FA2521-13-R-0008_Amendment_1.doc
DOC document 54 KB Posted
- Attached to
- Instrumentation Radar Support Program (IRSP) Federal contract opportunity
- Solicitation number
- FA2521-13-R-0008
About this file
FA2521-13-R-0008 Amendment 1
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The solicitation issue date has changed from 19-Mar-2015 to 23-Mar-2015.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
AMENDMENT 1
Attachment L-06 Engineering/Obsolescence Sample Tasks Changes
1. 45 SW sample - added assumption - “Assumption is range personnel changed the chiller”
Attachment L-07 Logistics Sample Changes
Material Tab
1. Over $20K - delete MOTR Switch Tube P/N 4CW100,000E. Item was duplicate and had comma in P/N.
R-F Tab
1. For P/N MG3692B - changed assumptions to read “Depot verified problem and recommended logistics manager to issue purchase repair to OEM vendor. OEM vendor determined output amplifier, front display, and driver pulse circuit were defective and replaced.”
2. For P/N MFS 8.9-9.5-1K-200P - changed assumptions to read “Depot verified problem and recommended logistics manager to issue purchase repair to OEM vendor. The OEM vendor determined tuning circuit was defective and replaced”
3. For P/N 3001580-12 - changed assumptions to read “After evaluation it was determined that the LNA's P/N 300412-03 and the spin motor belt were defective and replaced”
4. For P/N W146-100 - changed preliminary information to read “A requisition was submitted to the depot. Contractor checked but no replacement item was available. Range sent in defective item for repair and return.”
- Changed assumptions to read “Assumption contractor checked with OEM and determined repair would take 6 months and decided best value was to repair in-house. Determined the high voltage rings and motor drive rings were shorted. Slip ring would require complete rebuild.”
5. For P/N PG-2510 - changed assumptions to read “Assumption after evaluation it was determined bull gear needed repaired and both elevation gear box main bearing need replaced.”
6. For P/N Perkins 1204 - added “with 100KW generator tail” after P/N. Changed assumptions to read “Assumption after evaluation engine requires rebuilding generator bearings and regulator need replaced. Repair all EPA subsystems, along with reconnect to generator package test for 8 hrs under load bank 100KW”
Transportation Tab
1. Delete - 45 SW Filter Assembly P/N 8472049-2
The following have been modified:
LIST OF ATTACHMENTS
ATTACHMENTS ASSOCIATED WITH RESULTING CONTRACT:
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
Attachment 1
Attachment 2 Statement of Work (SOW)
Government Equipment Listing
23 Mar 15
11 Feb 15
Attachment 3a
Attachment 3b
Attachment 3c
Attachment 3d
Attachment 3e
Attachment 3f
Attachment 3g Government Property Listing
Government Property Listing (cont.)
Government Property Listing (cont.)
Government Property Listing (cont.)
Government Property Listing (cont.)
Government Property Listing (cont.)
Government Property Listing (cont.)
12 Feb 15
12 Feb 15
12 Feb 15
12 Feb 15
12 Feb 15
12 Feb 15
12 Feb 15
Attachment 4
Attachment 5
Attachment 6
Attachment 7
Attachment 8
DD254
Contract Funding Worksheet
Labor Rates Listing
Supported Range’s System List
Range Resource List
TBD
14 Apr 14
16 Dec 14
TBD
16 Dec 14
23 Dec 14
EXHIBITS:
PAGES
DATE
Exhibit A Reserved Phase-In
RESERVED
Exhibit B 001-007 Inventory Program Management
15 Aug 14
Exhibit C 001 Obsolescence Engineering 1
14 Aug 14
Exhibit D 001 Program Equipment Replacement 1 25 Sep 14
Exhibit E 001 Phase Out 1 13 Aug 14
Exhibit F Reserved Data
Exhibit G 001-003 Material Acquisition
14 Aug 14
Exhibit H 001-002 Component Remanufacture/Fabrication
14 Aug 14
Exhibit J 001-002 Engineering & Technical Support
14 Aug 14
Exhibit K 001 Pre Overhaul Survey
Exhibit L 001-002 Field Overhauls
Exhibit M 001-004 System Modification (FFP)
20 Aug 14
Exhibit N Reserved System Modification (CPFP)
Exhibit P Reserved Transportation
DOCUMENTS ASSOCIATED WITH THE SOLICITATION:
| DOCUMENT TYPE |
| DESCRIPTION PAGES DATE |
Attachment L-01
Historical Info./Workload Indicators
18 13 Feb 15
Attachment L-02
Question and Answer Template
1 23 Oct 14
Attachment L-03
Phase-Out Plan
38 16 Mar 15
Attachment L-04
Field Overhaul Work Specification
4 23 Dec 14
Attachment L-05
System Modification Sample
1 09 Feb 15
Attachment L-06
Engineering/Obsolescence Sample Tasks 1 02 Apr 15
Attachment L-07
Logistics Sample
5 02 Apr 15
Attachment L-08
Performance Evaluation Questionnaire
5 05 Nov 14
Attachment L-09
Performance Cover Letter
1 04 Nov 14
Attachment L-10
Sample Consent Form
1 29 Dec 14
Attachment L-11
Total Evaluated Price Worksheet
12 11 Feb 15 (End of Summary of Changes)
File details come from the government source that posted it. Updated .