CMAFS 9000 N9 Final As-Builts.pdf
PDF 1 MB Posted
- Solicitation number
- FA251726A007
About this file
This is a Fire Alarm System Plan for Building 9000, Node 9, prepared for Cheyenne Mountain Air Force Station. The document is an architectural/engineering drawing set that provides detailed specifications and layout for the installation of a fire alarm system in a non-standard Air Force facility.
The plan includes comprehensive system notes, wiring diagrams, and device placement schematics across multiple pages. Key components shown include fire alarm control panels, notification appliances, manual pull stations, and detector placement throughout the building. The drawing set was prepared by BW Systems under contract with SB Construction, with design coordination by Cheyenne Mountain A.F.S. The document includes standard architectural notation, equipment schedules, and installation details typical of federal facility construction documentation. No specific response dates, pricing information, set-asides, or contract vehicles are referenced in this document, as it functions as a technical specification and design reference rather than a solicitation or contract award document.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .