About this file

FA2517-05-D-9002 Task Order 0026 Chief Information Officer (CIO) Support

View the file

Other files for this federal contract opportunity

Other files attached to Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command, newest first.
File Type Posted
Amendment 10 SF30 Summary of Changes.doc DOC document
Amendment 10 CSMC RFP 11 Dec 09.docx DOCX document
Amendment 9 CSMC RFP 11 Dec 09.docx DOCX document
Q A 13 Oct 09.docx DOCX document
Questions Responses - Amendment 5.doc DOC document
Q A 21 Sep 09.doc DOC document
MILSATCOM CDRLs 04 05 9 Sep 09.rtf RTF text file
MILSATCOM CDRLs 07 25 9 Sep 09.rtf RTF text file
Attachment L-3 MWMD PWS 9 Sep 09.doc DOC document
CDRLS Master List ADMIN 1 and 2.rtf RTF text file
CDRLS Master List MISC 32 33.rtf RTF text file
MILSATCOM CDRLs 02 03 9 Sep 09.rtf RTF text file
Revised Relevancy and Cost Price Sections.docx DOCX document
Acronyms _ 27 May 09.doc DOC document
StaffTable.xls XLS spreadsheet
MWMD 29 34 31 May 09.pdf PDF
FINAL Draft CSMC RFP 25 Jun 09.doc DOC document
MWMD 2 4 31 May 09.pdf PDF
CSMC Perf Plan II 28 May 09.doc DOC document
CSMC CDRLS 1 thru 4 3 June 09.pdf PDF
9003-0041.doc DOC document
9002-0027.doc DOC document
BRAC PWS.doc DOC document
PWS for FedBizOpps.doc DOC document
PWS for FedBizOpps.doc DOC document
PWS for Mkt Research.doc DOC document
Market Research Questions.doc DOC document
TTEE 15 Sep 08.docx DOCX document
Market Research Questions1.doc DOC document
Market Research Questions.doc DOC document
9003-0033.doc DOC document
9003-0026.doc DOC document
9003-0003.doc DOC document
9003-0016.doc DOC document
9002-0001.doc DOC document
9002-0015.doc DOC document
9002-0022.doc DOC document
9002-0019.doc DOC document
9002-0011.DOC DOC document
9001-0027.doc DOC document
9001-0005.doc DOC document
9001-0006.doc DOC document
9001-0031.DOC DOC document
9001-0003.doc DOC document
9000-0016.doc DOC document
9000-0023.doc DOC document
9000-0005.doc DOC document
FBO Clarification.doc DOC document
Directive08-01.pdf PDF
1_MarketResearchQuestions.doc DOC document
Show all 50

Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HQ AFSPC

CONTRACT INFORMATION

Contract Number
FA2517-05-D-9002 Task Order 0026
Requiring Activity
Air Force Space Command (AFSPC)

Chief Information Officer (CIO) Support

FOR

Headquarters (HQ) AFSPC / A6

Contract Type
Cost Plus Fixed Fee (CPFF)
Incumbent Name & Address
bd Systems

360 Command View Colorado Springs, CO 80915

Period of Performance
11 Aug 08 – 5 Dec 09

(1 Base Yr and 4 Mo Opt)

Total Contract Dollar Amount
$657,511

STATEMENT OF WORK

FOR

Air Force Space Command (AFSPC) Chief Information Officer (CIO) Support

FOR

Headquarters (HQ) AFSPC / A6

RFTOP: A6-0174

4 June 2008

1.0 DESCRIPTION OF SERVICES: The purpose of this contract is to provide support to the AFSPC A6 in the areas of CIO duties, Portfolio Management (PfM), and Air Force Smart Operations 21 (AFSO 21).

1.1 ORGANIZATION BEING SUPPORTED: HQ AFSPC/A6

150 Vandenberg St, Suite 1105

Peterson AFB, CO 80914

1.1.1 MISSION: Provide solutions, products, services and methodologies to defend national security space information and systems.

1.2 OVERVIEW OF SERVICES REQUIRED

Purpose of this task order is to provide HQ AFSPC CIO support required to fulfill the vision and execution processes of integrating AFSPC Command and Control, Communications and Computers (C4) capabilities with the Cyberspace domain. This level of support is required for effective execution of Department of Defense (DoD) and Federal mandates such as Clinger-Cohen Act compliance, Federal Information Management Security Act compliance (FISMA), Information Technology (IT) PfM (DODD 8115.01), Air Force Instruction 33-129, AFI 33-202--V1, Title 42, USC, Section 508, and National Military Strategy for Cyberspace Operations (DODD 8000.1, Management of DoD Information Resources and IT). Support also encompasses administrative management of the AFSPC CIO Dashboard and Scorecard, facilitating CIO policy & governance, AFSPC/A6 task analysis and CIO outreach across the command. Additionally, this task order provides HQ AFSPC CIO support for AFSO 21 program execution as well as to provide support for AFSPC CIO Enterprise Architecture and Information Assurance.

1.3 SPECIFIC REQUIREMENTS

1.3.1 Requirement 1: CIO Consultation and Support

1.3.1.1 To assist the AFSPC CIO in ensuring compliance and dissemination of Federal, DoD, and AF policy and governance across AFSPC, the contractor shall evaluate IT initiatives from Headquarters Air Force down to squadron commanders. Assist in the engineering analysis of operation, administrative and IT technical documents related to DoD, Federal, and commercial best practices and recommend courses of action to AFSPC CIO. By using the best practices concept, the contractor shall assist the AFSPC CIO and government representatives by providing recommendations, analysis of alternatives, briefings and point papers to enable IT decision-making and information sharing in the following forums; AFSPC A6 CIO integrated process team (IPT), Communications Squadron Commander (CS/CC) collaboration sessions, weekly Architecture and Integration collaboration meetings, bi-annual DoD, Air Force and AFSPC Communications and Information (C&I) Summits.

1.3.1.2 The contractor shall assist the AFSPC CIO with identifying and analyzing DoD, Federal, and commercial best practices in recommending communications and information AFSO 21 initiatives. The contractor shall recommend to the CIO best practices to incorporate into HQ AFSPC processes. The contractor shall gather and prepare data (e.g., PowerPoint slides) used for AFSO 21 planning sessions and events, and provide improvement trend reports and analysis upon event completion.

1.3.1.3 The contractor shall assist the AFSPC CIO with identifying AFSPC A6 specified and implied tasks (task analysis) by reviewing AF- and DoD-level instructions related to the AFSPC and A6 mission. This research will assist the AFSPC CIO in determining what AFSPC IT functions remain within AFSPC control versus transferring to AF Network Operations and, in doing so, support AFSPC CIO AFSO 21 planning sessions and events. The contractor will provide monthly written/verbal updates to the CIO and government representatives on progress and opportunities.

1.3.1.4 The contractor shall evaluate existing AFSPC Architectures and assist the AFSPC CIO with the standardization of Enterprise Architecture processes, Tactics, Techniques and Procedures (TTPs) throughout the AFSPC A6. The contractor shall provide recommendations for process improvements and provide expertise to implement selected recommendation(s).

1.3.2 Requirement 2: AFSPC Dashboard Administration

1.3.2.1 The contractor shall be proficient in the usage and administration of the current version of Microsoft Share Point to aid in the assistance of content managers/administrators and maintainers for the AFSPC Dashboard (e,g., heads-up display for Command, directorate/division-level programs, financial, and IT initiative status/information). The contractor shall assist AFSPC government representatives and coordinate with Enterprise Information Management (EIM) professionals to add new users/groups/processes to existing Dashboard. The contractor shall incorporate EIM practices into AFSPC Dashboard training, usage, and management. The contractor shall also ensure the AFSPC Dashboard adheres to IT-related DoD, Federal guidance and commercial best practices. The contractor shall provide Dashboard Training for up to 20 people approximately bi-monthly at contractor furnished facility. Training will include; how to input data, how to read and report on the data, and how to properly manipulate the data.

1.3.2.2 The contractor shall create a means to interface other DoD and/or AF-approved enterprise management tools with the AFSPC Dashboard.

1.3.3 Requirement 3: IT Portfolio Management (PfM)

1.3.3.1 The contractor shall assist the government representative in the standup and maturation of IT PfM governance. This includes recommendations to government representatives for the development of processes and procedures for implementation across AFSPC from research of DoD developing concepts, associated processes and policies; Federal, and commercial best practices. Assist AFSPC CIO by reviewing AFSPC mission systems for Clinger-Cohen Act, and related IT PfM items for compliance to meet Federal mandates and reporting requirements.

1.4 Additional Deliverables: CDRL 0030 Contractor’s Progress, Status and Management Report

2.0 SERVICES SUMMARY:

Performance Objective
SOW Para.
Performance Threshold
Deliverables are completed in an accurate and timely manner
ALL
No more than one (1) late document per month and no more than five (5) days late. Nor more than one (1) set of corrections or edits and all corrections must be accomplished within five (5) working days.
All requirements of the Task Order are met
ALL
Contractor receives no more than 2 formal, validated customer complaints/contract discrepancy reports per year. The contractor successfully resolves customer complaints within 5 calendar days of receipt, 100% of the time.

3.0 Government Furnished Property and services:

3.1 GOVERNMENT FURNISHED PROPERTY (GFP): NONE

3.2 GOVERNMENT FURNISHED RESOURCES:

3.2.1 FACILITIES, SUPPLIES, AND SERVICES: AFSPC/A6 will provide up to three work stations in the Hartinger building on Peterson AFB. Work stations include desk space, chairs, computers connected to 21 NET, Secret Internet Protocol Router network (SIPRNET) access, use of telephones, copier and fax machines. SIPRNET is not required at the contractors’ facility.

3.2.2 GOVERNMENT FURNISHED INFORMATION: Personnel will be available for technical exchanges with the Contractor and will provide technical input, answer questions, review and accept completed work, and provide feedback regarding Contractor efforts. The Quality Assurance Evaluator (QAE) is the primary source of technical guidance for this SOW.

3.3 MATERIALS AND OTHER DIRECT COSTS (ODCs): NONE

4.0 GENERAL INFORMATION:

4.1 SECURITY: Provisions outlined in the basic award DD 254 apply to this task order. Activities and products associated with this task order shall range from Unclassified to Secret.

4.2 ACCESS TO GOVERNMENT PROPERTY AND FACILITIES: The contractor will be allowed unescorted access to Government buildings on Peterson AFB and other sites consistent with Task Order requirements. Access to Government facilities, documents, and systems shall be in accordance with the attached DD 254.

4.3 SERVICES DURING CRISIS: The performance of these services is non-mission essential during times of crisis. Should a crisis be declared, the Contracting Officer or their representative will verbally advise the contractor if temporary suspension of work is required, followed by a written notification. A representative of the contracting officer will further notify the contractor verbally when the crisis has ended with written notification to follow. Any price changes resulting from this crisis will be negotiated in accordance with FAR clauses for “Changes”.

4.4 TRAVEL: Travel needs are derived by the QAE. Approximately 14 trips are estimated to support Sow Requirement 1.3.1 and 1.3.3.

Purpose of Trip
Destination
Estimated Number of Trips
Estimated Duration
CIO outreach
SAF/XC
2
3 Days
CIO outreach
Vandenburg AFB
2
3 Days
CIO outreach
Malmstrom AFB
1
3 Days
CIO outreach
Patrick AFB
1
3 Days
CIO outreach
F.E Warren AFB
2
2 Days
CIO outreach
Buckley AFB
2
2 Days
CIO outreach
90 SW, Minot AFB
1
2 Days
CIO outreach
Cyber Command
2
3 Days
CIO outreach
EIM Conference
1
5 Days

4.4.1 Any travel required to fulfill these required tasks in this SOW shall be approved by the QAE prior to actual travel and reimbursed IAW FAR 31.205-46. Local travel is defined as within 50 miles of Peterson AFB. The Contractor shall fund all local travel.

4.5 PRODUCT OWNERSHIP: All products produced by the Contractor in the performance of this SOW are the property of the government.

4.6 PROPRIETARY DATA: The Contractor shall request government approval prior to the use of any proprietary data or software tools to fulfill the requirements of this SOW.

File details come from the government source that posted it. Updated .