EXHIBIT F - WOU Maaske and APSC Telecom Specifications.pdf

PDF 194 KB Posted

Attached to
Maaske and APSC Remodel RFP
Solicitation number
S-580200-00018488
Issued by
Multnomah County, Mission CDP, Oregon

About this file

This document is a Telecommunication Services Vendor/Contractor Bid Requirements specification issued by Western Oregon University for telecommunications cabling and wiring installation work at Maaske Hall and the Academic Programs and Support Center. The project encompasses installation of approximately XXX wire drop locations throughout the ground floor of Maaske Hall and various locations in the Academic Programs and Support Services building. The scope of work includes providing and pulling Category 6a cables through existing conduits, installing cable supports and cable trays, terminating cables on SYSTIMAX patch panels, installing workstation jacks and faceplates, certifying all cables to meet ANSI/TIA/EIA Category 6a specifications, labeling all installations, conducting testing, and providing complete as-built documentation upon project completion. All installation work must comply with ANSI/EIA/TIA 568B Commercial Building Telecommunications Wiring Standards, BICSI TDM Manual procedures, and Oregon Building Code requirements. All technicians performing installation work must hold Limited Energy Tech Class A/B licenses and be certified Category 6a installers. The document does not specify response dates, due dates, award dates, or contract term information.

The specification requires contractors to test all installations with approved Category 6a and fiber certification testers, with WOU Telecom Services reserving the right to randomly test installations and withhold up to 10 percent of total project payment for unsatisfactory work. Contractors must provide all tools, equipment, materials, waste disposal, and required permits and inspections. If the maximum compensation exceeds $50,000, contractors must comply with Oregon Revised Statutes 279C.800 through 279C.870 and prevailing wage rate requirements established by the Oregon Bureau of Labor and Industries. WOU will provide fiber and copper patch cords, perform patching and cross-connecting of connections, and supply all switches and routers. The document includes no information regarding pricing, set-asides, incumbents, funding sources, or amounts.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W E S T E R N O R E G O N U N I V E R S I T Y

TELECOMMUNICATION SERVICES

VENDOR/CONTRACTOR BID REQUIREMENTS

FOR TELECOMMUNICATIONS (VOICE/DATA/COAX/FIBER)

WIRING/CABLING INSTALLATION WORK

WESTERN OREGON UNIVERSITY

Maaske Hall

Academic Programs and Support Center

October 20, 2026

W E S T E R N O R E G O N U N I V E R S I T Y

Telecommunication Services

WOU TELECOMMUNICATIONS CABLING/WIRING STANDARDS:

All wiring and cabling work at WOU shall comply with the ANSI/EIA/TIA 568B Commercial Building

Telecommunications Wiring Standard, all relevant EIA/TIA Technical Systems Bulletins, and the recommended installation procedures in the BICSI TDM Manual. Based on these standards, practices and procedures, all outlets, jacks, terminal blocks and horizontal station wiring shall be Category 6a (Level 6) compliant and installed as a “Structured Cabling System”.

More specifically, the horizontal station wire and tie cables shall be Category 6a, Level 6, UTP, 4-pair, and shall be SYSTIMAX station wire. The cable jacket shall comply with Article 800 NEC for use as plenum wire where environmental conditions require plenum rating, or riser rating in all other locations.

For all WOU installations, SYSTIMAX is the approved Level 6-connectivity vendor. Vendor must be

SYSTIMAX certified in the State of Oregon. Communications outlets at workstation and other jack locations consist of single gang wall face plates with 2 outlets (unless noted otherwise) equipped with 8-pin modular (RJ-

45) jacks. WOU has standardized on the following SYSTIMAX workstation components: Stainless steel or gray faceplates (verify with WOU before ordering); MGS600-GY modular jacks; white icons stating “voice” and orange icons stating “data”. Horizontal station wires shall extend from communications outlets to associated terminal closets and shall be terminated on Intermediate Distribution Frames (IDF) using SYSTIMAX rack mounted patch panels. All terminated station wirings shall be properly labeled at the outlet faceplate and the

IDF.

Horizontal station wire shall extend from communications outlets to associated terminal closet and shall be terminated on IDF’s using SYSTIMAX patch panels. Terminal closet material standards include the following Avaya/SYSTIMAX Technologies equipment: mounting on SYSTIMAX Patch Panels.

CommScope GigaREACH XL extended distance cable may be used in instances where the UTP cable is over 100 meters. Standard applications for this cable are up to 150 meters for 90W PoE and 1Gb data rate, and up to 200 meters for 90W PoE and 100Mb data rate. Request approval from WOU prior to installing

GigaREACH XL to ensure the intended device for the cable run will be supported.

All technicians performing horizontal cabling or wiring work must be certified and licensed with a Limited

Energy Tech Class A/B license and qualified in the installation of Category 6a wire, jacks, patch panels or terminal blocks. While contractors may choose to use less qualified or uncertified labor for “wire pulling”, all wire termination work must be performed by technicians who are certified Category 6a installers and testers.

Contractors will be asked to provide documentation or evidence that technicians are qualified Category 6a installers and are current with ANSI/EIA/TIA standards prior to project startup. These will be required before the start of the project. Failure to provide such evidence or documentation could result in the disqualification of the Contractor and termination of the installation agreement/contract. MINIMUM WAGE RATES. If the amount of maximum compensation for Work is more than $50,000, the Contractor will comply with the provisions of ORS 279C.800 through 279C.870, Section C.1 of the OUS General Conditions and the BOLI

Prevailing Wage Rates based on most current publication.

These standards describe the general cabling and wiring guidelines to be adhered to by all contractors performing telecommunications cabling and wiring work at WOU. Any exceptions to these standards will be

VENDOR/CONTRACTOR BID REQUIREMENTS FOR

TELECOMMUNICATIONS (VOICE & DATA) WIRING/CABLING PROJECT

duly noted in the specific Scope of Work for each project.

Any questions about these cabling and wiring standards should be directed to the WOU Telecommunications

Services (hereinafter referred to as WOU Telecom Services).

WOU TELECOM SERVICES QUALITY CONTROL & ASSURANCE REQUIREMENTS:

Testing and Documentation

Contractor shall test all cable and wiring installed with an approved Category 6a Certification tester and fiber

Certification tester and record all test results. Any installations that fail the testing shall be corrected and retested. All recorded results and related testing documentation, including those showing test failures, shall be provided to WOU Telecom Services. WOU Telecom Services reserves the right to randomly test the Category

6a through-put at various installation locations to ensure the accuracy and completeness of Contractor testing.

Should any of these test fail, WOU Telecom Services may withhold all, or some portion, of the payment due

Contractor.

Housekeeping and General Clean-up

Contractor shall ensure that all work areas are left in a clean, safe condition at the end of each workday or shift as well as at the end or completion of the entire project. Contractors are responsible only for that work they perform and results in cleanliness or safety issues. Existing conditions are the responsibility of WOU. Any questions or observations about existing conditions should be brought to the attention of WOU’s project manager.

Qualifications, Professionalism and Behavior of Contractor Employees

All technicians and other contractor employees performing work on WOU premises shall be highly qualified, skilled professionals who always behave in a professional and courteous manner. Contractor employees must have the ability to plan and organize their work efficiently and communicate effectively with WOU Telecom

Services staff and other customer contacts in the field.

WOU Telecom Services places a strong emphasis on good customer service and fully expects all its contractors and vendors to endorse this service ethic when deploying technicians and other employees on the WOU campus.

All Contractor technicians and employees shall wear appropriate work attire on the job and shall present themselves in a professional manner in terms of attire and overall appearance. All technicians or employees per work group shall wear attire that includes the Contractor or vendor logo, business name, etc. In lieu of logo attire, badges may be worn to identify technicians or employees.

SCOPE OF WORK:

Pursuant to the installer qualifications described previously, Contractor will install approximately XXX wire drop locations throughout the ground floor of the Maaske Hall, and various locations in the Academic

Programs and Support Services building. Contractor shall:

1. Provide and pull wire through existing conduits and/or establish other pathways to extend from the MDF to station jack locations throughout buildings. All cable routes and proposed pathways must be reviewed and approved by WOU project coordinator prior to starting work.

2. Provide and install all necessary cable supports. Main cable routes (i.e. hallways) must be installed in cable tray.

3. Provide all necessary miscellaneous materials such as screws, ties, tape, bolts, etc.

4. Provide all building code compliant fire stops when and where required.

5. Pull all Category 6a cables to each room such that each cable will be a home run to the MDF/IDF where they will be terminated on Category Cat6a patch panels.

6. Provide and install Chatsworth 2-post 7ft tall racks - three in the MDF (Maaske Hall only). Each rack should have 6” wide 7ft tall vertical cable management between them.

7. Certify all cables from each jack to the patch panel in the MDF/IDF to verify the meet Category

6a ANSI/TIA/EIA specifications.

8. Terminate station wiring on appropriate SYSTIMAX MGS600 jacks at station location and installed in appropriate faceplate per WOU Telecom Services wiring standards.

9. Properly label all installed wire drops at both the MDF/terminal closet end and the station jack end.

Labeling system is to be approved by WOU before labeling any locations.

10. Conduct all testing required to verify and ensure compliance with Category 6a conductivity, connectivity and throughput requirements;

11. Repair or replace any wire drops that do not pass testing described above;

12. Document all test results in a clear, concise and legible manner, and provide such documentation to WOU

Telecom Services.

13. Provide WOU Telecom Services with complete set of as-builts upon completion of installation work above.

14. Install horizontal wire managers above and below all newly installed patch panels.

15. Protect all cabling that remains included but not limited to: HVAC control wires, coax, category cabling, fire control, etc. Notify WOU immediately of any damage done to existing cabling.

ADDITIONAL CONTRACTOR REQUIREMENTS & RESPONSIBILITIES:

In addition to the requirements listed above, Contractor is also responsible for the following:

1. Provide all tools and installer equipment necessary to perform the work.

2. Identify single point of contact to function as Contractor’s on-site Project Manager.

3 Contractor Project Manager to check-in daily and meet weekly with WOU Telecom Services Project

Manager to provide project status and updates; resolve any problems identified or encountered while performing installation work; and provide status of material used to date and any other related material inventory issues.

4. Maintain log of all personnel data to include number of installers/techs on the job, hours worked to date and projected hours remaining to complete entire Scope of Work.

5. Conduct installation plan review.

6. Coordinate and work with building occupants as required; and must make every effort to ensure that all

Contractor personnel cooperate and work well with others on job site.

7. Minimize waste of material usage. Proper off-site disposal of waste and removed cable is contractor’s responsibility.

8. Guarantee installation work and describe the nature and extent of the guarantee.

9. Work closely with WOU Telecom Services to schedule the work as required by the bid documents.

10. Contractor will obtain all permits and is responsible for all required inspections by the local authorities.

WOU TELECOM RESPONSIBILITIES:

1. The following primary contact person will function as WOU IT Services Project Coordinator for this project:

Nathan Sauer

Customer Services and Support Manager

University Computing Services – ITC 015

Western Oregon University sauern@wou.edu Phone: 503-838-8960

2. Project Coordinator will attend weekly project meetings and any other project meetings with Contractor.

3. Function as primary interface/coordinator with other contractors on job site.

4. Review and approve station locations, cable routes and paths, equipment layout in terminal closets, and labeling system/standards.

5. WOU will provide fiber and copper patch cords.

6. WOU will provide patching and cross-connecting of voice and data connections.

7. WOU will provide all switches, routers, etc. This project does not include any configuring of network equipment.

ACCEPTANCE OF WORK:

All installation work performed must be accepted by WOU Telecom Services, and WOU Telecom Services reserves the right to withhold up to 10% of the total project price pending satisfactory resolution of any unsatisfactory installations that may be identified by WOU Telecom Services during final acceptance inspection.

QUESTIONS/COMMENTS/ADDITIONAL PERTINENT INFORMATION:

All questions, comments or requests for additional pertinent information should be directed to Nathan Sauer, Customer Services and Support Manager.

mailto:sauern@wou.edu

TELECOMMUNICATION SERVICES
Telecommunication Services
WOU TELECOMMUNICATIONS CABLING/WIRING STANDARDS:
WOU TELECOM SERVICES QUALITY CONTROL & ASSURANCE REQUIREMENTS:
SCOPE OF WORK:
ADDITIONAL CONTRACTOR REQUIREMENTS & RESPONSIBILITIES:
WOU TELECOM RESPONSIBILITIES:
ACCEPTANCE OF WORK:
QUESTIONS/COMMENTS/ADDITIONAL PERTINENT INFORMATION: