Exhibit N. Tenant Improvements Cost Summary (TICS) Table (Jul.2022). Huntingdon County.xlsx

XLSX spreadsheet 394 KB Posted

Attached to
X1DZ--Space for Lease at Huntingdon County, PA for 20, 162 Rentable / 14, 935 Net Usable Square Feet
Solicitation number
36C24423R0004
Issued by

About this file

This document is an Excel workbook template for preparing a Tenant Improvements Cost Summary (TICS) table for a federal lease solicitation. The solicitation is for 20,162 rentable square feet and 14,935 net usable square feet of space in Huntingdon County, Pennsylvania. The agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4.

The workbook contains instructions and templates for inputting project details and line item costs by MasterFormat division for tenant improvements and shell buildout. Required inputs include the net usable square footage, general contractor and lessor project management fees, and architectural and engineering fees. Divisions cover site work, construction, utilities, security systems, communications, furniture and more. Costs should distinguish tenant improvement from shell items. The completed TICS table auto-populates to summarize total project costs per square foot.

View the file

Other files

File Type Posted
36C24423R0004_4.docx DOCX document
36C24423R0004 Amendment 0003.pdf PDF
Exhibit D. GSA Template 3516 Solicitation Provisions (Oct. 2023). Huntingdon.pdf PDF
Exhibit E. GSA Form 3517B General Clauses (Oct. 2023). Huntingdon.pdf PDF
36C24423R0004_3.docx DOCX document
RLP Amendment 0002.pdf PDF
Attachment 1. Questions_Answers. Huntingdon County.pdf PDF
Attachment 2. Huntingdon CBOC Pre-Proposal Presentation REV 10-4-23.pdf PDF
Attachment 2. Questions_Answers. Huntingdon County.pdf PDF
36C24423R0004_2.docx DOCX document
36C24423R0004 0001 Amendment.pdf PDF
Attachment 1. Pre-Proposal Meeting. Huntingdon County.pdf PDF
Exhibit D. GSA Form 3516 SOLICITATION PROVISIONS July 2021. Huntingdon County.pdf PDF
Exhibit B. Agency Specific Requirements. Huntingdon County.pdf PDF
Exhibit I. Addendum to SAM Rep and Cert. Huntingdon County.pdf PDF
Exhibit X. Interior Signage. Huntingdon County.pdf PDF
Attachment 1. Past Performance Questionnaire. Huntingdon County PA.docx DOCX document
Exhibit E. GSA Form 3517B (Sep2022) General Clauses. Huntingdon County.pdf PDF
36C24423R0004_1.docx DOCX document
Exhibit AB. FAR 52.204-27 Prohibition on a ByteDance Covered Application.pdf PDF
Exhibit C. Security Requirements (FSL Level II) (Aug. 2022). Huntingdon County.pdf PDF
Exhibit F. GSA Form 1364 Proposal to Lease Space (Apr. 22). Huntingdon County.pdf PDF
Exhibit W. Program Management Plan. Huntingdon County.pdf PDF
Exhibit G. GSA Form 1217 Lessor Annual Cost. Huntingdon County.pdf PDF
Exhibit L. Unit Price List. Huntingdon County.pdf PDF
Exhibit Q. Space Requirement. Huntingdon County.pdf PDF
Exhibit A. Global Lease L100 (Oct. 2022) - 36C24423L0004 - Huntingdon County.pdf PDF
Exhibit M. DOL Wage Determination REV 9-15-23. Huntingdon County.pdf PDF
Exhibit K. Security Unit Price List FSL II (Jun. 2022). Huntingdon County.xlsx XLSX spreadsheet
Exhibit AA. FAR 52.204-24 Representation Digital Rev 10 20. Huntingdon County.pdf PDF
Exhibit H. GSA Form 1200 Prelease FPLS Evaluation (Part A _ Part B) (May 2015). Huntingdon County.pdf PDF
Global Request for Lease Proposal (RLP) R100 (Oct. 2022). 36C24423R0004 Huntingdon County.pdf PDF
Exhibit P. Government Typical Building Layout. Huntingdon County.pdf PDF
Exhibit O - Contract Submittal Schedule. Huntingdon County.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

