Attachment_L-06_Eng_and_Obs_Sample_-_1_Apr_15_(Amendment_1).xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Instrumentation Radar Support Program (IRSP) Federal contract opportunity
Solicitation number
FA2521-13-R-0008
Issued by
Department of the Air Force Space Command

About this file

Amended Attachment L-06 Engineering/Obsolescence Sample Tasks

View the file

Other files for this federal contract opportunity

Other files attached to Instrumentation Radar Support Program (IRSP), newest first.
File Type Posted
FA2521-13-R-0008_Amendment_4.doc DOC document
FA2521-13-R-0008_Amendment_3.doc DOC document
FA2521-13-R-0008_Amendment_2.doc DOC document
Attachment_1_-_IRSP_SOW_13_Apr_15.docx DOCX document
Attachment_L-11_TEP_Worksheet_14_Apr_15.xlsx XLSX spreadsheet
Attachment_L-07_Logistics_Sample_-_1_Apr_15_(Amendment_1).xlsx XLSX spreadsheet
FA2521-13-R-0008_Amendment_1.doc DOC document
Attachment_L-08__Performance_Eval_Questionnaire.docx DOCX document
Attachment_L-10_Sample_Consent_Letter.docx DOCX document
Attachment_3c_-_IRSP_Government_Property.pdf PDF
Attachment_L-05_Sample_System_Mod.docx DOCX document
Attachment_L-06_Eng_and_Obs_Sample.xlsx XLSX spreadsheet
Attachment_L-07_Logistics_Sample.xlsx XLSX spreadsheet
Attachment_L-09_PEQ_Cover_Letter.docx DOCX document
Attachment_8_-_Range_Resource_List.docx DOCX document
Attachment_L-11_TEP_Worksheet.xlsx XLSX spreadsheet
Final_RFP_FA2521-13-R-0008_23_Mar_15.doc DOC document
Attachment_L-03_IRSP_Phase_Out_Plan_16_Mar_2015.docx DOCX document
Attachment_L-01_Historical_Info_13_Feb_15.docx DOCX document
Attachment_2_-_IRSP_Government_Equipment.pdf PDF
Attachment_L-04_Overhaul_Work_Specification.pdf PDF
Attachment_5_-_Contract_Funding_Worksheet.xlsx XLSX spreadsheet
Attachment_7_-_Supported_Ranges_System_List.docx DOCX document
Attachment_3a_-_IRSP_Government_Property.pdf PDF
Attachment_3b_-_IRSP_Government_Property.pdf PDF
Attachment_3g_-_IRSP_Government_Property.pdf PDF
Attachment_3e_-_IRSP_Government_Property.pdf PDF
Exhibits_A-P_IRSP-CDRL-Portfolio_-_2_Oct_14.pdf PDF
Attachment_1_-_IRSP_SOW_23_Mar_15.docx DOCX document
Attachment_3d_-_IRSP_Government_Property.pdf PDF
Attachment_L-02_Question_and_Answer_Template.docx DOCX document
Attachment_6_-_Labor_Rates_Listing_Placeholder.docx DOCX document
Attachment_3f_-_IRSP_Government_Property.pdf PDF
Attachment_4_-_DD254.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineering, Obs Sample Tasks

Sample Engineering Tasks
RANGESYSTEM AFFECTEDDESCRIPTION OF PROBLEMDESCRIPTION OF SOLUTIONASSUMPTIONS

45 SW AN/MPS-39 and AN/FPS-134 Evaluate recent failures of the MOTR transmitter and Rosa ( FPS-134) transmitter MOTR radar - Fault isolation and repair of MOTR transmitter determined CCTWT was bad and replaced with on-site spare, and reseated the input connector for the RF drive to the TWT.

FPS-134 Radar - Isolated fault to chiller unit. Determined the chiller needed to be replaced. Replaced chiller with on-site spare. Assumption is range personnel changed the chiller.

96 TW RIR-980 Investigate modulator oil leaks Determined four couplers needed to be replaced. Replaced couplers with on-site spares. Due to leak, transformer had to be refilled with oil. Required any air that had entered the closed system while it had been opened to refill with transformer oil, to be evacuated. Performed a performance check upon completion to ensure the unit was operating normally, with full oil flow visible in the flow indicator and no air bubbles visible in the sight glass. The quick-disconnect couplers in the modulator oil cooling system supply and return lines incurred a slow leak over an unspecified amount of time. The leak rate had been noted to increase in recent months to the point where it was messy and the oil level loss in the modulator was becoming a concern.

WSMR-Proper J-56 Viasat Telemetry Pedestal Not Functioning correctly Installed and aligned elevation encoder properly and restored system to operation. Assumption an elevation encoder was found to have been improperly services by range personnel and the corrective action was to reinstall and align the encoder

PMRFRadars - ROSA and COSIPPMRF requires Subject Matter Experts (SME) to assist in supporting the Radar assets during high cost test that have specific test windows.Field Service manweek support through IRSP for SMEs with ROSA and COSIP technical, operations, analysis, and level 3 maintenance capabilities.Support is to provide the necessary SMEs either through direct employee pool or sub-vendor with required SMEs. All personnel will have SECRET clearance and dependent on mission may require Top Secret. Must be able to do trusted download and courier of radar data. Mission tests can last between 10 to 25 days and will be continuous. Some missions will be followed by additional missions and will require extended travel requirements that my exceed 30 days. Must be able to review real time data and make specific event calls. Will use 10 day mission for this example to determine no. of hours
Sample Obsolescence Tasks
Form, Fit, Function (FFF) Replacement
COMPONENT NAMESYSTEMNSN or PNASSUMPTIONS
Pump/motorMPS-25P/N: 8004510-10Assume these parts are obsolete and cannot be obtained from a known source of supply. List steps to provide a FFF replacement.
Reverse Engineering
COMPONENT NAMESYSTEMNSN or PNASSUMPTIONS
Servo Drive MotorMPS-25P/N: TT-4204-3001CAssume these parts are obsolete. Motors no longer manufactured. Vendor has not built these motors for 15+ years. Reverse Engineer will require a complete set of specification documents that provides electrical and mechanical drawings.

&"Arial,Regular"FA2521-13-R-0008 Attachment L-06 Engineering/Obsolescence Sample Tasks

&"Arial,Regular"Page &P of &N

File details come from the government source that posted it. Updated .