N3 Bldg 3000 Phase 6 Shop Drawings.pdf

PDF 22 MB Posted

Attached to
Amendment 3 - Cheyenne Mountain SFS Upgrade EST-3 Fire Alarm System to EST-4
Solicitation number
FA251726A007
Issued by

About this file

This document is a Mass Notification Upgrade specification for SAXC 14-1006 at Building 3000, Node 3, Cheyenne Mountain Air Force Station, Colorado. The project encompasses the design and installation of a comprehensive fire alarm and mass notification system for the facility.

The scope of work includes upgrading the fire alarm/mass notification system operational matrix for Building 3000, with detailed technical specifications covering BPS (Building Power Supply) battery calculations for multiple rooms (3163B, 3207, 3303, 3353), voltage drop calculations, AMP intelligibility test forms, SLC (Signaling Line Circuit) loop device address lists for multiple nodes and building sections, fire alarm panel hardware and operator layer configurations, and complete electrical wiring diagrams showing device identifiers, wire schedules, and Class "A" wiring methodologies. The project involves the integration of multiple fire alarm control panels, battery backup power systems, initiating devices, notification appliances, and addressable device modules distributed throughout the building. Technical drawings include floor plans showing acoustically distinguishable spaces, typical equipment mounting elevations, correct wiring methods, and detailed sections for console cabinet dimensions, sync signal module wiring, single input monitor module wiring, ceiling strobe wiring, and wall-mounted speaker sound dispersion patterns. The specification emphasizes proper power supply calculations, voltage drop analysis, intelligibility testing baselines, and compliance with fire alarm system operational standards for reliable mass notification capability across all building zones.

View the file

Other files

File Type Posted
Amendment 3 - FA251726QA007.pdf PDF
N2 Bldg 2000 Phase 6 Drawing FA.pdf PDF
N6 Bldg 6000 Phase 6 Shop Drawings FA.pdf PDF
CMAFS 12108 N13 Final As-Builts.pdf PDF
CMAFS Main Tunnel FA As-Builts.pdf PDF
CMAFS B15 N18 Phase 6 Shop Drawings FA.PDF PDF
RFI Fire Panel System Upgrade - Answers.xlsx XLSX spreadsheet
CMAFS 1000 N1 Final As-Builts.pdf PDF
N9 Bldg 9000 Phase 6 Drawings FA.pdf PDF
CMAFS B8000 N8 Final As-Builts.pdf PDF
N19 Main Tunnel Phase 6 Drawings.pdf PDF
CMAFS 2000 N2 Final As-Builts.pdf PDF
CMAFS 12132 N14 Final As-Builts.pdf PDF
N10 Bldg 10000 Phase 6 Shop Drawings FA.pdf PDF
CMAFS Inter Tunnel FA As-Builts.pdf PDF
CMAFS 12104 N12 Final As-Builts.pdf PDF
N16 - Bldg 100 Phase 6 FA.pdf PDF
CMAFS B315 N22 Phase 6 Shop Drawings FA.pdf PDF
CMAFS B315 AFTAC FA As-Builts.pdf PDF
CMAFS B309 Em Services FA As-Builts.pdf PDF
Fire Panel Specifications.xlsx XLSX spreadsheet
CMAFS 3000 N3 Final As-Builts.pdf PDF
CMAFS 9000 N9 Final As-Builts.pdf PDF
Solicitation FA251726QA007 - Amendment 2.pdf PDF
Solicitation FA251726QA007 - Amendment 1.pdf PDF
Solicitation - FA251726QA007 Amendment 1.pdf PDF
Attachment 2 SOW Upgrade EST 3 Fire Alarm System to EST 4.pdf PDF
Attachment 3 Past Performance Questionnaire.docx DOCX document
Solicitation Combo - FA251726QA007.pdf PDF
Attachment 4 Preliminary Project Schedule.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .