FA2521-13-R-0008_Amendment_1.doc

DOC document 54 KB Posted

Attached to
Instrumentation Radar Support Program (IRSP) Federal contract opportunity
Solicitation number
FA2521-13-R-0008
Issued by
Department of the Air Force Space Command

About this file

FA2521-13-R-0008 Amendment 1

View the file

Other files for this federal contract opportunity

Other files attached to Instrumentation Radar Support Program (IRSP), newest first.
File Type Posted
FA2521-13-R-0008_Amendment_4.doc DOC document
FA2521-13-R-0008_Amendment_3.doc DOC document
Attachment_1_-_IRSP_SOW_13_Apr_15.docx DOCX document
Attachment_L-11_TEP_Worksheet_14_Apr_15.xlsx XLSX spreadsheet
FA2521-13-R-0008_Amendment_2.doc DOC document
Attachment_L-07_Logistics_Sample_-_1_Apr_15_(Amendment_1).xlsx XLSX spreadsheet
Attachment_L-06_Eng_and_Obs_Sample_-_1_Apr_15_(Amendment_1).xlsx XLSX spreadsheet
Attachment_L-09_PEQ_Cover_Letter.docx DOCX document
Attachment_8_-_Range_Resource_List.docx DOCX document
Attachment_L-11_TEP_Worksheet.xlsx XLSX spreadsheet
Final_RFP_FA2521-13-R-0008_23_Mar_15.doc DOC document
Attachment_L-03_IRSP_Phase_Out_Plan_16_Mar_2015.docx DOCX document
Attachment_L-01_Historical_Info_13_Feb_15.docx DOCX document
Attachment_2_-_IRSP_Government_Equipment.pdf PDF
Attachment_L-04_Overhaul_Work_Specification.pdf PDF
Attachment_5_-_Contract_Funding_Worksheet.xlsx XLSX spreadsheet
Attachment_7_-_Supported_Ranges_System_List.docx DOCX document
Attachment_3a_-_IRSP_Government_Property.pdf PDF
Attachment_3b_-_IRSP_Government_Property.pdf PDF
Attachment_3g_-_IRSP_Government_Property.pdf PDF
Attachment_3e_-_IRSP_Government_Property.pdf PDF
Exhibits_A-P_IRSP-CDRL-Portfolio_-_2_Oct_14.pdf PDF
Attachment_1_-_IRSP_SOW_23_Mar_15.docx DOCX document
Attachment_3d_-_IRSP_Government_Property.pdf PDF
Attachment_L-02_Question_and_Answer_Template.docx DOCX document
Attachment_6_-_Labor_Rates_Listing_Placeholder.docx DOCX document
Attachment_3f_-_IRSP_Government_Property.pdf PDF
Attachment_4_-_DD254.pdf PDF
Attachment_L-08__Performance_Eval_Questionnaire.docx DOCX document
Attachment_L-10_Sample_Consent_Letter.docx DOCX document
Attachment_3c_-_IRSP_Government_Property.pdf PDF
Attachment_L-05_Sample_System_Mod.docx DOCX document
Attachment_L-06_Eng_and_Obs_Sample.xlsx XLSX spreadsheet
Attachment_L-07_Logistics_Sample.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The solicitation issue date has changed from 19-Mar-2015 to 23-Mar-2015.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been added by full text:

AMENDMENT 1

Attachment L-06 Engineering/Obsolescence Sample Tasks Changes

1. 45 SW sample - added assumption - “Assumption is range personnel changed the chiller”

Attachment L-07 Logistics Sample Changes

Material Tab

1. Over $20K - delete MOTR Switch Tube P/N 4CW100,000E. Item was duplicate and had comma in P/N.

R-F Tab

1. For P/N MG3692B - changed assumptions to read “Depot verified problem and recommended logistics manager to issue purchase repair to OEM vendor. OEM vendor determined output amplifier, front display, and driver pulse circuit were defective and replaced.”

2. For P/N MFS 8.9-9.5-1K-200P - changed assumptions to read “Depot verified problem and recommended logistics manager to issue purchase repair to OEM vendor. The OEM vendor determined tuning circuit was defective and replaced”

3. For P/N 3001580-12 - changed assumptions to read “After evaluation it was determined that the LNA's P/N 300412-03 and the spin motor belt were defective and replaced”

4. For P/N W146-100 - changed preliminary information to read “A requisition was submitted to the depot. Contractor checked but no replacement item was available. Range sent in defective item for repair and return.”

- Changed assumptions to read “Assumption contractor checked with OEM and determined repair would take 6 months and decided best value was to repair in-house. Determined the high voltage rings and motor drive rings were shorted. Slip ring would require complete rebuild.”

5. For P/N PG-2510 - changed assumptions to read “Assumption after evaluation it was determined bull gear needed repaired and both elevation gear box main bearing need replaced.”

6. For P/N Perkins 1204 - added “with 100KW generator tail” after P/N. Changed assumptions to read “Assumption after evaluation engine requires rebuilding generator bearings and regulator need replaced. Repair all EPA subsystems, along with reconnect to generator package test for 8 hrs under load bank 100KW”

Transportation Tab

1. Delete - 45 SW Filter Assembly P/N 8472049-2

The following have been modified:

LIST OF ATTACHMENTS

ATTACHMENTS ASSOCIATED WITH RESULTING CONTRACT:

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE

Attachment 1

Attachment 2 Statement of Work (SOW)

Government Equipment Listing

23 Mar 15

11 Feb 15

Attachment 3a

Attachment 3b

Attachment 3c

Attachment 3d

Attachment 3e

Attachment 3f

Attachment 3g Government Property Listing

Government Property Listing (cont.)

Government Property Listing (cont.)

Government Property Listing (cont.)

Government Property Listing (cont.)

Government Property Listing (cont.)

Government Property Listing (cont.)

12 Feb 15

12 Feb 15

12 Feb 15

12 Feb 15

12 Feb 15

12 Feb 15

12 Feb 15

Attachment 4

Attachment 5

Attachment 6

Attachment 7

Attachment 8

DD254

Contract Funding Worksheet

Labor Rates Listing

Supported Range’s System List

Range Resource List

TBD

14 Apr 14

16 Dec 14

TBD

16 Dec 14

23 Dec 14

EXHIBITS:

PAGES

DATE

Exhibit A Reserved Phase-In

RESERVED

Exhibit B 001-007 Inventory Program Management

15 Aug 14

Exhibit C 001 Obsolescence Engineering 1

14 Aug 14

Exhibit D 001 Program Equipment Replacement 1 25 Sep 14

Exhibit E 001 Phase Out 1 13 Aug 14

Exhibit F Reserved Data

Exhibit G 001-003 Material Acquisition

14 Aug 14

Exhibit H 001-002 Component Remanufacture/Fabrication

14 Aug 14

Exhibit J 001-002 Engineering & Technical Support

14 Aug 14

Exhibit K 001 Pre Overhaul Survey

Exhibit L 001-002 Field Overhauls

Exhibit M 001-004 System Modification (FFP)

20 Aug 14

Exhibit N Reserved System Modification (CPFP)

Exhibit P Reserved Transportation

DOCUMENTS ASSOCIATED WITH THE SOLICITATION:

DOCUMENT TYPE
DESCRIPTION PAGES DATE

Attachment L-01

Historical Info./Workload Indicators

18 13 Feb 15

Attachment L-02

Question and Answer Template

1 23 Oct 14

Attachment L-03

Phase-Out Plan

38 16 Mar 15

Attachment L-04

Field Overhaul Work Specification

4 23 Dec 14

Attachment L-05

System Modification Sample

1 09 Feb 15

Attachment L-06

Engineering/Obsolescence Sample Tasks 1 02 Apr 15

Attachment L-07

Logistics Sample

5 02 Apr 15

Attachment L-08

Performance Evaluation Questionnaire

5 05 Nov 14

Attachment L-09

Performance Cover Letter

1 04 Nov 14

Attachment L-10

Sample Consent Form

1 29 Dec 14

Attachment L-11

Total Evaluated Price Worksheet

12 11 Feb 15 (End of Summary of Changes)

File details come from the government source that posted it. Updated .