLOWED TO BE BROUGHT ON TO ANY 45 SW INSTALLATION WITHOUT PRIOR APPROVAL. THE CONTRACTOR SHALL CONTACT THE 45

CES/CEIE HAZARDOUS MATERIALS PROGRAM MANAGER AT 321-494-9268 OR 321-543-1338 AND/OR ARTHUR.LORENZ.CTR@US.AF.MIL TO

REVIEW HAZARDOUS MATERIALS AUTHORIZATION PROCEDURES PRIOR TO HAZARDOUS MATERIALS BEING BROUGHT ON TO 45 SW

FACILITIES.

3. THE PROJECT WHICH MAY CONTAIN HAZARDOUS CHEMICALS, THE SDS FOR THOSE PRODUCTS SHALL BE SUBMITTED TO THE TOXIC

SUBSTANCES REVIEWER FOR REVIEW TO DETERMINE PERSONAL PROTECTIVE EQUIPMENT REQUIREMENT FOR PERSONNEL USING

PRODUCTS ALONG WITH GC'S SAFETY PLAN, PRIOR TO START OF WORK.

4. UNIVERSAL WASTE ENCOUNTERED DURING DEMOLITION WORK SHALL BE MANAGED AND DISPOSED OF IN ACCORDANCE WITH F.A.C.

62-730.185, 40 CFR PART 273 AND 45SW OPLAN 19-14.

5. THE REQUIREMENTS ESTABLISHED IN THE OSHA STANDARD FOR LEAD, CADMIUM AND CHROMIUM IN CONSTRUCTION, 29 CFR 1926.62, 29 CFR

1926.1127 AND 29 CFR 1926.1126, RESPECTIVELY, MUST BE COMPLIED WITH FOR ANY CONSTRUCTION, REFURBISHMENT, OR DEMOLITION

OPERATIONS WHICH INVOLVES THE DISTURBANCE OF PAINTS OR COATINGS WHICH MAY CONTAIN HEAVY METALS. THE LEAD, CADMIUM AND

CHROMIUM STANDARDS ESTABLISH SPECIFIC PERSONAL PROTECTIVE EQUIPMENT TO INCLUDE RESPIRATORY PROTECTION BASED ON THE

TYPE OF WORK TO BE PERFORMED.

6. PERSONNEL WHO UTILIZE RESPIRATORY EQUIPMENT SHALL COMPLY WITH OSHA STANDARD 29 CFR 1910.134. THE REQUIREMENTS FOR

PROTECTION OF PERSONNEL DURING DISTURBANCE OF COATINGS CONTAINING HEAVY METALS APPLY WHEN THE CONTENT HAS BEEN

IDENTIFIED AS "LOW". OSHA STANDARD 29 CFR 1926.62 DOES NOT INDICATE A LEVEL OF CONTENT LIMIT. IF LEAD IS PRESENT AT ANY LEVEL, THE STANDARD SHALL BE ADHERED. FOLLOW 45 SW GUIDANCE FOR THE REMOVAL OF MATERIALS AND COATINGS CONTAINING HEAVY

METALS.

7. THE GC SHALL UTILIZE HEAVY METALS SURVEY REPORTS PROVIDED AS AN APPENDIX TO THE SPECIFICATIONS IN ORDER TO COMPLETE THE

SCOPE OF WORK PER THE DRAWINGS AND SPECIFICATIONS. THE GC SHALL CONTACT THE CONTRACTING OFFICER IF THE PRESENCE OF

MATERIALS CONTAINING PCBS, ASBESTOS, AND/OR HEAVY METALS, INCLUDING LEAD, CADMIUM, OR CHROMIUM IS SUSPECTED OR

DISTURBED, AND HAS NOT BEEN IDENTIFIED BY THIS CONTRACT, BUT IS REQUIRED TO BE DISTURBED IN ORDER TO:

· PERFORM THE CONTRACT WORK;

· SAFELY ACCESS THE AREA OF WORK WITHOUT EXPOSURE TO HAZMAT ABOVE THE PEL;

· HAVE WORKERS PERFORM THE CONTRACT WORK WITHOUT EXPOSURE TO HAZMAT ABOVE PEL.

UNDER NO CIRCUMSTANCES SHALL ANY MATERIALS CONTAINING PCBS, ASBESTOS, AND/OR HEAVY METALS BE REMOVED WITHOUT THE

CONTRACTING OFFICER APPROVAL.

8. WORKERS SHALL UTILIZE RESPIRATORY PROTECTION PER 29 CFR 1910.134 AGAINST SILICA AND PARTICULATES WHEN DISTURBING

CONCRETE AND CMU DURING DEMOLITION AND REPAIR ACTIVITIES.

9. IF FRIABLE AND/OR REGULATED ASBESTOS CONTAINING MATERIAL (RACM) AS DEFINED BY F.A.C. 62-257.200 (17) IS IDENTIFIED OR

GENERATED DURING DEMOLITION ACTIVITIES, IT MUST BE REMOVED BY A LICENSED ASBESTOS CONTRACTOR AS DEFINED BY FL-STAT

469.001 (7). ACM REMOVAL MUST BE COMPLETED AS PER F.A.C. 62-257, FL-STAT 469 AND IN ACCORDANCE WITH SPECIFICATION SECTION 02 82

13.00 98, ASBESTOS ABATEMENT. FDEP FORM 62-257.900(1)(NOTICE OF DEMOLITION OR ASBESTOS RENOVATION) MUST BE FORWARDED TO

FDEP AT LEAST 20 WORKING DAYS PRIOR TO ACM REMOVAL.

FLAG NOTES - DEMOLITION:

1. EXISTING SINGLE PHASE TRANSFORMER (BANK OF 3 EA.) TO BE REMOVED, SEE ASSOCIATED SINGLE LINE DIAGRAM INDICATING

TRANSFORMERS' SIZE AND VOLTAGE. REMOVE ALL ASSOCIATED 13.2 KV LIVE WIRING, ACCESSORIES, STRUCTURES, INSULATORS, AND

TERMINATIONS. REMOVE ALL SECONDARY CONNECTIONS, WIRING, AND ASSOCIATED STRUCTURES.

2. EXISTING 3-PHASE LIVE-FRONT TRANSFORMER TO BE REMOVED.

3. EXISTING PRIMARY (13.2 KV) TRANSFORMER FEEDER IN CONCRETE ENCASED DUCTBANK. DISCONNECT CABLES AND REMOVE. CONCRETE

ENCASED CONDUITS TO BE ABANDONED.

4. EXISTING UNDERGROUND SERVICE FEEDER TO FACILITY 996 TO BE INTERCEPTED. EXCAVATE AROUND CONDUITS AT LOCATION INDICATED, AND EXCAVATE BETWEEN CONDUITS AND NEW HANDHOLE (SEE NEW CONSTRUCTION DRAWING E-161). CAREFULLY CUT CONDUITS

WITHOUT DAMAGING EXISTING CONDUCTORS, AND REMOVE A SECTION OF CONDUIT SUFFICIENTLY LONG TO ALLOW EXISTING CONDUCTORS

TO BE EXTENDED INTO NEW HANDHOLE. PROTECT EXISTING CONDUCTORS AND CONDUCTOR INSULATION FOR REUSE

5. EXISTING UNDERGROUND SECONDARY SERVICE FEEDER TO BE DISCONNECTED, CONDUCTORS SHALL BE REMOVED, UNDERGROUND

CONDUITS SHALL BE ABANDONED, EXPOSED PORTIONS OF CONDUITS SHALL BE REMOVED.

6. EXISTING SECONDARY SERVICE FEEDER TO BE DISCONNECTED FROM TRANSFORMER, CONDUCTORS SHALL REMAIN. PROTECT EXPOSED

CONDUCTORS FOR REUSE.

7. EXISTING UNDERGROUND SERVICE FROM VAULT PANEL TO PANEL IN FACILITY 997, TO BE REMOVED.

8. SAW-CUT, REMOVE AND DISPOSE OF EXISTING SECTIONS OF CONCRETE SIDEWALK AND/OR PAVEMENT TO ACCOMMODATE NEW FEEDERS.

9. EXISTING PANEL TO BE DE-ENERGIZED. ALL INTERIOR COMPONENTS (CIRCUIT BREAKERS, BUSES, HARDWARE, FRAMEWORK) SHALL BE

REMOVED. PANEL FEEDER SHALL BE REMOVED. BRANCH CIRCUIT FEEDERS SHALL REMAIN, LABEL AND PROTECT CONDUCTORS FOR REUSE.

NOTE: PANEL SHALL BE RE-PURPOSED AS A PULL BOX TO SPLICE EXISTING BRANCH FEEDER CONDUCTORS WITH NEW, CONTRACTOR SHALL

PROVIDE A 12-GAUGE GALVANIZED STEEL BOX COVER TO MATCH PANEL DIMENSIONS AND WITH MATCHING SCREW HOLES.

10. EXISTING PANEL TO BE REMOVED. PANEL FEEDER SHALL BE REMOVED. BRANCH FEEDER CONDUITS AND CONDUCTORS SHALL REMAIN IN

PLACE AND PROTECTED FOR REUSE. NOTE: CONDUITS SHALL BE TEMPORARILY SUPPORTED IN PLACE UNTIL NEW PANEL ENCLOSURE HAS

BEEN PUNCHED WITH ALL REQUIRED KO'S AND IS INSTALLED.

11. EXISTING PANEL TO REMAIN, SHOWN FOR REFERENCE.

12. EXISTING TRANSFORMER VAULT TO BE REMOVED. REMOVE ALL EXPOSED CONDUIT/WIRING, LIGHTING, DEVICES, MASONRY,FLOOR

FOUNDATION, AND ROOF. RESTORE GROUND AND GRASS TO MATCH SURROUNDINGS.

13. EXISTING TRANSFORMER VAULT TO BE REMOVED IN ITS ENTIRETY. REMOVE ALL EXPOSED CONDUIT/WIRING, LIGHTING, DEVICES, MASONRY, ROOF, AND FLOOR FOUNDATION. RESTORE GROUND AND GRASS TO MATCH SURROUNDINGS.

14. EXISTING VAULT TO REMAIN AFTER TRANSFORMER & ACCESSORY REMOVAL. EXISTING LIGHTING AND DEVICES TO REMAIN.

15. EXISTING ELECTRICAL EQUIPMENT TO BE REMOVED, REMOVE ALL ASSOCIATED CONDUIT, WIRE, AND ACCESSORIES.

16. EXISTING ELECTRICAL EQUIPMENT TO REMAIN UNDISTURBED, SHOWN FOR REFERENCE.

17. EXISTING 13.2 KV SWITCH TO REMAIN, SHOWN FOR REFERENCE.

18. EXISTING 13.2 KV JUNCTION BLOCK TO REMAIN, SHOWN FOR REFERENCE.

19. EXISTING 480V TRANSFORMER TO REMAIN, SHOWN FOR REFERENCE.

20. EXISTING PRIMARY (13.2 KV) FEEDER TO BE REMOVED. EXISTING DUCTBANK TO BE RE-USED.

21. EXISTING PRIMARY (13.2 KV) FEEDER TO BE REMOVED.

22. CORE-DRILL EXISTING CMU WALL ASSEMBLY AT LOCATIONS SHOWN ON PLAN. REMOVE AND DISPOSE OF DEMOLISHED CMU; AVOID DAMAGE

TO ADJACENT WALL SURFACE. PATCH AND REPAIR WALL SURROUND DAMAGED BY DEMOLITION WORK.

23. EXISTING UNDERGROUND SERVICE FEEDER TO FACILITY 404 TO BE INTERCEPTED. EXCAVATE AROUND CONDUITS AT LOCATION INDICATED, AND EXCAVATE BETWEEN CONDUITS AND NEW HANDHOLE (SEE NEW CONSTRUCTION DRAWING E-101). CAREFULLY CUT CONDUITS

WITHOUT DAMAGING EXISTING CONDUCTORS, AND REMOVE A SECTION OF CONDUIT SUFFICIENTLY LONG TO ALLOW EXISTING CONDUCTORS

TO BE EXTENDED INTO NEW HANDHOLE. PROTECT EXISTING CONDUCTORS AND CONDUCTOR INSULATION FOR REUSE.

24. EXISTING PRIMARY CONCRETE ENCASED DUCTBANK CONTAINING 13.2 KV FEEDER SERVING TRANSFORMER IN BUILDING 429. DUCTBANK

ALSO CONTAINS 3 EA. ADDITIONAL SPARE CONDUITS. CONTRACTOR SHALL EXCAVATE AROUND DUCTBANK AND IDENTIFY LOCATION OF

SPARES WITHIN ENCASEMENT. CONTRACTOR SHALL CAREFULLY CUT CONCRETE AWAY FROM SPARE CONDUIT, TO AN EXTENT THAT WILL

ALLOW FOR TWO FACTORY 90-DEGREE ELBOWS TO BE ADAPTED TO THE EXPOSED DUCTS. NOTE: NEW PAD-MOUNTED TRANSFORMER WILL

BE INSTALLED AT THIS LOCATION.

25. PRIOR TO CUTTING DUCTBANK, CONTRACTOR SHALL COLLECT A SAMPLE OF THE DUCTBANK CONCRETE AND HAVE THE SAMPLE ANALYZED

FOR ASBESTOS CONTAINING MATERIALS (ACM), USING ANALYTICAL METHODS EPA 600/R-93/116 AND 600/M4-82-020. IF ACM IS DETECTED IN

THE DUCTBANK CONCRETE, CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER FOR DIRECTION BEFORE PROCEEDING

FURTHER WITH THE WORK. ANY CONTRACTOR'S WORK REQUIRING DISTURBANCE OF ACM SHALL BE PERFORMED IN ACCORDANCE WITH 29

CFR 1926.1101, 29 CFR 1926.850, 40 CFR 763, 45SW OPLAN 19-14, FLORIDA STATUTE 469, F.A.C. CHAPTER 62-257 AND FDEP FORM 62-257.900(1).

FDEP FORM 62-257.900 (1)(NOTICE OF DEMOLITION OR ASBESTOS RENOVATION) MUST BE FORWARDED TO FDEP AT LEAST 10 DAYS PRIOR TO

ACM REMOVAL.

26. EXISTING PORTION OF UNDERGROUND SERVICE FEEDER TO FACILITY 404 TO BE REMOVED (CONDUCTORS TO BE REMOVED AFTER NEW

SERVICE IS IN PLACE, CONDUITS TO BE ABANDONED).

27. NON-FRIABLE ASBESTOS WAS DETECTED IN ROOFING MATERIALS IN BUILDING 972. CARE MUST BE TAKEN DURING BUILDING DEMOLITION

ACTIVITIES NOT TO GENERATE FRIABLE ASBESTOS. IF FRIABLE ASBESTOS IS IDENTIFIED OR GENERATED DURING BUILDING DEMOLITION

ACTIVITIES, IT MUST BE ABATED AND REMOVED BY A LICENSED ASBESTOS CONTRACTOR AS DEFINED BY FL-STAT 469.001 (7). ACM

ABATEMENT AND REMOVAL MUST BE COMPLETED AS PER F.A.C. 62-257, FL-STAT 469 AND IN ACCORDANCE WITH SPECIFICATION SECTION 02

82 13.00 98, ASBESTOS ABATEMENT. FDEP FORM 62-257.900(1)(NOTICE OF DEMOLITION OR ASBESTOS RENOVATION) MUST BE FORWARDED

TO FDEP AT LEAST 20 WORKING DAYS PRIOR TO ACM REMOVAL.

A m r c w k s p r o j e c t s R

A E I S C

C A

F S P

A F B

A

N N

E X

E S R

A E I S R e c

T r a n s f

V a r D r a w i n g s E D d w g

P

M

A u t o

C A

D

P

D F

G e n e r a l

D o c u m e n t a t i o n p c

1229014770C Rectangle

1229014770C Text Box

NOT USED

Text Box

E

S

E

S

E

S

E S

E

E

E

1'-6"

E

S

E

S

E

S

E

E

E

E

E

E

E

E

E

E

E

S

E

E

E

E

E

E

E

E

E

E

SW

E

E

SW

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

SHEET

IDENTIFICATION

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

An O ne id a N at io n Co m pa ny

ENGINEER OF RECORD (E.O.R.)

MIKE PILO, FL PE #50067

ALPHA MRC, INC., #AA0003182/ #IB0001162

2395 N. COURTENAY PKWY, SUITE 102

MERRITT ISLAND, FL 32953

321-449-9455

ARCHITECTS~ENGINEERS~INTERIOR DESIGNERS

SCALE:

ELECTRICAL SITE PLAN - DEMOLITION

1/32" = 1'-0"

LAUNDRY

ROOM (N.I.C.)

RM 1LAUNDRY1

SCALE:

EXTERIOR/INTERIOR PHOTOS - DEMOLITION:

NONE

PHOTO ED-111:

BLDG 546 - EXT. - SWITCHGEAR

SCALE:

ENLARGED PLAN - BLDG 546 - DEMOLITION

3/16" = 1'-0"

PHOTO ED-111:

BLDG 546 - EXT. - TRANSFORMER

T

R

U

E

N

O

R

T

H

NORTH

PLAN

MECHANICAL

ROOM (N.I.C.)

RM 1MECH2

WEIGHT

ROOM (N.I.C.)

RM 106

ELECTRICAL

ROOM

RM 1ELEC1

TRUE

NORTH

NORTH

PLAN

AREA OF WORK:

BLDG 546

SCALE:

SINGLE LINE DIAGRAM BLDG 546 - DEMOLITION

N.T.S.

S1T3 T4 T1 T2

CUSTODIAL

ROOM

RM 1JAN1

STORAGE

ROOM (N.I.C.)

RM 1STOR1

HALLWAY

(N.I.C.)

RM 1HALL1

PHOTO ED-111:

BLDG 546 - INT. - TRANSFORMER

PHOTO ED-111:

BLDG 546 - INT. - MAIN PANEL

PHOTO ED-111:

BLDG 546 - INT. - DISCONNECT

SW #48A (FDR D1)

TO SW #48

(FDR D1)

BUILDING 546

T546 3-100KVA 208Y/120V

POLE TYPE GYM VAULT

T533

CT YD

500KVA

208Y/120V

T546

500KVA

480Y/277V

POOL

T533 SO.

750KVA

208Y/120V

GENERAL NOTES:

REFER TO ELECTRICAL GENERAL NOTES ON DRAWING E-001.

INFORMATION ON EXISTING CONDITIONS IS BASED ON THE AVAILABLE EXISTING

DOCUMENTS AND OBSERVABLE IN-PLACE ELEMENTS. CONTRACTOR TO FIELD

MEASURE AND VERIFY REQUIREMENTS FOR EXACT DIMENSIONS.

EXISTING ELECTRICAL UNDERGROUND/ABOVEGROUND LINES TO REMAIN, NOT

RELATED TO THIS SCOPE ARE NOT SHOWN FOR CLARITY PURPOSES.

KEY MAP NOTE:

PAFB KEY MAP IS SHOWING SOUTH BASE AREA ONLY FOR CLARITY PURPOSES.

FOR PAFB COMPLETE KEY MAP, REFER TO DRAWING G-001.

SEQUENCE OF WORK NOTE:

REFER TO DRAWINGS E-002 AND E-003 FOR FACILITY SEQUENCE OF WORK NOTES.

PHOTO ED-111:

BLDG 546 - INT. - ELECTRICAL ITEMS

BLDG 546

1 17

SW-48A

CARDIOVASCULAR

ROOM (N.I.C.)

RM 103

FROM SW-48A; FOR

CONTINUATION,

REFER TO DEMO SITE

PLAN THIS DRAWING

ELECTRICAL

ROOM

BOUNDARY

CUSTODIAL ROOM

IN BLDG 546

EXISTING ELECTRICAL ITEMS TO REMAIN

16'12'8'0'2'4' 4'

GRAPHIC SCALE 3/16" = 1'-0"

FROM/TO EXISTING PAD MOUNTED

480/277 TRANSFORMER AS SHOWN

ON DEMO SITE PLAN THIS DRAWING

EXISTING PAD MOUNTED 480/277

TRANSFORMER SERVING BLDG 546

TO REMAIN - SHOWN FOR REFERENCE

EXISTING MAIN

PANEL TO REMAIN

0'

GRAPHIC SCALE: 1/32" = 1'-0"

20'10'30' 40' 60' 80'20' 100'

ED-111

F

L A

B O

Y M

A

L L E

N

M

P

I L O

B L

A

E M

O L

I T

I O

N

L

C

O L E

M A

N

S X

F

G

B

E A

R D

R E

P A

E

C T

R I C

A L

T R

A N

S F

O R

M E

R S

V

A R

I O

U S

S X

F

P A

F B

F

L

PORTION OF

EXPOSED

SECONDARY

SERVICE

FEEDER TO BE

DEMOLISHED

PORTION OF

SECONDARY

SERVICE

FEEDER TO

REMAIN

PORTION OF EXPOSED SECONDARY

SERVICE FEEDER TO BE DEMOLISHED

PORTION OF SECONDARY

SERVICE FEEDER TO REMAIN

SCALE:

KEY PLAN

NTS

TRUE

NORTH

NORTH

PLAN

PAFB NORTH

PAFB SOUTH

TYP.

A m r c w k s p r o j e c t s R

A E I S C

C A

F S P

A F B

A

N N

E X

E S R

A E I S R e c

T r a n s f

V a r D r a w i n g s E D d w g

P

M

A u t o

C A

D

P

D F

G e n e r a l

D o c u m e n t a t i o n p

E

E

E

E

8"

ES

E S

E

S

E

E

E

E

E

E

E

E

E

E

E

E

D

E

L

I

V

E

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

SHEET

IDENTIFICATION

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

An O ne id a N at io n Co m pa ny

ENGINEER OF RECORD (E.O.R.)

MIKE PILO, FL PE #50067

ALPHA MRC, INC., #AA0003182/ #IB0001162

2395 N. COURTENAY PKWY, SUITE 102

MERRITT ISLAND, FL 32953

321-449-9455

ARCHITE…