Fire Panel Specifications.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Amendment 3 - Cheyenne Mountain SFS Upgrade EST-3 Fire Alarm System to EST-4
Solicitation number
FA251726A007
Issued by

About this file

This file is a fire alarm system panel specifications spreadsheet for Cheyenne Mountain Space Force Station detailing the technical configuration of 25 fire alarm control panels across multiple buildings. The specifications document the physical location, cabinet size, and component requirements for each panel, including power supplies (3-PPS/M or 3-PPS/M variants), loop cards (3-SSDC1), and various specialized modules such as battery chargers (3-BBC/M), addressable modules (3-ZA95A and 3-ZA40A), communication modules (CT and CR modules), annunciator modules (UM modules and SIGA-MCCT2A), and notification devices (SIGA MAB 12-12 switches). Each panel is assigned to specific buildings (numbered B101 through B12099) with panel cabinet sizes of either Cabinet 14 or Cabinet 21, and the spreadsheet tracks the exact quantities of each component required per panel.

The specifications indicate that all 25 panels require mass notification and annunciator capabilities, with most panels equipped with switches located at building entrances and hallways across multiple floors. The document serves as a bill of materials and technical baseline for the EST-3 to EST-4 fire alarm system upgrade at Peterson Space Force Base's Cheyenne Mountain facility, as referenced in solicitation FA251726A007. This spreadsheet would enable vendors to provide accurate pricing, procurement timelines, and installation planning for the complete system upgrade across all specified building locations.

View the file

Other files

File Type Posted
Amendment 3 - FA251726QA007.pdf PDF
N2 Bldg 2000 Phase 6 Drawing FA.pdf PDF
N6 Bldg 6000 Phase 6 Shop Drawings FA.pdf PDF
CMAFS 12108 N13 Final As-Builts.pdf PDF
CMAFS Main Tunnel FA As-Builts.pdf PDF
CMAFS B15 N18 Phase 6 Shop Drawings FA.PDF PDF
RFI Fire Panel System Upgrade - Answers.xlsx XLSX spreadsheet
CMAFS 1000 N1 Final As-Builts.pdf PDF
N9 Bldg 9000 Phase 6 Drawings FA.pdf PDF
CMAFS B8000 N8 Final As-Builts.pdf PDF
N19 Main Tunnel Phase 6 Drawings.pdf PDF
N3 Bldg 3000 Phase 6 Shop Drawings.pdf PDF
CMAFS 2000 N2 Final As-Builts.pdf PDF
CMAFS 12132 N14 Final As-Builts.pdf PDF
N10 Bldg 10000 Phase 6 Shop Drawings FA.pdf PDF
CMAFS Inter Tunnel FA As-Builts.pdf PDF
CMAFS 12104 N12 Final As-Builts.pdf PDF
N16 - Bldg 100 Phase 6 FA.pdf PDF
CMAFS B315 N22 Phase 6 Shop Drawings FA.pdf PDF
CMAFS B315 AFTAC FA As-Builts.pdf PDF
CMAFS B309 Em Services FA As-Builts.pdf PDF
CMAFS 3000 N3 Final As-Builts.pdf PDF
CMAFS 9000 N9 Final As-Builts.pdf PDF
Solicitation FA251726QA007 - Amendment 2.pdf PDF
Solicitation FA251726QA007 - Amendment 1.pdf PDF
Solicitation - FA251726QA007 Amendment 1.pdf PDF
Attachment 2 SOW Upgrade EST 3 Fire Alarm System to EST 4.pdf PDF
Attachment 3 Past Performance Questionnaire.docx DOCX document
Solicitation Combo - FA251726QA007.pdf PDF
Attachment 4 Preliminary Project Schedule.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BLDGPANEL LOCATIONPANEL SIZEPOWER SUPPLIESLOOP CARDS3-BBC/M3-BPS/M3-ZA95A3-ZA40ACT MODULECR2CR1CR MOUDLECT2CT1UM MODULECC2A MoudleSIGA-MCCT2ASIGA MAB12-12 SWITCHESLOCANNUNCIATORMASSNOTIFICATIONASUUIO6 Motherboard
101 CE BuildingMain mechanical roomCab 213X 3-PPS/M3X 3-SSDC11136100022X 1 in 1st and 1 in 2nd floor2X 1 in 1st and 1 in 2nd floorYY
B15 Visitor CenterMechanical room inside the buildingCab 212x 3- PPS/M3X 3-SSDC1136100011 at the main enterance1 at the main enteranceYY
B326Inside building by main enteranceCab 142x 3- PPS/M1X 3-SSDC1136102421 at the main enterance1 at the main enteranceYYUIO6 Motherboard
B309Main mechanical roomCab 212x 3- PPS/M1X 3-SSDC1200000012X one at each enterance2X one at each enteranceYY
B322Main EnteranceCab 142x 3- PPS/M1X 3-SSDC11440000100yY
B300Inside building in an office areaCab 213X 3-PPS/M4X 3-SSDC14000000300yY
B315Main mechanical roomCab 212x 3- PPS/M1X 3-SSDC1224120021 at the main enterance1 at the main enteranceYY
B1000Mechanical room 11ECab 213X 3-PPS/M4X 3-SSDC140815022X-1FL HALL, 1X-2FL HALL, 2X-3FL HALL1X-RM1108 (recessed), 1X-2FR HALLYY
B2000Mechanical room 21WCab 211x 3-pps/M3X 3-SSDC11383121X-2FL HALLYY
B3000Mechanical room 31Cab 211x 3-pps/M3X 3-SSDC11391522X-2FL HALL, 2X-3FL HALL1X-1FL HALLYY
B4000Mechanical room 42Cab 211x 3-pps/M3X 3-SSDC113102121X-1FL HALL, 1X-3FL HALL1X-1FL HALLYY
B5000Mechanical room 52Cab 211x 3-pps/M3X 3-SSDC1139152YY
B6000Mechanical room 61Cab 211x 3-pps/M3X 3-SSDC1133621X-1FL HALLYY
B7000Mechanical room 72Cab 211x 3-pps/M3X 3-SSDC1133211121X-1F HALL, 1X-2FL HALL, 1X-3FL HALL1X-1FL HALLYY
B8000Mechanical room 82Cab 211x 3-pps/M3X 3-SSDC1134110121X-1FL HALL, 1X-2FL HALL, 1X-3FL HALL1X-1FL HALLYY
B9000Mechanical room 91Cab 211x 3-pps/M3X 3-SSDC113103321X-1FL HALLYY
B10000Mechanical room 10-2Cab 211x 3-pps/M3X 3-SSDC11364121X-1FL HALL, 1X-2FL HALL1X-1FL HALLYY
B11000Mechanical room 111Cab 211x 3-pps/M3X 3-SSDC1131041121X-1FL HALLYY
B12104By tank 28Cab 211x 3-pps/M3X 3-SSDC11222YY
B12108West HallwayCab 211x 3-pps/M3X 3-SSDC1111814321X-1FL HALLYY
B12000PC-14Cab 211X 3-PPS/M1X 3-SSDC121121X-1FL HALLYY
B12099Bus stop / Main tunnelCab 211x 3-pps/M2X 3-SSDC113252YY
B100Room 112ACab 211x 3-pps/M2X 3-SSDC121216621X-1FL HALL1X-1FL HALLYY

File details come from the government source that posted it. Updated .