Attachment_L-11_TEP_Worksheet.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Instrumentation Radar Support Program (IRSP) Federal contract opportunity
- Solicitation number
- FA2521-13-R-0008
About this file
See File Name
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 Phase-In
Phase-In price proposed shall be consistent with Phase-In Plan and the requirements under SOW 3.1 and will be incorporated into the contact - This is not part of the TEP.
| Unit of Issue | # of Units | Total | |
| Phase-in | Months | 3 | $ - 0 |
CLIN 0001 Phase-In FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
CLIN 0002 Inventory-PM
Inventory and Program Management price proposed shall be consistent with the requirements under SOW 3.2 and will be incorporated into the contact as the price for Contract Year 1.
| Unit of Issue | # of Units | Total | |
| Inventory and Program Management | Months | 12 | $ - 0 |
CLIN 0002 Inventory/Program Management FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
CLIN 0003 Obsolescence
Obsolescence cost shall be consistent with the requirements under SOW 3.3 and the obsolescence samples in Attachment L-06. If using a subcontractor, tailor the format below to include subcontractor costs and overheads proposed. The obsolescence samples shall be priced using the contractor's FY16 rates.
| Obsolescence Samples - Attachment L-06 | |||
| Labor | Hours | Rate | Total |
| Labor Cat 1 | |||
| Labor Cat 2 | |||
| Labor Cat 3 | |||
| Labor Cat 4 | |||
| Overhead % | |||
| Fringe % | |||
| G&A % | |||
| SubTotal Costs | $ - 0 | ||
| Fee % | |||
| Total Cost | $ - 0 | ||
| Note: All categories above the SubTotal Costs are tailorable to add any additional offeror burdens |
CLIN 0003 Obsolescence Engineering FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
CLIN 0004 Test Equipment
Test and specialized equipment costs proposed shall be consistent with the requirements under SOW 3.4 and the test and specialized equipment sample in Attachment L-07. Indirect Costs shall be broken out to show application of any applicable rate. The sample equipment parts shall be priced using the contractor's FY17 rates.
| Sample Test and Specialized Equipment - Attachment L-07 | |
| Material Costs | $ - 0 |
| Indirect Costs associated with Material | |
| Total Cost | $ - 0 |
CLIN 0004 Test and Specialized Equipment FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
CLIN 0005 Phase-Out
Phase-Out price proposed shall be consistent with Phase-Out Plan and the requirements under SOW 3.5
| Unit of Issue | Quantity | Total | |
| Phase-Out | Months | 3 | $ - 0 |
CLIN 0005 Phase-Out FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
CLIN 0007 Material
| Material Acquisition costs proposed shall be consistent with the requirements under SOW 4.1 and Material Acquisition sample in Attachment L-07. Indirect Costs shall be broken out to show application of any applicable rate. The sample material acquisition parts shall be priced using the contractor's FY18 rates. | |
| Sample Material Acquisition Parts - Attachment L-07 | |
| Material Costs | $ - 0 |
| Indirect Costs associated with Material | |
| Total Cost | $ - 0 |
CLIN 0007 Material Acquisition FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
CLIN 0008 Rem-Fab
Remanufacture and Fabrication costs proposed shall be consistent with the requirements under SOW 4.2 and the Remanufacture and Fabrication Sample in Attachment L-07. If using a subcontractor, tailor the format below to include subcontractor costs and overheads proposed. The remanufacture/fabrication parts samplese shall be priced using the contractor's FY19 rates.
| Sample Remanufacture/Fabrication Parts - Attachment L-07 | |||
| Labor | Hours | Rate | Total |
| Labor Cat 1 | |||
| Labor Cat 2 | |||
| Labor Cat 3 | |||
| Labor Cat 4 | |||
| Overhead % | |||
| Fringe % | |||
| G&A % | |||
| SubTotal Costs | $ - 0 | ||
| Fee % | |||
| SubTotal | $ - 0 |
| Material |
| Transportation |
| Total Price | $ - 0 |
| Note: All categories above the SubTotal Costs are tailorable to contractor's standard mark-ups |
CLIN 0008 Remanufacture / Fabrication FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
CLIN 0009 Support
Engineering and Technical Support costs proposed shall be consistent with the requirements under SOW 4.3 and the Sample Engineering Tasks in Attachment L-06. If using a subcontractor, tailor the format below to include subcontractor costs and overheads proposed. The sample engineering tasks shall be priced using the contractor's FY20 rates.
| Sample Engineering Tasks - Attachment L-06 | |||
| Labor | Hours | Rate | Total |
| Labor Cat 1 | |||
| Labor Cat 2 | |||
| Labor Cat 3 | |||
| Labor Cat 4 | |||
| Overhead % | |||
| Fringe % | |||
| G&A % | |||
| SubTotal Costs | $ - 0 | ||
| Fee % | |||
| SubTotal | $ - 0 |
Travel
| Total Price | $ - 0 |
| Note: All categories above the SubTotal Costs are tailorable to contractor's standard mark-ups |
CLIN 0009 Engineering Technical Support FA2521-13-R-0008 Attachment 11 TEP Worksheet
Page &P of &N
CLIN 0010 Pre-Overhaul Survey Pre-Overhaul Survey price proposed shall be consistent with the requirements under SOW 4.4.1. The price proposed as a part of the this attachment must be consistent with the price proposed in Attachment 5, Contract Funding Worksheet. The pre-overhaul survey samples shall be priced using the contractor's FY21 rates.
| # of Units | Unit of Issue | Total | |
| White Sands Missile Range | 1 | Each | $ - 0 |
| United Kingdom | 1 | Each | $ - 0 |
| $ - 0 |
CLIN 0010 Pre-Overhaul Survey FA2521-13-R-0008 Attachment 11 TEP Worksheet
Page &P of &N
CLIN 0011 Field Overhauls
Field overhaul price proposed shall be consistent with work specification provided in Attachment L-04 and the requirements under SOW 4.4.2. The overhaul samples shall be priced using the contractor's FY21 rates.
| # of Units | Unit of Issue | Total | |
| WSMR FPS-16 Radar | 1 | Each | $ - 0 |
| UK MPS-39 MOTR Radar | 1 | Each | $ - 0 |
| $ - 0 | |||
| WSMR = White Sands Missile Range | |||
| UK = United Kingdom |
CLIN 0011 Field Overhauls FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
CLIN 0012&13 System Mods
System modification price proposed shall be consistent with sample task provided in Attachment L-05 and the requirements under SOW 4.5. The sample system modification shall be priced using the contractor's FY21 rates.
| # of Units | Unit of Issue | Total | |
| Sample Remote Control System Modification (Attachment L-05) | 1 | Each | $ - 0 |
CLIN 0012 and 0013 System Modifications FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
CLIN 0014 Transportation
Transportation costs proposed shall be consistent with the requirements under SOW 4.6 and the Transportation sample in Attachment L-07. Indirect Costs shall be broken out to show application of any applicable rate. The transportation sample shall be priced using the contractor's FY18 rates.
| Transportation Sample - Attachment L-07 | |
| Transportation Costs | $ - 0 |
| Indirect Costs associated with Transportation | |
| Total Cost | $ - 0 |
CLIN 0014 Transportation FA2521-13-R-0008 Attachment L-11 TEP Worksheet
Page &P of &N
File details come from the government source that posted it. Updated .