Attachment 4 Preliminary Project Schedule.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- FA251726A007
About this file
This is a Preliminary Project Schedule attachment for the Cheyenne Mountain Fire Panel Upgrade project under solicitation FA251726QA007. The schedule outlines the major deliverables and work phases required for upgrading the EST-3 Fire Alarm System to EST-4 at Cheyenne Mountain Space Force Station, Colorado. The project is structured in five primary phases: System Design and Engineering (including site survey and submittal package), Equipment Procurement (covering EST-4 FACPs, interface modules, wiring and cabling, batteries, and enclosures/mounting hardware), Installation and Integration (with pre-installation meeting), Training and Documentation (system documentation and training materials), and Project Closeout (final inspection and project completion report).
The schedule template includes fields for vendor name and calendar days required for each deliverable, allowing vendors to provide specific timelines for completion of work phases. This preliminary schedule serves as the baseline framework for project planning and tracking, enabling Peterson Space Force Base's 21st Civil Engineering Squadron to establish contractual milestones and performance expectations for the fire alarm system upgrade at this critical Space Force facility.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Porject Title: Chyenne Mountain Fire Panel Upgrade EST-4 | |
| Solicitation Number: FA251726QA007 | |
| Vendor Name: | |
| Deliverable | Calendar Days |
| 4.1 SYSTEM DESIGN AND ENGINEERING | |
| Site Survey | |
| Submittal Package | |
| 4.2 EQUIPMENT PROCUREMENT | |
| 4.2.1 EST-4 FACPs | |
| 4.2.2 Interface Modules (if required) | |
| 4.2.3 Wiring and Cabling: | |
| 4.2.4 Batteries | |
| 4.2.5 Enclosures and Mounting Hardware | |
| 4.3 INSTALLATION AND INTEGRATION | |
| Pre-Installation Meeting | |
| 4.4 TRAINING AND DOCUMENTATION | |
| System Documentation | |
| Training Materials | |
| 4.5 PROJECT CLOSEOUT | |
| Final Inspection | |
| Project Completion Report |