N19 Main Tunnel Phase 6 Drawings.pdf

PDF 16 MB Posted

Attached to
Amendment 3 - Cheyenne Mountain SFS Upgrade EST-3 Fire Alarm System to EST-4
Solicitation number
FA251726A007
Issued by

About this file

This document is a Mass Notification Upgrade technical specification for SAXC 14-1006 at Cheyenne Mountain Air Force Station, Colorado, focusing on the Main Tunnels Node 19 fire alarm and mass notification system. The project scope encompasses the design, installation, testing, and commissioning of a comprehensive fire alarm and mass notification system within the main tunnel structure, including all necessary equipment, wiring, control panels, batteries, and associated infrastructure to replace or upgrade existing notification capabilities.

The technical specifications detail extensive system requirements including fire alarm/mass notification operational matrices for Node 19; intelligibility and auditability testing worksheets; detailed electrical load calculations for amplifiers and speaker circuits across multiple bus shelter power supplies; battery and voltage drop calculations for both bus shelters and access tunnels; and comprehensive wiring diagrams and schedules for the central access tunnel and south access tunnel segments. The system incorporates multiple signal modules (SKc2A, SKc-CTS, SKc-AC1), series battery connection details for 24-volt systems, integrity 405 strobe wiring configurations, and class "A" wiring methodology throughout. Technical drawings specify device identifiers, correct wiring methods, typical equipment mounting elevations, fire alarm panel chassis and hardware layers, and operational layer configurations. The documentation includes detailed address lists for SLC Loop 1 and SLC Loop 2 devices, SLC capacity calculations, and voltage/battery calculations for multiple bus power supplies (BPS #1 through #6) and auxiliary power supplies (APS #3) serving south tunnel segments.

View the file

Other files

File Type Posted
Amendment 3 - FA251726QA007.pdf PDF
CMAFS 1000 N1 Final As-Builts.pdf PDF
N9 Bldg 9000 Phase 6 Drawings FA.pdf PDF
CMAFS B8000 N8 Final As-Builts.pdf PDF
N3 Bldg 3000 Phase 6 Shop Drawings.pdf PDF
CMAFS 2000 N2 Final As-Builts.pdf PDF
CMAFS 12132 N14 Final As-Builts.pdf PDF
N10 Bldg 10000 Phase 6 Shop Drawings FA.pdf PDF
CMAFS Inter Tunnel FA As-Builts.pdf PDF
CMAFS 12104 N12 Final As-Builts.pdf PDF
N16 - Bldg 100 Phase 6 FA.pdf PDF
CMAFS B315 N22 Phase 6 Shop Drawings FA.pdf PDF
CMAFS B315 AFTAC FA As-Builts.pdf PDF
CMAFS B309 Em Services FA As-Builts.pdf PDF
Fire Panel Specifications.xlsx XLSX spreadsheet
CMAFS 3000 N3 Final As-Builts.pdf PDF
CMAFS 9000 N9 Final As-Builts.pdf PDF
N2 Bldg 2000 Phase 6 Drawing FA.pdf PDF
N6 Bldg 6000 Phase 6 Shop Drawings FA.pdf PDF
CMAFS 12108 N13 Final As-Builts.pdf PDF
CMAFS Main Tunnel FA As-Builts.pdf PDF
CMAFS B15 N18 Phase 6 Shop Drawings FA.PDF PDF
RFI Fire Panel System Upgrade - Answers.xlsx XLSX spreadsheet
Solicitation FA251726QA007 - Amendment 2.pdf PDF
Solicitation FA251726QA007 - Amendment 1.pdf PDF
Solicitation - FA251726QA007 Amendment 1.pdf PDF
Attachment 2 SOW Upgrade EST 3 Fire Alarm System to EST 4.pdf PDF
Attachment 3 Past Performance Questionnaire.docx DOCX document
Solicitation Combo - FA251726QA007.pdf PDF
Attachment 4 Preliminary Project Schedule.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .