F200567744_Addendum2.pdf
PDF 282 KB Posted
- Solicitation number
- RFP-00040
- Issued by
- Volusia County, Florida
About this file
This document is an Addendum to a Request for Proposal (RFP) issued by the Florida Department of Transportation (FDOT) for the Central Florida Rail Corridor (CFRC) Lake Monroe Drawbridge Painting project. The Addendum modifies the clearance requirements shown on the project plans, specifying a minimum 14-foot horizontal clear and 21-foot 2-inch vertical clear for the contractor's containment system or scaffold. The overall project involves painting the Lake Monroe Drawbridge, and the solicitation timeline includes several previously posted addenda, questions and answers, and a planned agency intent to award notice on March 28, 2022.
The contract opportunity is open to registered vendors in the State of Florida's MyFloridaMarketplace system, and out-of-state companies must be authorized to do business in Florida. Prospective bidders must also hold any required professional licenses. The contract will be subject to a 1% MFMP Transaction Fee, unless the transaction is exempt under Florida administrative code.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
719 S. Woodland Boulevard DeLand, Florida 32720-6834
KEVIN J. THIBAULT, P.E.
SECRETARY
www.fdot.gov
Addendum 2
ADVERTISEMENT NUMBER: DOT-RFP-22-5007-LMBP
DESCRIPTION: Central Florida Rail Corridor (CFRC) Lake Monroe Drawbridge Painting
DATE: 2/23/2022
You are hereby notified that the above referenced Request for Proposal (RFP) is modified as noted below:
Modify clearances shown on Sheet B-03 Plate F as follows:
Contractor to maintain the following clearances at all times with containment system or scaffold in place:
1. 14’-0” minimum horizontal clear (7’-0” either side of track center line)
2. 21’-2” minimum vertical clear above Top of Rail.
TO ACKNOWLEDGE RECEIPT OF THIS NOTICE AND ALL CHANGES, PLEASE SIGN AND
RETURN BY E-MAIL TO D5.PROCUREMENTQUESTIONS@DOT.STATE.FL.US PRIOR TO
March 1, 2022, at 10:00AM.
Name of Company:
Authorized Signature: Date:
FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3),
F.S. SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120, F.S.