Exhibits GPM 2-10.xlsx

XLSX spreadsheet 82 KB Posted

Attached to
HYDROSPHERE, BIOSPHERE, & GEOPHYSICS (HBG) SUPPORT SERVICES II - FINAL REQUEST FOR PROPOSAL (FRFP)
Solicitation number
80GSFC27R0015
Issued by

About this file

This file contains a set of pricing exhibits and templates for proposal submission to NASA Goddard Space Flight Center (GSFC) Request for Proposal (RFP) 80GSFC27R0015 for Hydrosphere, Biosphere, and Geophysics (HBG) Support Services II. The exhibits are designed to standardize how offerors—whether prime contractors, significant subcontractors, or non-significant subcontractors—present their direct labor costs, overhead rates, and other cost elements using a Government Pricing Model (GPM).

The exhibits require offerors to convert their own direct labor categories into GPM-specified labor categories for non-management positions (Exhibits 2A and 2C), provide management and administrative labor rates for onsite and offsite work (Exhibit 2B and 2D), and summarize total estimated costs including direct labor hours, overhead, other direct costs (ODCs), and general and administrative (G&A) expenses (Exhibit 3). Additional exhibits mandate submission of profit and fee calculations for Cost-Plus-Fixed-Fee (CPFF) and Firm Fixed Price (FFP) work breakouts (Exhibit 3A), personnel sourcing information (Exhibit 4), indirect rate summaries (Exhibit 5), overhead and G&A pool compositions (Exhibits 6A and 6B), recurring ODCs and cost estimating relationships (Exhibit 7), phase-in plan costs (Exhibits 8 and 8A), productive work year calculations (Exhibit 9), and cognizant audit agency information for DCAA and DCMA (Exhibits 10A and 10B). Sample completed exhibits demonstrate how offerors should structure labor category conversions and loaded rate calculations with overhead, fringe benefits, and G&A applied as percentages to unburdened direct labor rates.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exh 2A Prime&SS Non-Mgmt DL Con

RFP# 80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 2A
NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION
(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)
ONSITE, OFFSITE, or MANUFACTURING SITE

Contract Year _____

Place of Performance: [ ] Onsite or [ ] Offsite or [ ] Manufacturing Site

Offeror Direct Labor (DL) Category(s)*Unburdened Direct Labor RateCY Indirect Bid RatesFeeLoaded
toOfferor RatePortion %GPMOverhead $Other** $G&A $AmountGPM
GPM-Specified Non-Management DL CategoryRate%%%%DL Rate***
Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*
$0.00
$0.00
Labor Category 1~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 2~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 3~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 4~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 5~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 6~0%$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.
*Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified Non-Management DL Category
**If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)
***If this is a Prime Offeror Exhibit - Loaded Non-Management ONSITE, OFFSITE or MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Prime Loaded Non-Management Bid Rate in Exhibit 1A
***If this is a Significant Subcontractor Exhibit - Loaded Non-Management ONSITE, OFFSITE OR MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Significant Subcontractor Loaded Non-Management Direct Labor Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2B Prime & SS Offsite M&A

RFP# 80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 2B
OFFEROR MANAGEMENT AND ADMINISTRATIVE LABOR
OFFSITE Place of Performance

Contract Year _____

Offeror ManagementUnburdenedCY Indirect Bid RatesFeeLoaded
and/or AdministrativeDirect LaborOverhead $Other** $G&A $AmountDirect Labor
Direct Labor Categories*Rate%%%%Rate***
*Add additional rows if needed.
**If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)
***If this is a Prime Offeror Exhibit - Loaded OFFSITE Management and/or Administrative (M&A) Direct Labor Bid Rate MUST match the corresponding Prime Loaded OFFSITE M&A Direct Labor Bid Rate in Exhibit 1A
***If this is a Significant Subcontractor Exhibit - Loaded OFFSITE Management and/or Administrative (M&A) Direct Labor Bid Rate MUST match the corresponding Significant Subcontractor Loaded M&A Direct Labor Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2B Prime&SS On&Offsite M&A

RFP# 80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 2B
OFFEROR MANAGEMENT AND ADMINISTRATIVE LABOR
ONSITE Management and OFFSITE Administrative Place of Performance

Contract Year _____

Offeror ONSITEUnburdenedCY Indirect Bid RatesFeeLoaded
ManagementDirect LaborOverhead $Other** $G&A $AmountDirect Labor
Direct Labor Categories*Rate%%%%Rate***
Offeror OFFSITEUnburdenedCY Indirect Bid RatesFeeLoaded
AdministrativeDirect LaborOverhead $Other** $G&A $AmountDirect Labor
Direct Labor Categories*Rate%%%%Rate****
*Add additional rows if needed.
**If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)
***If this is a Prime Offeror Exhibit - Loaded ONSITE Management Direct Labor Bid Rate MUST match the corresponding Prime Loaded ONSITE Management Direct Labor Bid Rate in Exhibit 1A
***If this is a Significant Subcontractor Exhibit - Loaded ONSITE Management Labor Bid Rate MUST match the corresponding Significant Subcontractor Loaded ONSITE Management Direct Labor Bid Rate in Exhibit 1A
****If this is a Prime Offeror Exhibit - Loaded OFFSITE Administrative Direct Labor Bid Rate MUST match the corresponding Prime Loaded OFFSITE Administrative Direct Labor Bid Rate in Exhibit 1A
****If this is a Significant Subcontractor Exhibit - Loaded OFFSITE Administrative Direct Labor Bid Rate MUST match the corresponding Significant Subcontractor Loaded OFFSITE Administrative Direct Labor Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2A SAMPLE

RFP#80GSFC27R0015
Proposing Entity: XYZ, Inc.
[ ] Prime Offeror OR [ X ] Significant Subcontractor
SAMPLE - EXHIBIT 2A - SAMPLE
NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION
(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)
ONSITE, OFFSITE, or MANUFACTURING SITE

Contract Year __1___

Place of Performance: [ X ] Onsite or [ ] Offsite or [ ] Manufacturing Site

NOTE: For purposes of this sample, Offeror Data/Rate Fill-ins are highlighted in yellow. Loaded GPM DL Rate conversion is highlighted in blue.

Offeror Direct Labor (DL) Category(s)*Unburdened Direct Labor RateCY Indirect Bid RatesFeeLoaded
toOfferorPortionGPMOverhead $Other** $G&A $AmountGPM
GPM-Specified Non-Management DL CategoryRate%Rate110.00%NA25.00%8.00%DL Rate***
Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*
Position AB$20.0050%$10.00
Position ABC$26.0050%$13.00
CAD/Draftsman100%$23.00$25.30$12.08$4.83$65.21
Position 12$26.0030%$7.80
Position 123$28.5035%$9.98
Position 45$32.0035%$11.20
Communications System Engineer100%$28.98$31.87$15.21$6.08$82.14
Position X$48.00100%$48.00
Configuration Management Specialist100%$48.00$52.80$25.20$10.08$136.08
$0.00
$0.00
Labor Category 4~0%$0.00$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 5~0%$0.00$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$0.00
$0.00
Labor Category 6~0%$0.00$0.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.
* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified DL Category
** If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)
*** If this is a Prime Offeror Exhibit - Loaded Non-Management ONSITE, OFFSITE or MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Prime Loaded Non-Management Direct Labor Bid Rate in Exhibit 1A
*** If this is a Significant Subcontractor Exhibit - Loaded Non-Management ONSITE, OFFSITE OR MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Significant Subcontractor Loaded Non-Management Direct Labor Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2C Non-SS Non-Mgmt DL Con

RFP# 80GSFC27R0015
Proposing Entity:
EXHIBIT 2C
NON-SIGNIFICANT SUBCONTRACTOR
NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION
(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)
ONSITE, OFFSITE, or MANUFACTURING SITE

Contract Year _____

Place of Performance: [ ] Onsite or [ ] Offsite or [ ] Manufacturing Site

Offeror Direct Labor (DL) Category(s)*Burdened Direct Labor Rate
toOfferor LoadedPortionLoaded GPM
GPM-Specified Non-Management DL CategoryDL Rate%DL Rate**
Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*
$0.00
$0.00
Labor Category 1~0%$0.00
$0.00
$0.00
Labor Category 2~0%$0.00
$0.00
$0.00
Labor Category 3~0%$0.00
$0.00
$0.00
Labor Category 4~0%$0.00
$0.00
$0.00
Labor Category 5~0%$0.00
$0.00
$0.00
Labor Category 6~0%$0.00
~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.
* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified Non-Management DL Category
** The Non-Significant Subcontractor Loaded Non-Management ONSITE, OFFSITE or MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Non-Significant Subcontractor Loaded Non-Management Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2D Non-SS Offsite M&A

RFP#80GSFC27R0015
Proposing Entity:
EXHIBIT 2D
NON-SIGNIFICANT SUBCONTRACTOR
OFFEROR MANAGEMENT AND ADMINISTRATIVE LABOR
OFFSITE Place of Performance

Contract Year _____

OFFSITELoaded OFFSITE
Offeror Management and/or AdministrativeDirect Labor
Direct Labor Categories*Rate**
*Add additional rows if needed.
**Loaded OFFSITE Management and/or Administrative (M&A) Direct Labor Bid Rate MUST match the corresponding Subcontractor Loaded OFFSITE M&A Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2D Non-SS On&Offsite M&A

RFP# 80GSFC27R0015
Proposing Entity:
EXHIBIT 2D
NON-SIGNIFICANT SUBCONTRACTOR
OFFEROR MANAGEMENT AND ADMINISTRATIVE LABOR
ONSITE Management and OFFSITE Administrative Place of Performance

Contract Year _____

ONSITELoaded ONSITE
Offeror ManagementDirect Labor
Direct Labor Categories*Rate**
OFFSITELoaded OFFSITE
Offeror AdministrativeDirect Labor
Direct Labor Categories*Rate***
*Add additional rows if needed.
**Loaded ONSITE Management Direct Labor Bid Rate MUST match the corresponding Subcontractor Loaded ONSITE Management Bid Rate in Exhibit 1A
***Loaded OFFSITE Administrative Direct Labor Bid Rate MUST match the corresponding Subcontractor Loaded OFFSITE Administrative Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 2C SAMPLE

RFP# 80GSFC27R0015
Proposing Entity: ABC Company
SAMPLE - EXHIBIT 2C - SAMPLE
NON-SIGNIFICANT SUBCONTRACTOR
NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION
(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)
ONSITE, OFFSITE, or MANUFACTURING SITE

Contract Year __1___

Place of Performance: [ X ] Onsite or [ ] Offsite or [ ] Manufacturing Site

NOTE: For purposes of this sample, Offeror Data/Rate Fill-ins are highlighted in yellow. Loaded GPM DL Rate conversion is highlighted in blue.

Offeror Direct Labor (DL) Category(s)*Burdened Direct Labor Rate
toOfferor LoadedPortionLoaded GPM
GPM-Specified Non-Management DL CategoryDL Rate%DL Rate**
Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*
CAD Level 1$95.0050%$47.50
Draftsman Level 1$98.0050%$49.00
CAD/Draftsman100%$96.50
Jr. System Engineer$97.0030%$29.10
System Engineer$103.0035%$36.05
Lead System Engineer$107.0035%$37.45
Communications System Engineer100%$102.60
CM Level 3$152.00100%$152.00
Configuration Management Specialist100%$152.00
$0.00
$0.00
Labor Category 4~0%$0.00
$0.00
$0.00
Labor Category 5~0%$0.00
$0.00
$0.00
Labor Category 6~0%$0.00
~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.
* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified Non-Management DL Category
** The Non-Significant Subcontractor Loaded Non-Management ONSITE, OFFSITE or MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Non-Significant Subcontractor Loaded Non-Management Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 3 Prime GPM Summary

RFP #80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 3
GOVERNMENT PRICING MODEL
SUMMARY BY ELEMENTS OF COST
Elements of CostContract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Grand Total
DIRECT LABOR HOURS

DIRECT LABOR COSTS

OVERHEAD COSTS

OTHER DIRECT COSTS (ODCs):
(LIST)

TOTAL ODCs

SUBTOTAL COSTS

G&A COSTS

TOTAL ESTIMATED COST

MAXIMUM AVAILABLE FIXED FEE

TOTAL COST PLUS FIXED FEE

Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 3A Profit and Fee

RFP #80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 3A
TOTAL COST WITH PROFIT AND FEE
CPFF Breakout60%Example Fee8%
FFP Breakout40%Example Profit12%
EXAMPLE - TOTAL ESTIMATED COST$50,000,000
Cost Plus Fixed Fee (CPFF) Breakout of Costs$30,000,000(60% of Total Estimated Cost)
Firm Fixed Price (FFP) Breakout of Costs$20,000,000(40% of Total Estimated Cost)
Applied Fee$2,400,000(Offeror proposed fee percentage (i.e. 8% in example) applied to CPFF Breakout of Costs)
Applied Profit$2,400,000(Offeror proposed profit percentage (i.e. 12% applied in example) applied to FFP Breakout of Costs)
Grand Total$54,800,000
TOTAL ESTIMATED COST
Cost Plus Fixed Fee (CPFF) Breakout of Costs$0(60% of Total Estimated Cost)
Firm Fixed Price (FFP) Breakout of Costs$0(40% of Total Estimated Cost)
Applied Fee$0(Offeror proposed fee percentage applied to CPFF Breakout of Costs)
Applied Profit$0(Offeror proposed profit percentage applied to FFP Breakout of Costs)
Grand Total$0
Percentage
Offeror proposed Fee
Offeror proposed Profit

Exh 4 Source Personnel

RFP# 80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 4
SOURCE OF PERSONNEL CHART
(FIRST GPM CONTRACT YEAR ONLY)

Total Number of Staff Labor Category/Position Title Labor Category Code* Personnel Available Within Company Personnel to be Obtained from Incumbent Outside Hired Staff

TOTAL

* Code each Labor Cateogry: S=SALARIED; H=HOURLY; U=UNION; E=EXEMPT; NE=NON-EXEMPT DOL/WD DETERMINATION;
I=INCUMBENT; SU=SUBCONTRACTOR

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 5 Sum Indirect Rates

RFP#80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 5
SUMMARY OF INDIRECT RATES
Overhead OnsiteOverhead OffsiteManufacturingG&A ExpenseOther (Identify)**
RateRateOverhead RateRateRate
Contract Year 1
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 1 Composite

Contract Year 2
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 2 Composite

Contract Year 3
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 3 Composite

Contract Year 4
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 4 Composite

Contract Year 5
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 5 Composite

Contract Year 6
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 6 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED AGAINST (Specific Base)***

*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Composite Rates
**If Multiple "Other" Indirect Rates - Add additional columns and specify each individually
***Explanation of Base of Application

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 6A Overhead Pool(s)

RFP# 80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 6A
OVERHEAD EXPENSE POOL (Composition of Burden Pool)
Overhead or Service Center Pool = _______________
(Specify Type of Overhead Burden, e.g. Labor, Onsite, Offsite, Manufacturing, Engineering, Procurement, Service Center(s), etc. - See Section L - Cost Volume Instructions)

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

ContractorContractorContractorContractorContractorContractorContractorContractorContractor
Cost Elements withinFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
the Overhead Burden PoolPrior Yr 3**Prior Yr 2**Prior Yr 1**______________________________________________________
Total Overhead Pool Expenses
Base of Distribution (identify) Dollars:
Existing Base
Forecasted Base*
Contractor FY Rate (%)
Conversion of Contractor FY Overhead Rate to Contract Year (CY) RateCY 1CY 2CY 3CY 4CY 5CY 6
Proposed Overhead Bid Rate by CY
If more than one Overhead Pool is proposed, submit a separate Exhibit for each Pool.
*Provide details of the forecasted base.
**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 6B G&A Pool

RFP#80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 6B
GENERAL AND ADMINISTRATIVE (G&A) EXPENSE POOL (Composition of Burden Pool)

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Cost Elements Within the G&A Expense Pool
ContractorContractorContractorContractorContractorContractorContractorContractorContractor
Fiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
Prior Yr 3**Prior Yr 2**Prior Yr 1**______________________________________________________

Labor:

Labor Related Cost:

B&P
IR&D
Corporate Allocations:

Other (Specify):

Total G&A Pool Expenses
Base of Distribution (identify) Dollars:
Existing Base
Forecasted Base*
Contractor FY Rate (%)
Conversion of Contractor FY Overhead Rate to Contract Year (CY) RateCY 1CY 2CY 3CY 4CY 5CY 6
Proposed G&A Bid Rate by CY
If more than one G&A Pool is proposed, submit a separate Exhibit for each Pool.
*Provide details of the forecasted base.
**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 7 Recurring ODCs-CERs

RFP #80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 7
SUMMARY OF RECURRING OTHER DIRECT COSTS (ODCs) / COST ESTIMATING RELATIONSHIPS (CERs)
Specify ODC**Specify ODC**Specify ODC**Specify ODC**
Percentage/Rate/Amount***Percentage/Rate/Amount***Percentage/Rate/Amount***Percentage/Rate/Amount***
Contract Year 1
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 1 Composite

Contract Year 2
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 2 Composite

Contract Year 3
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 3 Composite

Contract Year 4
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 4 Composite

Contract Year 5
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 5 Composite

Contract Year 6
*Portion of Contractor FY From:________to________
*Portion of Contractor FY From:________to________

Contract Year 6 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED AGAINST (Specific Base)****

*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Rates
**Type/Name of Recurring ODCs or CERs (i.e. Computer Usage, Program Management, Administrative Support, Depreciation, etc.)
***Specify ODC as either a Percentage (%), Rate, and/or Dollar amount ($)
****Explanation of Base of Application

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 8 Phase-In Plan

RFP#80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 8
PHASE-IN PLAN PRICE

Elements of Cost Proposed Costs

DIRECT LABOR HOURS (Derived from Exhibit 8A)

DIRECT LABOR COST (Derived from Exhibit 8A)

OVERHEAD

OTHER DIRECT COSTS:
Relocation
Training
Subcontracts
Travel
Other (detail)
TOTAL ODCS

SUBTOTAL COSTS

G&A

TOTAL COSTS

PROFIT

TOTAL FIRM FIXED PRICE

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 8A Phase-In DL

RFP#80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 8A
DIRECT LABOR PHASE-IN COSTS

Direct Labor Categories Hours Proposed Rates Proposed Costs

TOTAL PHASE-IN DIRECT LABOR COSTS

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 9 Prod WY

RFP# 80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 9
PRODUCTIVE WORK YEAR CALCULATION

Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 Contract Year 6

Total Possible Hours in Year
Less:
Vacation in Hours

Holidays in Hours

Sick Leave in Hours

Miscellaneous in Hours
(specifically identify)

PRODUCTIVE WORK YEAR in Hours (Hours Actually Worked)

This exhibit contains Source Selection Information. See FAR 3.104.

Exh 10A DCAA Info

RFP #80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 11A
Cognizant Defense Contract Audit Agency (DCAA) Office Information

DCAA Online Info http://www.dcaa.mil

Submitting Entity:DCAA Field Audit Office (FAO):
Company Name:DCAA FAO:

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

http://www.dcaa.mil/ Exh 10B DCMA Info

RFP#80GSFC27R0015
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 11B
Cognizant Defense Contract Management Agency (DCMA) Office Information

DCMA Online Info http://www.dcma.mil

Submitting Entity:DCMA Cognizant Office:
Company Name:DCMA Office

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Disclosures:DateAudit Report #Status
Contractor Estimating System Review (CESR)
Contractor Purchasing System Review (CPSR)
Contractor Billing System Review
Contractor Accounting System Review
Contractor Disclosure Statement Accuracy
Contractor Executive Compensation Review
Contractor Property Management System
Forward Pricing Rate Agreements
Earned Value Management System (EVMS)
Level of CAS applicability
Determination of Cost Accounting Standards (CAS) applicability

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

http://www.dcma.mil/ Sheet1

File details come from the government source that posted it. Updated .