CMAFS B15 N18 Phase 6 Shop Drawings FA.PDF

PDF 5 MB Posted

Attached to
Amendment 3 - Cheyenne Mountain SFS Upgrade EST-3 Fire Alarm System to EST-4
Solicitation number
FA251726A007
Issued by

About this file

This document is a Mass Notification Upgrade specification for SAXC 14-1006 at Cheyenne Mountain Air Force Station, Colorado, specifically addressing Buildings 15 and 20 (NODE 18). The project involves the installation and integration of a comprehensive fire alarm and mass notification system designed to provide emergency communications and alerting capabilities across the designated facilities.

The system design includes multiple integrated components: fire alarm control panels with three distinct layers (chassis, hardware, and operator interface), Genesis ceiling and wall-mounted speakers with specified sound dispersion patterns, strobe lighting for visual notification, a local operator console cabinet, SLC (Signaling Line Circuit) loop infrastructure with detailed address lists and loading calculations, backup battery systems with 24-volt specifications, and BPS (Battery Power Supply) units with comprehensive power calculations. The specification provides detailed technical drawings showing equipment mounting elevations, wiring methods, panel configurations, speaker placement and coverage areas, battery connection details, and full system integration schematics. Supporting calculations include fire alarm control panel battery sizing (RM-104), BPS power supply battery calculations (RM-154), power supply voltage drop analysis, speaker circuit calculations, and amplifier loading specifications. The design incorporates Class A wiring methodology for system redundancy and reliability. The document establishes specific SLC loop addressing, device identifiers, and wire scheduling conventions to ensure proper system configuration and interoperability of all components throughout the mass notification network.

View the file

Other files

File Type Posted
Amendment 3 - FA251726QA007.pdf PDF
N2 Bldg 2000 Phase 6 Drawing FA.pdf PDF
N6 Bldg 6000 Phase 6 Shop Drawings FA.pdf PDF
CMAFS 12108 N13 Final As-Builts.pdf PDF
CMAFS Main Tunnel FA As-Builts.pdf PDF
RFI Fire Panel System Upgrade - Answers.xlsx XLSX spreadsheet
CMAFS 1000 N1 Final As-Builts.pdf PDF
N9 Bldg 9000 Phase 6 Drawings FA.pdf PDF
CMAFS B8000 N8 Final As-Builts.pdf PDF
N19 Main Tunnel Phase 6 Drawings.pdf PDF
N3 Bldg 3000 Phase 6 Shop Drawings.pdf PDF
CMAFS 2000 N2 Final As-Builts.pdf PDF
CMAFS 12132 N14 Final As-Builts.pdf PDF
N10 Bldg 10000 Phase 6 Shop Drawings FA.pdf PDF
CMAFS Inter Tunnel FA As-Builts.pdf PDF
CMAFS 12104 N12 Final As-Builts.pdf PDF
N16 - Bldg 100 Phase 6 FA.pdf PDF
CMAFS B315 N22 Phase 6 Shop Drawings FA.pdf PDF
CMAFS B315 AFTAC FA As-Builts.pdf PDF
CMAFS B309 Em Services FA As-Builts.pdf PDF
Fire Panel Specifications.xlsx XLSX spreadsheet
CMAFS 3000 N3 Final As-Builts.pdf PDF
CMAFS 9000 N9 Final As-Builts.pdf PDF
Solicitation FA251726QA007 - Amendment 2.pdf PDF
Solicitation FA251726QA007 - Amendment 1.pdf PDF
Solicitation - FA251726QA007 Amendment 1.pdf PDF
Attachment 2 SOW Upgrade EST 3 Fire Alarm System to EST 4.pdf PDF
Attachment 3 Past Performance Questionnaire.docx DOCX document
Solicitation Combo - FA251726QA007.pdf PDF
Attachment 4 Preliminary Project Schedule.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .