This is a Request for Information (RFI) issued by the Department of the Air Force 502D Air Base Wing for market research purposes regarding the replacement of a legacy R-22 split HVAC system at Joint Base San Antonio (JBSA) Lackland, Texas. The Government seeks information from interested small businesses capable of providing complete decommissioning, removal, and installation services for a 15-ton direct expansion (DX) split HVAC system in Building 4983. The existing system consists of a Rheem Air-Cooled Condensing Unit (Model RAWE-180CAZ) and RUUD Air Handling Unit (Model RHCE-150ZK), which will be replaced with a new, code-compliant 15-ton system featuring modern Direct Digital Controls (DDC) and BACnet-compatible building automation capabilities. The anticipated award will be Firm Fixed Price (FFP), with the applicable NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) and PSC J041 (Refrigeration and Air Conditioning Equipment Maintenance/Repair). The size standard is $19 million for small business classification purposes.
Responses to this RFI must be submitted no later than Tuesday, May 12, 2026, to both the Contract Specialist (Ulysses Solis, Ulysses.solis@us.af.mil) and Contracting Officer (Emily Rodriguez, emily.rodriguez.8@us.af.mil). Interested firms must complete the questionnaire, provide a capability statement (limited to 5 pages), and address technical questions regarding load calculation methodology, equipment footprint compatibility, ductwork integration, BACnet integration with open systems, commissioning verification protocols, and confirmation of new refrigerant line set installation. This is strictly a sources sought announcement for acquisition planning purposes; no formal quote, evaluation letters, or results notification will be provided to respondents. All proprietary information must be clearly identified for protection from dissemination in Government documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Information_Legacy R22 Split System Replacement.docx | DOCX document | |
| Legacy R22 Split HVAC System PowerPoint.pptx | PPTX presentation | |
| Request for Information_Legacy R22 Split System Replacement.docx | DOCX document | |
| Legacy R22 Split HVAC System PowerPoint.pptx | PPTX presentation | |
| DRAFT Salient Characteristics_15-Ton Commercial DX Split System.docx | DOCX document | |
| DRAFT SOW_ Legacy R22 Split System Replacement B4983.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE 502D AIR BASE WING
JOINT BASE SAN ANTONIO
7 May 2026 TO: 502D Contracting Squadron 1655 Selfridge Rd Joint Base San Antonio (JBSA) Lackland, TX 78236
FROM: Company Name: ______________________________ Cage & UEI Code:____________________________ Address:_____________________________________ Phone No.: __________________________________ Email Address:_______________________________ SUBJECT: Request for Information - Replacement of Legacy R22 Split HVAC System at JBSA Lackland, TX All information provided is STRICTLY VOLUNTARY: The purpose of this notice is to query the market for potential interested, capable, responsible, and qualified small businesses that can provide and perform the stated requirement. The Government is interested in collecting market information in accordance with (IAW) RFO Part 10.
The Government is currently utilizing NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors; PSC: J041 Maint/Repair/Rebuild of Equipment—Refrigeration, Air Conditioning, and Air Circulating Equipment; Size Standard: $19M. The anticipated award is Firm Fixed Price (FFP).
Interested firms are encouraged to complete this Questionnaire, provide capability statement (5-page limitation), and submit any questions/concerns pertaining to this requirement, no later than Tuesday, 12 May 2026. All correspondence shall be sent to both the email addresses below:
· Contract Specialist: Ulysses Solis, email: Ulysses.solis@us.af.mil
· Contracting Officer: Emily Rodriguez, email: emily.rodriguez.8@us.af.mil
DESCRIPTION OF SERVICES:
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to replace the HVAC system in Building 4983 at JBSA Lackland. The 502d Civil Engineer Squadron requires the decommissioning and removal of the existing 15-ton direct expansion (DX) split system. The legacy system operates on phased-out R-22 refrigerant and consists of a Rheem Air-Cooled Condensing Unit (Model No. RAWE-180CAZ, Serial No. 6698F010904536) and a corresponding RUUD Air Handling Unit (Model No. RHCE-150ZK, Serial No. 114G029900259). This project includes the complete installation of a new, fully functional, code-compliant 15-ton HVAC system equipped with modern Direct Digital Controls (DDC) and BACnet-compatible building automation capabilities.
CLIN Structure:
| CLIN NO. |
| DESCRIPTION |
| QUANTITY |
| UNIT OF MEASURE |
| 0001 |
| Replacement of Legacy R22 Split HVAC System IAW Statement of Work |
| 1 |
| JOB |
COMPLETE QUESTIONNAIRE
1. Can your company provide proof of licenses, permits, and/or certifications required by Federal, State, Local laws and safety regulations (NFPA 17/17A/96) to fulfil this requirement? (Yes / No) _______________
2. Is your company a Small Business? (Yes / No) _____________ If a Small Business, please identify your company’s socio-economic concern(s) (Proof Required):
☐8(a) Program ☐HUBZone ☐Service-Disable Veteran-Owned Small Business (SDVOSB) ☐Women-Owned Small Business (WOSB) ☐Small Disadvantage Business (SDB) ☐Small Business
OTHER:
3. Do you offer the items/services using GSA FSS Schedule? (Yes / No)
If yes, provide GSA Contract Expiration Date:
4. Detail the NAICS code your company typically claims for similar items/services, if different than NAICS provided: _____
5. Additional Questions to Consider in Response to this RFI:
Technical Approach & Systems Integration
a) Load Calculation & Sizing: The DRAFT SOW requires the new system to be "sized to meet building load requirements." Please describe your methodology for performing the building load calculation to confirm if the existing 15-ton capacity is accurate or if a different size is optimal for energy efficiency and performance.
Response:
b) Equipment Footprint & Installation: Based on the requirement to install a new, modern system, do you anticipate that the new Air-Cooled Condensing Unit (ACCU) will fit on the existing concrete equipment pad? If modifications are needed, please describe them.
c) Ductwork Integration: The DRAFT SOW requires the removal of "ductwork if determined incompatible." Based on your experience with similar retrofits, what specific conditions would lead you to determine the existing ductwork is incompatible with a new Air Handling Unit (AHU)?
Section 2: Controls & Automation
a) BACnet Integration & Open Systems: The DRAFT SOW requires a BACnet-compatible DDC interface. Please confirm your proposed solution uses a BTL-Certified, native BACnet controller that allows for full integration into a base-wide EMCS without requiring proprietary gateways or brand-specific software licenses for monitoring and control.
b) Commissioning & Verification: The DRAFT SOW requires a commissioning report and performance verification. What key performance indicators (KPIs) and testing methods would you use during commissioning to verify that the new 15-ton system is operating at peak efficiency as a "complete, operational, commissioned HVAC system"?
Section 3: Compliance
a) Refrigerant Line Set: The DRAFT SOW mandates "New refrigerant piping." Please confirm you understand this requirement and that no portion of the legacy line set will be flushed or reused.
This notice is strictly voluntary and is not to be interpreted as a quote in anticipation of a future contract award. If Contractors are able and interested in this requirement, please identify your business entity by completing this notice and return to the above designated Government personnel.
Respondents will not be notified of the results of the information. The Contracting Officer will utilize the information for acquisition planning. All proprietary information not to be disseminated in Government documents must be clearly identified. Since this is a Sources Sought announcement only, no evaluation letters and/or results will be issued to the participants. This market survey is being conducted to determine the applicable planning and acquisition strategy based on responses indicating capability in responding to this requirement.
Attachment List:
1. DRAFT SOW_ Replace Legacy R22 Split System B4983
2. Legacy R22 Split HVAC System PowerPoint image1.jpeg image2.jpeg
File details come from the government source that posted it. Updated .