This document is the General Conditions for Design/Build Services Contracts (Exhibit M), Revision 07/01/2026, issued by Western Oregon University (WOU) and applicable to all designated design/build services construction contracts for the institution. The General Conditions establish the comprehensive framework governing the contractual relationship between WOU (Owner) and contractors performing construction services. The document does not reference specific project overviews, quantities, response dates, award dates, or contract terms for individual projects, as it functions as a standardized template for terms and conditions that apply across multiple contracts. Instead, it provides detailed provisions regarding contract administration, contractor responsibilities, materials and workmanship standards, inspection and testing procedures, permits and regulatory compliance, labor requirements including prevailing wage obligations, change order procedures, payment schedules, and dispute resolution mechanisms. Contract-specific details such as project scope, timeline, pricing, and other particularized terms are incorporated through separate Contract Documents, Amendments, and Supplemental General Conditions.

The General Conditions establish that contractors must comply with Oregon Revised Statutes requirements including prevailing wage rates (ORS 279C.800-279C.870), pay all workers in accordance with BOLI-determined minimum hourly rates, and submit certified weekly payroll statements. Retainage may be withheld at up to five percent of progress payments, with specific provisions for release upon Substantial Completion and satisfaction of a thirty-day successful operation period for systems. The Owner reserves the right to withhold payments for defective work, inadequate progress, failure to pay subcontractors, or other specified circumstances. Contract modifications require written Amendments executed by both parties, though the Owner may issue Construction Change Directives unilaterally. Contractors must obtain all necessary permits and licenses (except general building permit fees paid by Owner), maintain insurance coverage, provide performance and payment security as required, and comply with all applicable federal, state, and local laws including civil rights statutes and accessibility requirements. Disputes proceed through a mandatory claims review process followed by non-binding mediation before litigation, which must be brought in Lane County Circuit Court or the United States District Court for the District of Oregon.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Conditions for Design/Build Services Contracts REV 07/01/2026 Page 1

GENERAL CONDITIONS

FOR DESIGN/BUILD SERVICES CONTRACTS

August 2026

INSTRUCTIONS: This General Conditions for Design/Build Services Contracts (“WOU General Conditions”) applies to all designated design/build services construction contracts. Changes to the WOU General Conditions (including any additions, deletions or substitutions) should only be made by attaching Supplemental General Conditions. The text of these WOU General Conditions should not otherwise be altered.

TABLE OF SECTIONS

SECTION A - GENERAL PROVISIONS

A.1 DEFINITION OF TERMS

A.2 SCOPE OF WORK

A.3 INTERPRETATION OF CONTRACT DOCUMENTS

A.4 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE

A.5 INDEPENDENT CONTRACTOR STATUS

A.6 RETIREMENT SYSTEM STATUS AND TAXES

A.7 GOVERNMENT EMPLOYMENT STATUS

SECTION B - ADMINISTRATION OF THE CONTRACT

B.1 OWNER’S ADMINISTRATION OF THE CONTRACT

B.2 CONTRACTOR'S MEANS AND METHODS

B.3 MATERIALS AND WORKMANSHIP

B.4 PERMITS

B.5 COMPLIANCE WITH GOVERNMENT REGULATIONS

B.6 SUPERINTENDENCE

B.7 INSPECTION

B.8 SEVERABILITY

B.9 ACCESS TO RECORDS

B.10 WAIVER

B.11 SUBCONTRACTS AND ASSIGNMENT

B.12 SUCCESSORS IN INTEREST

B.13 OWNER'S RIGHT TO DO WORK

B.14 OTHER CONTRACTS

B.15 GOVERNING LAW

B.16 LITIGATION

B.17 ALLOWANCES

B.18 SUBMITTALS, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

B.19 SUBSTITUTIONS

B.20 USE OF PLANS AND SPECIFICATIONS

B.21 FUNDS AVAILABLE AND AUTHORIZED

B.22 NO THIRD-PARTY BENEFICIARIES

SECTION C - WAGES AND LABOR

C.1 MINIMUM WAGES RATES ON PUBLIC WORKS

C.2 PAYROLL CERTIFICATION AND FEE REQUIREMENTS, ADDITIONAL RETAINAGE

C.3 PROMPT PAYMENT AND CONTRACT CONDITIONS

C.4 PAYMENT FOR MEDICAL CARE

C.5 HOURS OF LABOR

General Conditions for Design/Build Services Contracts REV 07/01/2026 Page 2

SECTION D - CHANGES IN THE WORK

D.1 CHANGES IN THE WORK

D.2 DELAYS

D.3 CLAIMS REVIEW PROCESS

SECTION E - PAYMENTS

E.1 SCHEDULE OF VALUES

E.2 APPLICATIONS FOR PAYMENT

E.3 PAYROLL CERTIFICATION REQUIREMENT

E.4 DUAL PAYMENT SOURCES

E.5 RETAINAGE

E.6 FINAL PAYMENT

SECTION F - JOB SITE CONDITIONS

F.1 USE OF PREMISES

F.2 PROTECTION OF WORKERS, PROPERTY, AND THE PUBLIC

F.3 CUTTING AND PATCHING

F.4 CLEANING UP

F.5 ENVIRONMENTAL CONTAMINATION

F.6 ENVIRONMENTAL CLEAN-UP

F.7 FORCE MAJEURE

SECTION G - INDEMNITY, BONDING AND INSURANCE

G.1 RESPONSIBILITY FOR DAMAGES/INDEMNITY

G.2 PERFORMANCE AND PAYMENT SECURITY, PUBLIC WORKS BOND

G.3 INSURANCE

SECTION H - SCHEDULE OF WORK

H.1 CONTRACT PERIOD

H.2 SCHEDULE

H.3 PARTIAL OCCUPANCY OR USE

SECTION I - CORRECTION OF WORK

I.1 CORRECTIONS OF WORK BEFORE FINAL PAYMENT

I.2 WARRANTY WORK

SECTION J - SUSPENSION AND/OR TERMINATION OF THE WORK

J.1 OWNER'S RIGHT TO SUSPEND THE WORK

J.2 CONTRACTOR'S RESPONSIBILITIES

J.3 COMPENSATION FOR SUSPENSION

J.4 OWNER'S RIGHT TO TERMINATE CONTRACT

J.5 TERMINATION FOR CONVENIENCE

J.6 ACTION UPON TERMINATION

SECTION K - CONTRACT CLOSE-OUT

K.1 RECORD DOCUMENTS

K.2 OPERATION AND MAINTENANCE MANUALS

K.3 COMPLETION NOTICES

K.4 TRAINING

K.5 EXTRA MATERIALS

General Conditions for Design/Build Services Contracts REV 07/01/2026 Page 3

K.6 ENVIRONMENTAL CLEAN-UP

K.7 CERTIFICATE OF OCCUPANCY

K.8 OTHER CONTRACTOR RESPONSIBILITIES

K.9 SURVIVAL

General Conditions for Design/Build Services Contracts REV 07/01/2026 Page 4

GENERAL CONDITIONS FOR DESIGN/BUILD SERVICES CONTRACTS

(“WOU General Conditions”)

SECTION A

GENERAL PROVISIONS

A.1 DEFINITION OF TERMS

In the Contract Documents the following terms shall be as defined below:

AMENDMENT, means a writing which, when fully executed by the Parties to this Contract, constitutes a change to a

Contract Document. Amendments, including change orders, shall be issued in accordance with the provisions of Section D and, if applicable, establish a Contract Price or Contract Time adjustment.

APPLICABLE LAWS, means federal, state and local laws, codes, rules, regulations, ordinances, and Owner policies and procedures applicable to the Work and to the Contract.

ARCHITECT/ENGINEER, means any Person appointed by the Owner to make drawings and specifications and/or, to provide contract administration of the Work contemplated by the Contract to the extent provided herein or by supplemental instruction of Owner (under which Owner may delegate responsibilities to the Architect/Engineer), in accordance with ORS

Chapter 671 (Architects) or ORS Chapter 672 (Engineers) and administrative rules adopted thereunder. For the sake of clarity without modifying the foregoing, for purposes of this Contract, Architect/Engineer does not include the Contractor or any Subcontractor. In the event that the Owner has not appointed any Person as Architect/Engineer for the Project, the

Owner is the Architect/Engineer or such Contract term is inapplicable to the Project.

BID, means an offer binding on the Bidder and submitted in response to an Instructions to Bidders or a proposal in connection with a Request for Proposals.

BIDDER, means a Person that submits a Bid in response to Instructions to Bidders or a proposal in connection with a

Request for Proposals.

CLAIM, means a demand by Contractor pursuant to Section D.3 for review of the denial of Contractor’s initial request for an adjustment of Contract terms, payment of money, extension of Contract Time or other relief, submitted in accordance with the requirements and within the time limits established for review of Claims in these WOU General Conditions.

CONSTRUCTION CHANGE DIRECTIVE, means a written order by the Owner to the Contractor requiring a change in the Work within the general scope of the Contract Documents, issued under the provisions of Section D.

CONTRACT, means the written Design/Build Contract between the Owner and the Contractor, including the Contract

Documents, which describes the Work to be done and the obligations between the parties.

CONTRACT DOCUMENTS, means the Solicitation Document and addenda thereto, Instructions to Bidders, Supplemental Instructions to Bidders, the Design/Build Contract, all Amendments (including, for example, change orders), WOU General Conditions, Supplemental General Conditions, if any, the accepted Bid, Plans, Specifications, and

Construction Change Directives.

CONTRACT PERIOD, as set forth in the Contract Documents, means the total period of time for a Project beginning with the full execution of this Contract and concluding upon Final Completion.

CONTRACT PRICE, means the total of the awarded Bid amount for a Project, as set forth in a Design/Build Contract and increased or decreased by the price of approved alternates or an Amendment, as indicated in the Contract Documents.

CONTRACT TIME, means any incremental period of time allowed under the Contract to complete any portion of the

Work as reflected in the Project schedule.

CONTRACTOR, means the Person awarded the Contract for the Work contemplated.

DAYS, are calendar days, including weekdays, weekends and holidays, unless otherwise specified.

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 4

DIRECT COSTS, means, unless otherwise provided in the Contract Documents, the cost of materials, including sales tax, cost of delivery; cost of labor, including social security, Medicare and unemployment insurance, and fringe benefits required by agreement or custom; worker's compensation insurance; any Project-specific insurance required by the Contract

Documents (including, without limitation, Builder’s Risk Insurance and Builder’s Risk Installation Floater); bond premiums, rental cost of equipment, and machinery required for execution of the Work; and the additional costs of field personnel directly attributable to the Work.

FINAL COMPLETION, means the final completion, or the date of final completion, of all requirements of Design/Build

Contract with respect to a Project, including Contract Closeout as described in Section K, but excluding Warranty Work as described in Section I.2, and the final payment and release of all retainage, if any, released.

FORCE MAJEURE, means an act, event or occurrence caused by fire, riot, war, acts of God, nature, sovereign, or public enemy, strikes, freight embargoes or any other act, event or occurrence that is beyond the control of the party to this

Contract who is asserting Force Majeure.

GMP, means Guaranteed Maximum Price that the Owner is responsible to pay related to a scope of Work identified in an early work Amendment or GMP Amendment.

MWESB REPORT, means an accurate report by the Contractor to the Owner, pursuant to Owner’s policy titled “Equity

Contracting Purchasing and Data,” identifying all Minority, Women and Emerging Small Business (MWESB) enterprises, as those terms are defined in ORS 200.005, receiving direct contracts with the Contractor or a Subcontractor, to perform one or more items of the Work throughout the course of the Work. MWESB Reports are required at the completion of every contract and annually as of July 1 for contracts that extend past June 30 of each year (see Section E.2.9) and as a condition of final payment (see Section K.1). Each report shall be in the form required by the Owner and shall contain the information required by Owner’s policies and procedures as amended from time to time.

OVERHEAD, means those items which may be included in the Contractor's markup (general and administrative expense and profit) and that shall not be charged as Direct Cost of the Work in accordance with these WOU General Conditions, including without limitation such Overhead expenses as wages or salary of personnel primarily at the Contractor’s principle place of business, Contractor's office costs and supplies at Contractor’s principal place of business, and Commercial

General Liability Insurance, and Automobile Liability Insurance.

OWNER, means Western Oregon University. Owner may elect, by written notice to Contractor, to delegate certain duties to more than one party, including without limitation, to an Architect/Engineer. However, nothing in these WOU General

Conditions is intended to abrogate the separate design professional responsibilities of Architects under ORS Chapter 671 or of Engineers under ORS Chapter 672.

PERSON, means a natural person or entity doing business as a sole proprietorship, a partnership, a joint venture, a corporation, a limited liability company or partnership, or any other entity possessing the legal capacity to contract.

PLANS, means the drawings which show the location, type, dimensions, and details of the Work to be done under the

Contract.

PROJECT, means a specific project for which the Contractor will perform Work pursuant to a Design/Build contract and in accordance with the Contract Documents.

PUNCH LIST, means the list of Work yet to be completed or deficiencies which need to be corrected in order to achieve

Final Completion of the Contract.

RECORD DOCUMENT, means the as-built Plans (in either electronic or hardcopy format), Specifications, testing and inspection records, Product Data, Samples, manufacturer and distributor/supplier warranties evidencing transfer of ownership to Owner, operational and maintenance manuals, Shop Drawings, Construction Change Directives, MWESB

Reports, correspondence, certificate(s) of occupancy, and other documents listed in Subsection B.9.1 of these WOU

General Conditions, recording all Services performed.

SOLICITATION DOCUMENT, means Instructions to Bidders or a Request for Proposal or a Request for Qualifications.

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 5

SPECIFICATION, means any description of the physical or functional characteristics of the Work, or of the nature of a supply, service or construction item. Specifications may include a description of any requirement for inspecting, testing or preparing a supply, service or construction item for delivery and the quantities or qualities of materials to be furnished under the Contract. Specifications generally will state the results or products to be obtained and may, on occasion, describe the method and manner of doing the Work to be performed. Specifications may be included in the Contract, incorporated in the Contract by reference, or attached to the Contract.

SUBCONTRACTOR, means a Person having a direct contract with the Contractor, or another Subcontractor, to perform one or more items of the Work.

SUBSTANTIAL COMPLETION, means the date when the Owner accepts in writing the Project, alteration or repair of the improvement to real property constituting the Work, or any designated portion thereof as having reached that state of completion when it may be used or occupied for its intended purpose. The Owner will only provide written acceptance of a

Project that includes facilities with operating systems if, along with satisfactory completion of all other portions of the

Project, the operating systems complete thirty (30) continuous Days of successful, trouble-free operation as provided in

Section K. The 30-Day period for successful operation of operating systems will begin on the Day Owner receives documentation of the date the operating systems began operating and were fully operational.

SUBSTITUTIONS, means items that in function, performance, reliability, quality, and general configuration are the same or better than the product(s) specified. Approval of any substitute item shall be solely determined by the Owner. The decision of the Owner is final.

SUPPLEMENTAL GENERAL CONDITIONS, means a Supplemental General Conditions to the WOU General

Conditions or a similar Amendment to the WOU General Conditions that includes conditions that remove from, add to, or modify these WOU General Conditions. Supplemental General Conditions may be included in the Solicitation Document or may be a separate attachment to the Contract.

WARRANTY WORK, means Contractor’s correction of defective Work pursuant to Section I.2.

WORK, means performance of construction-related services, including the furnishing of all materials, equipment, labor, transportation, services and incidentals necessary to successfully complete, as applicable, any individual item, Project, or the entire Contract and the carrying out of duties and obligations imposed by the Contract Documents.

A.2 SCOPE OF WORK

The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction work in connection with any Project described in the Contract

Documents. The Contractor shall perform all Work necessary so that the Project can be legally occupied and fully used for the intended use as set forth in the Contract Documents.

A.3 INTERPRETATION OF CONTRACT DOCUMENTS

A.3.1 Unless otherwise specifically defined in the Contract Documents, words which have well-known technical meanings or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings.

Contract Documents are intended to be complementary. Whatever is called for in one, is interpreted to be called for in all. However, in the event of conflicts or discrepancies among the Contract Documents, interpretations will be based on the following descending order of precedence:

(a) Contract, Amendments, and Construction Change Directives, with those of later date having precedence over those of an earlier date;

(b) The Supplemental General Conditions;

(c) The Design/Build Contract; WOU General Conditions;

(d) Division One (General Requirements) of the Specifications;

(e) Detailed schedules of finishes, equipment and other items included in the Specifications;

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 6

(f) Plans and Specifications (other than Division One and the Detailed Schedules to the Specifications);

(g) Large-scale drawings on Plans;

(h) Small-scale drawings on Plans;

(i) Dimension numbers written on Plans which shall prevail and take precedence over dimensions scaled from Plans;

(j) The Solicitation Document, and any addenda thereto;

(k) The accepted Bid.

A.3.2 In the case of an inconsistency between Plans and Specifications or within either document not clarified by

Amendment, the better quality or greater quantity of Work shall be provided in accordance with the Owner's interpretation in writing.

A.3.3 If the Contractor finds discrepancies in, or omissions from the Contract Documents, or if the Contractor is in doubt as to their meaning, the Contractor shall at once notify the Owner. Matters concerning and interpretation of requirements of the Contract Documents will be decided by the Owner, who may delegate that duty in some instances to the Architect/Engineer. Responses to Contractor's requests for interpretation of Contract Documents will be made in writing by Owner (or the Architect/Engineer, if so delegated) within any time limits agreed upon or otherwise with reasonable promptness. Interpretations and decisions of the Owner (or Architect/Engineer, if so delegated) will be consistent with the intent of and reasonably inferable from the Contract Documents. Contractor shall not proceed without direction in writing from the Owner (or Architect/Engineer, if so delegated).

A.3.4 References to standard specifications, manuals, codes of any technical society, organization or association, to the laws or regulations of any governmental authority, or any other Applicable Law, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, laws or regulations in effect in the jurisdiction where the Project is occurring on the first published date of the Solicitation Document, except as may be otherwise specifically stated.

A.4 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE

A.4.1 It is understood that the Contractor, before submitting a Bid, has made a careful examination of the Contract

Documents; has become fully informed as to the quality and quantity of materials and the character of the Work required; and has made a careful examination of the location and conditions of the Work and the sources of supply for materials. The Owner will in no case be responsible for any loss or for any unanticipated costs that may be suffered by the Contractor as a result of the Contractor's failure to acquire full information in advance in regard to all conditions pertaining to the Work. No oral agreement or conversation with any officer, agent, or personnel of the

Owner, or with the Architect/Engineer either before or after the execution of this Contract, shall affect or modify any of the terms or obligations herein contained.

A.4.2 Should the Plans or Specifications fail to particularly describe the materials, kind of goods, or details of construction of any aspect of the Work, Contractor shall have the duty to make inquiry of the Owner and Architect/Engineer as to what is required prior to performance of the Work. Absent Specifications to the contrary, the materials or processes that would normally be used to produce first quality finished Work shall be considered a part of the Contract requirements.

A.4.3 Any design errors or omissions noted by the Contractor shall be reported promptly to the Owner, including without limitation, any nonconformity with Applicable Laws.

A.4.4 If the Contractor believes that adjustments to cost, Contract Price, or Contract Time is involved because of clarifications or instructions issued by the Owner (or Architect/Engineer, if so delegated) in response to the

Contractor’s notices or requests for information, the Contractor must submit a written request to the Owner, setting forth the nature and specific extent of the request, including all time and cost impacts against the Contract as soon as possible, but no later than thirty (30) Days after receipt by Contractor of the clarifications or instructions issued. If the

Owner denies Contractor’s request for additional compensation, additional Contract Time, or other relief that

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 7

Contractor believes results from the clarifications or instructions, the Contractor may proceed to file a Claim under

Section D.3, Claims Review Process. If the Contractor fails to perform the obligations of Sections A.4.1 to A.4.3, the

Contractor shall pay such costs and damages to the Owner as would have been avoided if the Contractor had performed such obligations.

A.5 INDEPENDENT CONTRACTOR STATUS

The Work to be performed by the Contractor and all Subcontractors under this Contract are those of an independent contractor as defined in ORS 670.600. Contractor represents and warrants that it is not an officer, employee or agent of the

Owner as those terms are used in ORS 30.265.

A.6 RETIREMENT SYSTEM STATUS AND TAXES

Contractor represents and warrants that it is not a contributing member of the Public Employees' Retirement System and will be responsible for any federal or state taxes applicable to payment received under this Contract. Contractor will not be eligible for any employee, retirement, or fringe benefits as a result of Owner’s Contract payments. For example, Contractor will not be eligible for such benefits as federal Social Security, employment insurance, workers' compensation or the Public Employees' Retirement System, except as a self-employed individual. Unless the Contractor is subject to backup withholding, Owner will not withhold from such payments any amount(s) to cover Contractor’s federal or state tax obligations.

A.7 GOVERNMENT EMPLOYMENT STATUS

A.7.1 If this payment is to be charged against federal funds, Contractor represents and warrants that it is not currently employed by the Federal Government. This does not preclude the Contractor from holding another contract with the

Federal Government.

A.7.2 Contractor represents and warrants that Contractor is not an employee of the Owner for purposes of performing

Work under this Contract.

SECTION B

ADMINISTRATION OF THE CONTRACT

B.1 OWNER’S ADMINISTRATION OF THE CONTRACT

B.1.1 The Owner shall administer the Contract as described in the Contract Documents (1) during construction, (2) until final payment is due, and (3) during the one-year period for correction of Work. The Owner will act as provided in the Contract Documents, unless modified in writing by an Amendment in accordance with other provisions of the

Contract. In performing these tasks, the Owner may rely on the Architect/Engineer or other consultants to perform some or all of these tasks.

B.1.2 The Owner will visit the Project site at intervals appropriate to the stage of the Contractor’s operations (1) to become generally familiar with and to keep the Owner informed about the progress and quality of the portion of the Work completed, (2) to endeavor to guard the Owner against defects and deficiencies in the Work, and (3) to determine in general if Work is being performed in a manner indicating that the Work, when fully completed, will be in accordance with the Contract Documents. The Owner will not make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. The Owner will neither have control over or charge of, nor be responsible for the construction means, methods, techniques, sequences or procedures, or for the safety precautions and programs in connection with the Work.

B.1.3 Except as otherwise provided in the Contract Documents or when direct communications have been specifically authorized, the Owner and Contractor shall communicate with each other about matters arising out of or relating to the

Contract. Communications by and with the Architect/Engineer’s consultants shall be through the Architect/Engineer.

Communications by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate contractors shall be through the Owner.

B.1.4 Based upon the Architect/Engineer’s evaluations of the Contractor’s application for payment, or unless otherwise stipulated by the Owner, the Architect/Engineer will review and certify the amounts due the Contractor.

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 8

B.2 CONTRACTOR'S MEANS AND METHODS; MITIGATION OF IMPACTS

B.2.1 The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract Documents give other specific instructions concerning these matters. If the Contract Documents give specific instructions concerning construction means, methods, techniques, sequences or procedures, the Contractor shall evaluate the Project site safety thereof and, except as stated below, shall be fully and solely responsible for the Project site safety of such means, methods, techniques, sequences or procedures.

B.2.2 The Contractor is responsible to protect and maintain the Work during the course of construction and to mitigate any adverse impacts to the Project, including those caused by Amendments, Construction Change Directives, and other authorized changes, which may affect cost, schedule, or quality.

B.2.3 The Contractor is responsible for the actions of all its employees, personnel, laborers, suppliers, and Subcontractors on the Project. The Contractor shall enforce strict discipline and good order among Contractor’s employees and other persons carrying out the Work. The Contractor shall not permit employment of persons who are unfit or unskilled for the tasks assigned to them.

B.3 MATERIALS AND WORKMANSHIP

B.3.1 The intent of the Contract Documents is to provide for the construction and completion in every detail of the Work for each Project described. All Work shall be performed in a professional manner and unless the means or methods of performing a task are specified elsewhere in the Contract Documents, Contractor shall employ methods that are generally accepted and used by the industry, in accordance with industry standards.

B.3.2 The Contractor is responsible to perform the Work as required by the Contract Documents. Defective Work shall be corrected at the Contractor's expense.

B.3.3 Work done and materials furnished shall be subject to inspection and/or observation and testing by the Owner to determine if they conform to the Contract Documents. Inspection of the Work by the Owner does not relieve the

Contractor of responsibility for the Work in accordance with the Contract Documents.

B.3.4 Contractor shall furnish adequate facilities, as required, for the Owner to have safe access to the Work including without limitation walkways, railings, ladders, tunnels, and platforms. Producers, suppliers, and fabricators shall also provide proper facilities and access to their facilities.

B.3.5 The Contractor shall furnish Samples of materials for testing by the Owner and include the cost of the Samples in the

Contract Price.

B.4 PERMITS

Contractor shall obtain and pay for all necessary permits, licenses and fees, except for those specifically excluded in the Supplemental General Conditions, for the construction of the Work, for temporary obstructions, enclosures, opening of streets for pipes, walls, utilities, environmental Work, etc., as required for the Project. Contractor shall be responsible for all violations of Applicable Law in connection with the Work or caused by obstructing streets, sidewalks or otherwise.

Contractor shall give all requisite notices to public authorities. Notwithstanding the first sentence of this paragraph, Owner shall pay for the following: Plan check fees and permit fees required for the general building permit, systems development charges, and building department inspection fees. Notwithstanding the foregoing, however, Contractor shall obtain all additional permits, licenses and fees required for the construction of the Work.

B.5 COMPLIANCE WITH GOVERNMENT REGULATIONS

B.5.1 Contractor shall comply with Applicable Laws pertaining to the Work for the Project and the Contract Documents both in the conduct of Contractor’s business and in its performance of the Work. Failure to comply with such requirements shall constitute a breach of the Contract and shall be grounds for Contract termination. Specifically, but without limiting the foregoing, Contractor understands that Applicable Laws require all new construction to be

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 9 accessible to individuals with physical limitations, and any failure of the Project to conform to such Applicable Laws due Contractor’s failure to properly perform the Work constitute a breach of the Contract by Contractor and shall be grounds for Contract termination. Without limiting the generality of the foregoing, Contractor expressly agrees to comply with the following, as applicable:

(i) Title VI and VII of Civil Rights Act of 1964, as amended; (ii) Sections 503 and 504 of the Rehabilitation Act of

1973, as amended; (iii) the Health Insurance Portability and Accountability Act of 1996; (iv) the Americans with

Disabilities Act of 1990, as amended; (v) ORS Chapter 659A; as amended; (vi) ORS 279C.800 through 279C.870, as amended; (vii) applicable Oregon Building Codes; (viii) all regulations and administrative rules established pursuant to the foregoing laws; (ix) all laws, regulations, policies, and procedures specifically made applicable by reference in this Contract; and (x) all other Applicable Laws, including, but not limited to, applicable requirements of federal and state civil rights and rehabilitation statutes, rules and regulations, and Owner’s policies and procedures.

B.5.2 Contractor shall comply with all applicable requirements of federal and state civil rights and rehabilitation statutes, rules and regulations, and

(a) Contractor shall not discriminate against Disadvantaged, Minority, Women or Emerging Small Business enterprises, as those terms are defined in ORS 200.005, or a business enterprise that is owned or controlled by or that employs a disabled veteran, as that term is defined in ORS 408.225, in the awarding of subcontracts.

(b) Contractor shall maintain, in current and valid form, all licenses and certificates required by Applicable Laws or this Contract when performing the Work for each Project.

B.5.3 Unless contrary to federal law, Contractor shall certify that it shall not accept a bid from Subcontractors to perform

Work as described in ORS 701.005 under this Contract unless such Subcontractors are registered with the

Construction Contractors Board in accordance with ORS 701.035 to 701.055 at the time they submit their bids to the

Contractor.

B.5.4 Unless contrary to federal law, Contractor shall certify that each landscape contracting business, as defined in ORS

671.520(2), performing Work under this Contract holds a valid landscape contractor's license issued pursuant to ORS

671.560.

B.5.5 The following notice is applicable to Contractors who perform excavation Work. “ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-

001-0010 through OAR 952-001-0090. You may obtain copies of the rules by calling the center at (503)232-1987.”

B.5.6 Failure to comply with any or all of the requirements of B.5.1 through B.5.5 shall be a breach of Contract and constitute grounds for Contract termination. Damages or costs resulting from such noncompliance shall be the responsibility of Contractor.

B.6 SUPERINTENDENCE

Contractor shall keep on the Project site, during the progress of the Work, a competent superintendent and any necessary assistants who shall be satisfactory to the Owner and who shall represent the Contractor on the Project site.

Directions given to the superintendent by the Owner shall be confirmed in writing to the Contractor.

B.7 INSPECTION

B.7.1 Owner shall have access to the Work at all times.

B.7.2 Inspection of the Work will be made by the Owner at its discretion. The Owner will have authority to reject Work that does not conform to the Contract Documents. Any Work found to be not in conformance with the Contract

Documents, in the discretion of the Owner, shall be removed and replaced at the Contractor's expense.

B.7.3 Contractor shall make or obtain at the appropriate time all tests, inspections and approvals of portions of the Work required by the Contract Documents or by Applicable Laws or orders of public authorities having jurisdiction. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 10 bear all related costs of tests, inspections and approvals. Tests or inspections conducted pursuant to the Contract

Documents shall be made promptly to avoid unreasonable delay in the Work. The Contractor shall give the Owner timely notice of when and where tests and inspections are to be made so that the Owner may be present for such procedures. Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract

Documents, be secured by the Contractor and promptly delivered to the Owner.

B.7.4 As required by the Contract Documents, Work done or material used without required inspection or testing and/or without providing timely notice to the Owner may be ordered removed at the Contractor's expense.

B.7.5 If directed to do so any time before the Work is accepted, the Contractor shall uncover portions of the completed

Work for inspection. After inspection, the Contractor shall restore such portions of Work to the standard required by the Contract. If the Work uncovered is unacceptable or was done without required testing or inspection or sufficient notice to the Owner, the uncovering and restoration shall be done at the Contractor's expense. If the Work uncovered is acceptable and was done with sufficient notice to the Owner, the uncovering and restoration will be paid for pursuant to any Amendment.

B.7.6 If any testing or inspection reveals failure of the portions of the Work to comply with requirements established by the Contract Documents, all costs made necessary by such failure, including those of repeated procedures and compensation for the Owner’s and Architect/Engineer’s services and expenses, shall be at the Contractor’s expense.

B.7.7 When the United States government participates in the cost of the Work, or the Owner has an agreement with other public or private organizations, or if any portion of the Work is being performed for a third party or in close proximity to third party facilities, representatives of these organizations shall have the right to inspect the Work affecting their interests or property. Their right to inspect shall not make them a party to the Contract and shall not interfere with the rights of the parties of the Contract. Instructions or orders of such parties shall be transmitted to the Contractor through the Owner.

B.8 SEVERABILITY

If any provision of this Contract is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected and the rights and obligations of the parties shall be construed and enforced as if the Contract did not contain the particular provision held to be invalid.

B.9 ACCESS TO RECORDS

B.9.1 Contractor shall keep, at all times on the Project site, one record copy (in either electronic or hardcopy format) of the complete Contract Documents, including the Plans, Specifications, Construction Change Directives, Amendments, and addenda, in good order and marked currently to record field changes and selections made during construction, and one record copy of Shop Drawings, Product Data, Samples (each as defined in Section B.18.1. hereafter) and similar submittals, and shall at all times give the Owner access thereto.

B.9.2 Contractor shall retain and the Owner and its duly authorized representatives shall have access, for a period not less than ten (10) years, to all Record Documents, financial and accounting records, and other books, documents, papers and records of Contractor which are pertinent to the Contract, including records pertaining to Overhead and indirect costs, for the purpose of making audit, examination, excerpts and transcripts. If for any reason, any part of the Work or this Contract shall be subject to litigation, Contractor shall retain all such records until all litigation is resolved and

Contractor shall continue to provide Owner and/or its agents with full access to such records until such time as all litigation is complete and all periods for appeal have expired and full and final satisfaction of any judgment, order or decree is recorded and Owner receives a record copy of documentation from Contractor.

B.10 WAIVER

Failure of the Owner to enforce any provision of this Contract shall not constitute a waiver or relinquishment by the

Owner of the right to such performance in the future nor of the right to enforce any other provision of this Contract.

B.11 SUBCONTRACTS AND ASSIGNMENT

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 11

B.11.1 Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound by the terms and conditions of these WOU General Conditions, and to assume toward the Contractor all of the obligations and responsibilities which the Contractor assumes toward the Owner thereunder, unless (1) the same are clearly inapplicable to the subcontract at issue because of legal requirements or industry practices, or (2) specific exceptions are requested by Contractor and approved in writing by Owner. Where appropriate, Contractor shall require each Subcontractor to enter into similar agreements with sub-subcontractors at any level.

B.11.2 At Owner’s request, Contractor shall submit to Owner prior to their execution either Contractor’s form of subcontract, or the subcontract to be executed with any particular Subcontractor. If Owner disapproves such form, Contractor shall not execute the form until the matters disapproved are resolved to Owner’s satisfaction. Owner’s review, comment upon or approval of any such form shall not relieve Contractor of its obligations under this

Agreement or be deemed a waiver of such obligations of Contractor.

B.11.3 Contractor shall not assign, sell, or transfer its rights, or delegate its responsibilities under this Contract, in whole or in part, without the prior written approval of the Owner. No such written approval shall relieve Contractor of any obligations of this Contract, and any transferee shall be considered the agent of the Contractor and bound to perform in accordance with the Contract Documents. Contractor shall remain liable as between the original parties to the

Contract as if no assignment had occurred.

B.12 SUCCESSORS IN INTEREST

The provisions of this Contract shall be binding upon and shall accrue to the benefit of the parties to the Contract and their respective permitted successors and assigns.

B.13 OWNER'S RIGHT TO DO WORK

Owner reserves the right to perform other or additional work at or near the Project site with other forces than those of the Contractor. If such work takes place within or next to the Project site, Contractor shall coordinate work with the other contractors or forces, cooperate with all other contractors or forces, carry out the Work in a way that will minimize interference and delay for all forces involved, place and dispose of materials being used so as not to interfere with the operations of another, and join the Work with the work of the others in an acceptable manner and perform it in proper sequence to that of the others. The Owner will resolve any disagreements that may arise between or among Contractor and the other contractors over the method or order of doing all work (including the Work). In case of unavoidable interference, the Owner will establish work priority (including the Work) which generally will be in the sequence that the contracts were awarded.

B.14 OTHER CONTRACTS

In all cases and at any time, the Owner has the right to execute other contracts related to or unrelated to the Work of this Contract. The Contractor shall fully cooperate with any and all other contractors without additional cost to the Owner in the manner described in section B.13.

B.15 GOVERNING LAW

This Contract shall be governed by and construed in accordance with the laws of the State of Oregon without regard to principles of conflict of laws.

B.16 LITIGATION

Any Claim between Owner and Contractor that arises from or relates to this Contract and that is not resolved through the Claims Review Process in Section D.3 shall be brought and conducted solely and exclusively within the Circuit Court of Lane County for the State of Oregon; provided, however, if a Claim must be brought in a federal forum, then it shall be brought and conducted solely and exclusively within the United States District Court for the District of Oregon. In no event shall this section be construed as a waiver by the State of Oregon on any form of defense or immunity, whether sovereign immunity, governmental immunity, immunity based on the Eleventh Amendment to the Constitution of the

United States or otherwise, from any claim or from the jurisdiction of any court. CONTRACTOR, BY EXECUTION OF

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 12

THIS CONTRACT, HEREBY CONSENTS TO THE IN PERSONAM JURISDICTION OF THE COURTS

REFERENCED IN THIS SECTION B.16.

B.17 ALLOWANCES

B.17.1 The Contractor shall include in the Contract Price all allowances stated in the Contract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct.

B.17.2 Unless otherwise provided in the Contract Documents:

(a) when finally reconciled, allowances shall cover the cost to the Contractor of materials and equipment delivered at the Project site and all required taxes, less applicable trade discounts;

(b) Contractor’s costs for unloading and handling at the Project site, labor, installation costs, Overhead, profit and other expenses contemplated for stated allowance amounts shall be included in the Contract Price but not in the allowances;

(c) whenever costs are more than or less than allowances, the Contract Price shall be adjusted accordingly by

Amendment. The amount of the Amendment shall reflect (i) the difference between actual costs and the allowances under Section B.17.2(a) and (2) changes in Contractor’s costs under Section B.17.2(b).

(d) Unless Owner requests otherwise, Contractor shall provide to Owner a proposed fixed price for any allowance work prior to its performance.

B.18 SUBMITTALS, SHOP DRAWINGS, PRODUCTDATA AND SAMPLES

B.18.1 The Contractor shall prepare, submit to the Owner, and keep current, for the Architect’s/Engineer’s approval (or for the approval of Owner if approval authority has not been delegated to the Architect/Engineer), a schedule and list of submittals which is coordinated with and identified on the Contractor's construction schedule and allows the

Architect/Engineer and Owner reasonable time to review submittals. Owner reserves the right to finally approve the schedule and list of submittals. Owner will return to the Contractor a list of the submittal documents that the Owner will review simultaneously with the Architect’s/Engineer’s review. Submittals include, without limitation, Shop

Drawings, Product Data, and Samples which are described below:

(a) “Shop Drawings” are drawings, diagrams, schedules and other data specially prepared for the Work by the

Contractor or a Subcontractor (including any sub-subcontractor), manufacturer, supplier or distributor to illustrate some portion of the Work.

(b) “Product Data” are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work.

(c) “Samples” are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged.

B.18.2 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. The purpose of their submittal is to demonstrate, for those portions of the Work for which submittals are required by the Contract

Documents, the way by which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents. Review of submittals by the Architect/Engineer or Owner is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, or for approval of safety precautions or, unless otherwise specifically stated by the Architect/Engineer, of any construction means, methods, techniques, sequences or procedures, all of which remain the responsibility of the Contractor as required by the

Contract Documents. The Architect/Engineer’s or Owner’s review of the Contractor’s submittals shall not relieve the

Contractor of its obligations under the Contract Documents. The Architect/Engineer’s or Owner’s approval of a specific item shall not indicate approval of an assembly of which the item is a component. Informational submittals upon which the Architect/Engineer is not expected to take responsive action may be so identified in the Contract

Documents. Submittals which are not required by the Contract Documents may be returned by the

Architect/Engineer without action.

General Conditions for Design/Build Services Contracts REV 08/14/2026 Page 13

B.18.3 The Contractor shall review for compliance with the Contract Documents, approve and submit to the

Architect/Engineer Shop Drawings, Product Data, Samples and similar submittals required by the Contract

Documents with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of separate contractors. Submittals which are not marked as reviewed for compliance with the Contract

Documents and approved by the Contractor may be returned by the Architect/Engineer without action.

B.18.4 By approving and submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents that the Contractor has determined and verified materials, field measurements and field construction criteria related thereto, or will do so, and has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents.

B.18.5 The Contractor shall perform no portion of the Work for which the Contract Documents require submittal and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been approved by the Architect/Engineer.

B.18.6 The Work shall be in accordance with approved submittals except that the Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect/Engineer or Owner’s review or approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed the Architect/Engineer in writing of such deviation at the time of submittal and (i) the

Architect/Engineer has given written approval to the specific deviation as a minor change in the Work, or (ii) an

Amendment or Construction Change Directive has been executed by Owner authorizing the deviation. The

Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by the Architect/Engineer or Owner’s review or approval thereof.

B.18.7 In the event that Owner elects not to have the obligations and duties described under this Section B.18 performed by the Architect/Engineer, or in the event no Architect/Engineer is employed by Owner on the Project, all obligations and duties assigned to the Architect/Engineer hereunder shall be performed by the Owner.

B.19 SUBSTITUTIONS

The Contractor may make Substitutions only with the consent of the Owner, after evaluation by the Owner and only in accordance with an Amendment or Construction Change Directive. Substitutions shall be subject to the requirements of the Bid documents. By making requests for Substitutions, the Contractor: represents that the Contractor has personally investigated the proposed substitute product; represents that the Contractor will provide the same warranty for the

Substitution that the Contractor would for the product originally specified unless approved otherwise; certifies that the cost data presented is complete and includes all related costs under this Contract including redesign costs, and waives all claims for additional costs related to the Substitution which subsequently become apparent; and will coordinate the installation of the accepted Substitution, making such changes as may be required for the Work to be completed in all respects.

B.20 USE OF PLANS AND SPECIFICATIONS

Plans, Specifications and related Contract Documents furnished to Contractor by Owner or Owner’s

Architect/Engineer shall be used solely for the performance of the Work under this Contract. Contractor and its

Subcontractors and suppliers are authorized to use and reproduce applicable portions of such documents appropriate to the execution of the Work, but shall not claim any ownership or other interest in them beyond the scope of this Contract, and no such interest shall attach. Unless otherwise indicated, all common law, statutory and other reserved rights, in addition to copyrights, are retained by Owner.

B.21 FUNDS AVAILABLE AND AUTHORIZED

Owner reasonably believes at the time of entering into this Contract that sufficient funds are available and authorized for expenditure to finance the cost of this Contract within the Owner's appropriation or limitation.

This is the start of the file's text. The full file is on GovTribe.