RFP Attachment V.pdf

PDF 9 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) - Robins AFB
Solicitation number
F3Q2AD0207A002
Issued by

About this file

RFP Attachment V - WD 80

View the file

Other files

File Type Posted
Sign in Sheet.pdf PDF
RFP Attachment XI.pdf PDF
Pre-Proposal Conference - Minutes.docx DOCX document
FA8501-10-R-0016-0002.pdf PDF
Pre-Proposal Conference Instructions.pdf PDF
FA8501-10-R-0016-0001.pdf PDF
RFP Attachment XI.pdf PDF
RFP Attachment I.pdf PDF
RFP Attachment VIII.xlsx XLSX spreadsheet
RFP Attachment VI.pdf PDF
RFP Attachment XVI - Instructions for FACTS Sheets.docx DOCX document
http //www.rsmeans.com COM file
RFP Attachment IX.xlsx XLSX spreadsheet
RFP Attachment VII.xlsx XLSX spreadsheet
Client Authorization Letter - RFP Attchmt X.docx DOCX document
RFP Attachment II.pdf PDF
RFP Attachment IV.pdf PDF
RFP Attachment XII.pdf PDF
RFP Attachment XIII.pdf PDF
RFP Attachment III.pdf PDF
RFP Attachment XIV.pdf PDF
FA8501-10-R-0016.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: GA100080 03/12/2010 GA80

Superseded General Decision Number: GA20080080

State: Georgia

Construction Types: Heavy Dredging

Counties: Georgia Statewide.

HOPPER DREDGE CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010

SUGA1993-002 05/24/1993

Rates Fringes

Self-Propelled Hopper Dredge, Drag Tender............$ 8.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

11/3/2010http://www.wdol.gov/wdol/scafiles/davisbacon/GA80.dvb and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION