RFP Attachment III - WD 143
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign in Sheet.pdf | ||
| RFP Attachment XI.pdf | ||
| Pre-Proposal Conference - Minutes.docx | DOCX document | |
| FA8501-10-R-0016-0002.pdf | ||
| Pre-Proposal Conference Instructions.pdf | ||
| FA8501-10-R-0016-0001.pdf | ||
| RFP Attachment XI.pdf | ||
| RFP Attachment I.pdf | ||
| RFP Attachment VIII.xlsx | XLSX spreadsheet | |
| RFP Attachment VI.pdf | ||
| RFP Attachment V.pdf | ||
| RFP Attachment XVI - Instructions for FACTS Sheets.docx | DOCX document | |
| http //www.rsmeans.com | COM file | |
| RFP Attachment IX.xlsx | XLSX spreadsheet | |
| RFP Attachment VII.xlsx | XLSX spreadsheet | |
| Client Authorization Letter - RFP Attchmt X.docx | DOCX document | |
| RFP Attachment II.pdf | ||
| RFP Attachment IV.pdf | ||
| RFP Attachment XII.pdf | ||
| RFP Attachment XIII.pdf | ||
| RFP Attachment XIV.pdf | ||
| FA8501-10-R-0016.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: GA100143 12/03/2010 GA143
Superseded General Decision Number: GA20080143
State: Georgia
Construction Type: Heavy
Counties: Chattahoochee, Crawford, Houston, Marion, Monroe and Muscogee Counties in Georgia.
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 07/09/2010 3 10/01/2010 4 10/22/2010 5 12/03/2010
ELEC0613-010 03/01/2010
Chattahoochee, Marion, and Muscogee Counties
Rates Fringes
ELECTRICIAN......................$ 29.00 8.09
FOOTNOTES: High time on water tanks, steeples, TV or radio towers, smoke stacks & silos, where the electrical work performed extends twenty-five (25) feet above the base of these specified structures: $3.00 per hour additional. Work performed above three hundred (300) feet of the above described structures: $4.00 per hour additional. Work on the above structures above twenty-five (25) feet from a spider or bosun chair: $6.00 per hour additional. Work on bar joists, walk logs, exposed steel & swinging scaffolds when the surface the worker stands or sits on exceeds twenty-five (25) feet above solid floor & the worker is subject to free fall: $1.00 per hour additional. Work of a similar nature above fifty(50) feet: $3.00 per hour additional.
ELEC1316-007 09/01/2009
Crawford, Houston, and Monroe Counties
Rates Fringes
ELECTRICIAN......................$ 21.75 9.35
* ENGI0474-006 07/01/2010
Chattahoochee, Houston and Marion Counties
Rates Fringes
Operating Engineers:
Bulldozer...................$ 21.47 11.60 Forklift, 15 tons and over..$ 23.30 11.60
12/21/2010http://www.wdol.gov/wdol/scafiles/davisbacon/GA143.dvb
Forklift, under 15 tons.....$ 21.47 11.60
ENGI0926-008 07/01/2010
Crawford, Monroe, and Muscogee Counties
Rates Fringes
Operating Engineers:
Bulldozer and Forklift......$ 22.45 11.18
PAIN0193-003 07/01/2010
Rates Fringes
PAINTER: Brush, Roller and Spray............................$ 21.27 7.34
SUGA2008-055 08/06/2008
Rates Fringes
CARPENTER........................$ 13.02 1.49
CEMENT MASON/CONCRETE FINISHER...$ 11.75 1.08
IRONWORKER, REINFORCING..........$ 11.50 2.04
LABORER: Common or General......$ 9.00 0.00
LABORER: Pipelayer..............$ 10.07 0.00
OPERATOR: Backhoe/Excavator.....$ 12.63 0.00
OPERATOR: Crane.................$ 17.05 3.44
OPERATOR: Grader/Blade..........$ 14.16 0.27
OPERATOR: Loader................$ 13.65 1.78
OPERATOR: Piledriver............$ 10.63 0.48
OPERATOR: Trackhoe..............$ 11.00 1.10
OPERATOR: Roller.................$ 9.75 0.19
TRUCK DRIVER.....................$ 9.50 1.05
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION