This document is Exhibit N - GC Work Costs Matrix from a Construction Manager/General Contractor (CM/GC) contract with Western Oregon University (WOU). The matrix provides a comprehensive breakdown of direct costs and general conditions costs associated with project delivery, encompassing staffing positions including a Principal in Charge, Project Executives, Project Managers, Superintendents, and various coordinators, along with job office expenses, equipment rental, temporary facilities, and project-specific services. The document outlines 108 line items organized by cost category, with specific annotations indicating which items require actual invoices for Owner approval, which items may be reimbursable based on project necessity, and which items are excluded from separate reimbursement. Staffing positions are designated as full-time or for specific project time only, and the matrix requires bidders to provide quantity, unit measurements, unit pricing, and total costs for applicable items.
The pricing structure distinguishes between direct costs of work, costs paid by the Owner, costs covered by the CM/GC fee, and miscellaneous costs, with General Conditions subtotals and Insurance and Bond line items (Items 38 and 40) calculated separately. Items marked with an "X" designation require substantiating invoices and Owner approval of subcontractor bids. Notable provisions include that trade permits shall be included in subcontractor bids rather than reimbursed separately; items purchased for the project become WOU property at the University's discretion; time-based cost items (day, week, month) are eligible for adjustment only if the contract schedule is extended due to Owner-initiated scope changes; and labor burden must be included for all staff positions with documentation of anticipated weekly hours. The document specifies that no reimbursement will be made for CM/GC-sponsored promotional events or meals, and establishes detailed requirements for temporary facilities, including specifications for the job site office trailer setup and monthly digital progress photo documentation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX C
Computer Solutions Hub
Direct Costs/GC Work Costs Matrix
Item Quantity Unit Unit Price Total Cost
Costs Related to CM, Staffing, & Job Office (4)
1 Principal in Charge (for specific Project time only) √
2 Project Executive (for specific Project time only) √
3 Senior Project Manager (for specific Project time only) √
4 Project Manager (for specific Project time only) √
5 Project Superintendent √
6 Area Superintendents (for specific Project time only) √
7 Project Engineers √
8 Field Engineers √
9 Scheduler (for specific Project time only) √
10 MEP Coordinator (for specific Project time only) √
11 LEED Coordinator (for specific Project time only) √
12 Safety Coordinator (for specific Project time only) √
13 On-site Project Administrative Staff (for specific Project time only) √
14 Punch List Administration √
15 Detailer X
16 Accounting/Data Processing X
17 Payroll Accountant X
18 Surveying - sub bids required X
19 Trade labor employed by CM/GC X
20 Labor Burden for CM/GC trade labor (See 8.4.9 of the Contract for DB Services with GMP) X
21 Travel, Hotel, Meals, etc. (5) IRS tax-exempt amount X
22 Jobsite Office material costs and expendables, including coffee and water for OAC meetings √
23 Warranty X
24 Corrective/Non-conforming repair X
25 Corrective work not due to contractor default X
26 PM auto rental √
27 PM auto fuel/maintenance √
28 Project Superintendent truck rental √
29 Project Superintendent truck fuel/maintenance √
30 Office Trailer Rental (6) √
31 Office Furniture/Equipment, including copier, scanner and supplies, etc. √
32 Advertising and Blueprints for sub bidding (7) $0
33 Blueprints for day-to-day job operations √
34 Postage/FedEx √
35 Project Photos (8) √
36 Personal Computers/software; and all tech-support, regardless of the source √
37 General Contractor Bond (This may be stated as a percentage of the "Cost of Work.") (13) √
38 Subcontractor Bonds X
39 Insurance GL (Per WOU contract - may be stated as a percentage of the "Cost of Work.") (13) √
40 Insurance All Risk X
41 Soils report X
42 Testing and Inspections X
43 Facility Systems training X
44 Building Permit Fees (This does not include individual trade permits.) X
45 Development Permits/fees X
46 All Estimating X
47 Value engineering X
48 Corporate accounting X
49 Corporate safety officer X
50 Main office administration X
51 Corporate IT director X
52 Legal X
53 Main office payroll costs X
54 Main office fringe/bonus costs X
55 Small tools & equipment Rental (For items under $100 aggregate cost) √
56 Contractor Owned equipment √
57 Temporary Toilets √
58 Project Signs - (9) √
59 All other temporary signage √
60 Temporary Fencing - entire project site must be enclosed in fencing X
61 Barricades X
62 Temporary Enclosures X
63 Temporary Stairs (10) √
64 Opening Protection (10) √
65 Safety railing and nets (10) √
66 Drinking water √
67 Coffee or other soft drinks X
68 Safety equipment for CMGC personnel √
69 First Aid supplies for CMGC personnel √
70 Construction Site Security (11) √
71 Weather protection (10) √
72 Mobilization/Demobilization √
73 Parking/Shuttles √
74 Telephone Installation √
75 Telephone Bills, including cell phones and radio usage, as applicable √
76 Temp utilities hookup √
77 Temp utility bills √
78 Periodic Cleanup √
79 Final cleanup - sub bids required X
80 Dump permits/fees X
81 Trash removal/Hauling Fees X
82 Flagging/Traffic control X
83 Dust Control √
84 Trash chute X
Description Direct Cost of the Work (2)
Exhibit H
Construction costs/Paid by Owner
Costs covered by
CM/GC Fee
Misc. Costs
Paid by Owner
General Conditions Work Cost (1, 3)
APPENDIX C
85 Trade permits X
86 Scaffolding X
87 Man-lift Rental X
88 Man-lift Erect/Dismantle X
89 Man-lift operator X
90 Crane rental X
91 Crane operator & bellman X
92 Crane Erect/Dismantle/Jump X
93 Crane Service agreement costs X
94 Temp elevator operator √
95 Temp elevator protection √
96 Forklift rental √
97 Forklift operator √
98 Fuel/Oil/Maintenance & Parts √
Other General Condition Items as May be Necessary
Project Specific Peer Reviews, such as the following: (12)
99 - Exterior skin/waterproofing consultant √
100 - Quality Control consultant √
101 - Safety consultant √
102 - Secondary estimating √
103 - Drug testing √
Other General Conditions that may apply to the Project - list any as appropriate
104 √
105 √
106 √
107 √
108 √
GENERAL CONDITIONS - SUB-TOTAL:
Insurance and Bond (Items 38 & 40):
GENERAL CONDITIONS - TOTAL:
NOTES:
Campus Public Safety staff of WOU will only patrol the perimeter of the project site during their routine campus tours. Any other security needed for the project will need to be provided by the CM/GC.
A dollar amount must be entered for these items if it is your company's policy to require peer reviews, or third-party consultant assessments of these items. This includes any reviews/assessments performed by company personnel, not directly working on the Project. If no dollar amount is entered, then any cost for these items, should they be used, will be included in the CM/GC fee.
The actual cost of this item will be included in the General Conditions Schedule of Values for each Early Work Agreement (EWA) or when the GMP is established. (Refer to Article 8 of the CM/GC
Contract for what constitutes the "Cost of the Work." and Article 9 for exclusions,)
A check-mark in the "Item" column identifies those items which may be needed, for this project. Please provide the Quantity, Unit, Unit Price, and Total Cost for those items checked as General
Conditions. Additional items may be added in the blanks provided. If no cost is entered, it is assumed that this item will be provided at no additional cost to the Owner.
Items with an "X" in this column will require actual invoices to be provided for approval and Owner's review and approval of subcontractor bids as noted. Any items purchased for use on the project, whether new or used, will be given to WOU, at WOU's discretion at the end of the project. Trade permits shall be included in the bids from the appropriate subcontractor, and shall not be reimbursed separately.
Only those items with a unit measurement related to time, e.g. day, week, or month, will be considered if the Contract schedule is extended due to a scope change initiated by the Owner.
Include Labor Burden for all staff positions, and indicate approximately how many hours per week this individual will be directly involved with the project, and if and when the number of hours may change, if at all. Write
"NA" in the "Quantity" column for any listed staff positions not required for the Project. (See Note #1.)
An allowance (the IRS tax-exempt reimbursable amount) shall be carried in the General Conditions budget for occasions when meals or refreshments may be appropriate, e.g. when OAC meetings are scheduled to extend through the lunch hour, or otherwise as may be approved in advance by WOU. All other travel and per diem expenses shall be reimbursed in accordance with Article 8.2.1.1 and Exhibit G of the Contract for DB Services with Guaranteed Maximum Price. No reimbursement will be made for "safety award" meals, or other similar CM/GC sponsored promotions, items, or events.
This trailer shall not be used by trade workers, except if needed for safety training or jobsite orientation. "Foremen's Meetings" may be held in this trailer. The meeting area shall have at least one 4'x6' white board, a calendar, and an updated copy of the project schedule mounted on the wall(s). The meeting area must be kept clean and presentable.
This item should be included in the Pre-construction fee; no amount should be entered here.
A digital photo record of Project progress shall be provided to WOU electronically once a month during the course of the project. Progress photos shall include MEP rough-in work - prior to the installation of insulation - installed in walls, floors, and ceilings, with a written description of the location by room number, elevation, etc.
A full-color detailed rendering of a proposed Project sign shall include the name and logo of WOU and A&E firms. The sign and its location must be approved by WOU prior to placement
If applicable, provide a detailed description of what is included in these items.
File details come from the government source that posted it. Updated .