EXHIBIT E - Chiller and Controls Scope for APSC.pdf
PDF 72 KB Posted
- Attached to
- Maaske and APSC Remodel RFP
- Solicitation number
- S-580200-00018488
- Issued by
- Multnomah County, Mission CDP, Oregon
About this file
This is an Exhibit E scope of work document detailing chiller and controls installation services for the Arkansas Public Schools Corporation (APSC). The scope encompasses the complete replacement of an existing chiller system, including disconnection and removal of the current unit with all associated electrical disconnects and necessary logistics for extraction and installation. The new system installation requires connection to existing piping infrastructure and properly sized electrical wiring to the appropriate breaker with phase monitoring capabilities. The contractor must perform a full operational cycle check verifying water flow on both chilled and condensing water sides in accordance with manufacturer specifications, properly configure cooling tower controls, and fully integrate the new system into the facility's Building Automation System (BAS) with verification of all commands and proper communication functionality. The scope also includes providing operating directions and maintenance instructions for equipment use, along with warranty information regarding the start date and length of coverage.
No specific pricing information, set-asides, incumbent contractor details, funding sources, or contract term and renewal options are detailed within this scope document. The file focuses exclusively on the technical and operational requirements for the chiller system replacement project without addressing commercial or administrative contract terms.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chiller and Controls Scope for APSC
1. Disconnection and removal of the existing unit, including all electrical disconnects and the necessary logistics for unit extraction and installation.
2. Installation of the new system, including connection to existing piping and ensuring electrical wiring is sized to the proper breaker including phase monitoring to chiller
3. Performance of a full cycle check, verifying water flow on both the chilled and condensing sides in accordance with the manufacturer's recommendations.
4. Proper configuration of cooling tower controls.
5. Full integration of the system back into our BAS, ensuring all commands are functional and communicating correctly.
6. Operating direction and maintenance instructions for proper use of equipment. Start and length of warranty