F292123599_LMBPQA4.pdf
PDF 128 KB Posted
- Solicitation number
- RFP-00040
- Issued by
- Volusia County, Florida
About this file
This document is a set of Questions and Answers #4 related to a Request for Proposal (RFP) issued by the Florida Department of Transportation (FDOT) for the Central Florida Rail Corridor (CFRC) Lake Monroe Drawbridge Painting project. The RFP seeks proposals for cleaning and painting work on the drawbridge. The solicitation includes multiple addenda and updates to the timeline, with the latest addendum posted on March 16, 2022. The project requires cleaning surfaces to a near-white blast finish per industry standards, but no electrical work is needed - existing mechanical and electrical equipment must be protected during the cleaning and painting. All prospective bidders must be registered in the State of Florida's MyFloridaMarketplace system, be properly licensed if the work requires state licensing, and comply with state statutes regarding contacting agency personnel during the procurement process.
The contract opportunity is specific to Volusia County, Florida. Pricing terms, set asides, and incumbent information are not provided in this document. Funding requirements and sources are also not detailed, though the project is being administered by FDOT District Five.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
719 S. Woodland Boulevard DeLand, Florida 32720-6834
KEVIN J. THIBAULT, P.E.
SECRETARY
www.fdot.gov
Questions and Answers #4
ADVERTISEMENT NUMBER: DOT-RFP-22-5007-LMBP
DESCRIPTION: Central Florida Rail Corridor (CFRC) Lake Monroe Drawbridge Painting
DATE: 2/8/2022
1. Is there any blasting work besides power washing? If so what’s the profile
Answer: Clean surfaces in accordance with SSPC-SP10 “Near-White Blast Cleaning”
2. Is there any electrical work that needs to be done?
Answer: No electrical work. Existing mechanical and electrical equipment to be protected during cleaning and painting.