F1987682925_LMBPQA6.pdf
PDF 383 KB Posted
- Solicitation number
- RFP-00040
- Issued by
- Volusia County, Florida
About this file
The document provided is a set of Questions and Answers (Q&A #6) related to a Request for Proposals (RFP) issued by the Florida Department of Transportation (FDOT) for the Central Florida Rail Corridor (CFRC) Lake Monroe Drawbridge Painting project. The RFP seeks proposals for the painting of the Lake Monroe Drawbridge, which is located in Volusia County, Florida. The Q&A provides information on the project, including the average daily train traffic and speeds, the schedule for bridge openings, and the responsibility for railroad flaggers. The RFP also includes multiple addendums and additional Q&A documents, indicating an ongoing procurement process.
The pricing and contractual terms are not explicitly stated in the document provided. However, the RFP indicates that the MFMP Transaction Fee will apply to any resulting contract, and that all bidders must be properly registered and licensed. The document also notes that there are restrictions on communications with FDOT employees during the procurement process.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
719 S. Woodland Boulevard DeLand, Florida 32720-6834
KEVIN J. THIBAULT, P.E.
SECRETARY
www.fdot.gov
Questions and Answers #6
ADVERTISEMENT NUMBER: DOT-RFP-22-5007-LMBP
DESCRIPTION: Central Florida Rail Corridor (CFRC) Lake Monroe Drawbridge Painting
DATE: 2/23/2022
1. Can we be provided a sign in sheet of the pre-bid meeting?
Answer: Please see attached Sign In sheets.
2. How many trains per day and night along with train speeds?
Answer: Average traffic/day: 40 SunRail, 6 Amtrak and 2 CSXT. Current speeds: Passenger 30 mph;
Freight 10 mph
3. Will the wood deck plank adjacent to the sidewalk be removed and reinstalled by the Owner so paint work can be accessed?
Answer: If the wood deck plank in the question refers to bridge ties, they will not be moved. Clean and paint the top flanges between the ties.
4. How often does bridge open for marine traffic?
Answer: The number of openings varies seasonally. The lift span opened 152 times in December, 2021;
61 in January, 2022. Plan Sheet B-02 lists allowable temporary closures.
5. Will the Owner be paying for the Railroad Flaggers?
Answer: Refer to Exhibit “B” Method of Compensation, Sections 2.0 Compensation and 4.0 Limiting
Amounts, Track Protection