INSTRUCTIONS
TICS tab is locked - it is the main deliverable for this workbook and is populated by completing the 'INPUT' tab and numbered Masterformat CSI division tabs along the bottom of the page.
Read and understand the 'SHELL' tab.
Input project specific information as appropriate in the light blue fields of the 'INPUT' tab, in order to auto-populate the TICS worksheet. This includes ANSI-BOMA Office Area (ABOA) square footage, General Contractor Fee, Lessor's Project Management Fee, and A/E Fees. Note that some of these fees are already established under the lease agreement and must be used when completing this worksheet.
Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.
Material
DescriptionAccurately describe each item being priced.
QuantityList the quantity e.g., 1, 2, 3, etc.
Unit(Example) LS,EA,GAL,LF, SF, etc.
CostAmount per one unit
TotalTotal cost of all material.
Labor
HoursTime projected to perform the task.
Labor RateCost per hour of labor.
TotalCost of labor.
TOTAL Combines overall materials and labor.

Tenant Improvements (TI)

TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.

1. Fill out light blue fields categorized Tenant Improvements (TI), inputting only costs associated with TI.

2. Fill each division tab 1-33 as needed for the construction to be performed under the TI costs as indicated above.

Shell

1. Fill out light blue fields categorized SHELL, inputting only costs associated with shell as defined in the 'SHELL' tab.

2. Fill each division tab 1-33 as needed for the construction to be preformed under the SHELL cost as indicated above.

DIVISION 9 - FINISHESFOR:DATE PREPARED:
Project or Lease #1/1/22
Tentant Improvement (TI) Cost Estimate for Division 9
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
XYZ Paint1.00GAL.$25.00$25.002.50$36.25$90.63
$0.00$0.00
$0.00$0.00
Material Total:$25.00Labor Total:$90.63
TOTAL TI MATERIAL & LABOR:$115.63
Shell Cost Estimate for Division 9
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
ABC Paint10.00GAL.$27.00$270.006.00$36.25$217.50
$0.00$0.00
$0.00$0.00
Material Total:$270.00Labor Total:$217.50
TOTAL SHELL MATERIAL & LABOR:$487.50

TICS

TENANT IMPROVEMENTS COST SUMMARY (TICS)
For:Huntingdon CBOCNUSF SF=14,935.00
Agency:VHATI PER ABOA SF=$ - 0
Location:Huntingdon County, PATOTAL TI=$ - 0
Common Area Factor:0.00%NUSF=14,935.00
Masterformat CSISystem ElementsTI*14935
Div 1General Requirements$ - 0$ - 0
Div 2Existing Conditions$ - 0$ - 0
Div 3Concrete$ - 0$ - 0
Div 4Masonry$ - 0$ - 0
Div 5Metals$ - 0$ - 0
Div 6Wood, Plastics, Composites$ - 0$ - 0
Div 7Thermal and Moisture Protection$ - 0$ - 0
Div 8Openings$ - 0$ - 0
Div 9Finishes$ - 0$ - 0
Div 10Specialties$ - 0$ - 0
Div 11Equipment$ - 0$ - 0
Div 12Furnishings$ - 0$ - 0
Div 13Special Construction$ - 0$ - 0
Div 14Conveying Equipment$ - 0$ - 0
Div 21Fire Suppression$ - 0$ - 0
Div 22Plumbing$ - 0$ - 0
Div 23Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Div 26.1Electrical$ - 0$ - 0
Div 26.2Lighting$ - 0$ - 0
Div 27Communications$ - 0$ - 0
Div 28.1Electronic Safety$ - 0$ - 0
Div 28.2Electronic Security (TI - Non-BSAC)$ - 0$ - 0
Div 31Earthwork$ - 0$ - 0
Div 32Exterior Improvements$ - 0$ - 0
Div 33Utilities$ - 0$ - 0
SubtotalTrade Costs$ - 0$ - 0
General Contractor FeePercent$ - 0$ - 0
SubtotalConstruction Costs$ - 0$ - 0
Architectural & Engineering Fees (NIC DID costs)Percent$ - 0$ - 0
Other Lessor Costs Established Under the Lease$ - 0$ - 0
SubtotalLessor's Costs:$ - 0$ - 0
Lessor's Project Management FeePercent$ - 0
TotalPrice to Government:GRAND TOTAL$ - 0
Cost per ABOA SF$ - 0$ - 0
Cost per NUSF$ - 0$ - 0
Notes:
*Include all subcontractors' costs.
**Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the 'SHELL' definitions tab, and the lease, for further information.

SHELL

Per GSA Pricing Desk Guide, 5th Edition.
Table 2-4. Shell Definition for General Use Buildings
Base BuildingOccupant Areas

Base structure and building enclosure components (windows with exterior finishes) are complete.

Broom-clean concrete floor slab, with a flat and level floor.

Base building mechanical, electrical and plumbing systems (e.g., central fire alarm, chiller plant, cooling tower) are complete and functional.

Gypsum wallboard, spackled and prime painted, on exterior perimeter walls and tenant demising walls, without suite entry door.

All common areas, such as lobbies, elevators, fire egress corridors and stairwells, garages, and service areas are complete. (Circulation corridors are provided as part of the base building only on multi- tenanted floors where the corridor is common to more than one tenant. On single tenant floors, only the fire egress corridor necessary to meet code is provided as part of the shell.)

Suspended acoustical ceiling system including grid and lay-in tiles (or other building standard). Lighting luminaires should be installed in the ceiling grid for an open office plan at the rate of one fixture per 80 USF.3 Lighting controls with ambient lighting adjusted per daylight availability, occupancy, vacancy, or other building automation system signals.

Building common restrooms are complete and operational.

Building cores on each floor with assignable space contain the following: tappable domestic water riser, service sanitary drain, sanitary vent, ready for extension to tenant- demised areas.

Electrical power distribution panels and circuit breakers available in an electrical closet, with capacity at 120/208 volt, 3- phase, 4-wire providing 4 watts per USF excluding lighting and HVAC.

Designated connection point to the central fire alarm system for extension to tenant- demised areas.

Distribution backboard within a wire closet for connection to tenant’s telephone lines. Vertical conduit (empty sleeve) through building core, available for tenant wiring and cabling Central heating, ventilation, and air conditioning (HVAC) systems are installed and operational, including, as appropriate, main and branch lines, variable air volume boxes, dampers, flex ducts and diffusers, for open office layout. Conditioned air through medium pressure ductwork at a rate of .75 cfm per square foot of usable area is provided.

Sprinkler mains and distribution piping in a protection layout (open plan) with heads turned down, concealed with an escutcheon or trim plate, are installed.

INPUT

INFORMATION NEEDED TO COMPLETE TICS TABLEFALSE
FALSE
LEASE 36C24423L0002 or ProjectHuntingdon CBOCFALSE
AgencyVHAFALSE
Location: City, StateHuntingdon, PAFALSE
FALSE
ABOA SF =14,935.00
TENANT IMPROVEMENT PER ABOA SF =$0.00General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum.
NUSF=14,935.00
DATE:
BasisAmountEnter percent values as decimals. Ex: Enter 0.06 for 6.00%.
Tenant Improvement General Contractor Fee
Shell General Contractor Fee
Tenant Improvement A/E Fees (per Lease)For A/E fees established as a cost per ABOA sf, convert rate to lump sum.
Shell A/E Fees
Lessor's TI Project Management Fee (per Lease)percent
TIShelllump sum
Other Lessor Costs Established Under the Lease

DIVISION 1 - General Requirements FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 1 (examples: superintendence, mob/demob, dust control, waste & dumpsters, temporary barriers & barricades)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 1 (examples: superintendence, mob/demob, dust control, waste & dumpsters, temporary barriers & barricades)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 2 - Existing Conditions FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 2 (examples: site work, demolition)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 2 (examples: demolition, survey, geotech, HAZMAT)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 3 - Concrete FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 3
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 3 (examples: foundations, columns, flatwork, beams)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 4 - Masonry FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 4
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 4 (examples: brick, block)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 5 - Metals FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 5 (examples: structural, grates, decking, joists, stairs, railings, custom fabrications)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 5 (examples: structural, grates, decking, joists, stairs, railings, custom fabrications)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 6 - WOOD, PLASTICS, COMPOSITES FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 6 (examples: wood framing, rough carpentry, sheathing, millwork, decking, paneling, stairs & railings)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 6 (examples: wood framing, rough carpentry, sheathing, millwork, decking, paneling, stairs & railings)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 7 - THERMAL & MOISTURE PROTECTION FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 7 (examples: roof Penetration/Patching, firestopping, joint sealants, caulking, dampproofing, insulation, weather barriers)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 7 (examples: roof Penetration/Patching, firestopping, joint sealants, caulking, dampproofing, insulation, weather barriers)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 8 - OPENINGS FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 8 (examples: doors, frames, hardware, louvers, windows, glazing, curtainwall)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 8 (examples: doors, frames, hardware, louvers, windows, glazing, curtainwall)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 9 - FINISHES FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 9 (examples: painting, carpeting, flooring & base, wall protection, walls)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 9 (examples: painting, carpeting, flooring & base, wall protection, walls)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 10 - SPECIALTIES FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 10 (examples: displays, signage, directory boards, movable partitions, wall and door protection, lockers, flagpoles, storage assemblies)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 10 (examples: displays, signage, directory boards, movable partitions, wall and door protection, lockers, flagpoles, storage assemblies)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 11 - EQUIPMENT FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 11 (examples: AV, lab, recreational, food, banking, medical, retail, parking, loading dock, and other equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 11 (examples: AV, lab, recreational, food, banking, medical, retail, parking, loading dock, and other equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 12 - FURNISHINGS FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 12 (examples: decorations, systems and office funiture, casework, countertops)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 12 (examples: decorations, systems and office funiture, casework, countertops)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 13 - SPECIAL CONSTRUCTION FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 13 (examples: pre-engineered & prefab structures)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 13 (examples: pre-engineered & prefab structures)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 14 - CONVEYING EQUIPMENT FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 14
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 14
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 21 - FIRE SUPPRESSION FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 21
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 21
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 22 - PLUMBING FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 22
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 22
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 23
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 23
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

26.1

DIVISION 26.1 - ELECTRICAL FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 26.1 (examples: conduit, wire, supports, boxes, fittings, terminations, outlets, cover plates, receptacles, power devices, panels & breakers, electrical equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 26.1 (examples: conduit, wire, supports, boxes, fittings, terminations, outlets, cover plates, receptacles, power devices, panels & breakers, electrical equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

26.2

DIVISION 26.2 - LIGHTING FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 26.2 (examples: lighting fixtures, wall switches, motion switches)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 26.2 (examples: lighting fixtures, wall switches, motion switches)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 27 - COMMUNICATIONS FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 27 (examples: Low Voltage cabling (CAT6, POE, Coax, HDMI, speaker), overhead speakers/intercom, sound-masking/white noise devices, jacks, punchdown, cover plates, cable trays/j-hooks, server racks (conduit & boxes see Div 26.1))
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 27
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

28.1

DIVISION 28.1 - ELECTRONIC SAFETY FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 28.1 (examples: Fire Alarm Only: wire, devices, smokes, heats, CO2, exit signs, addressing & testing)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 28.1
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

28.2

DIVISION 28.2 - ELECTRONIC SECURITY FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 28.2 (examples: duress, IDS, motion, video surveillance systems, CCTV, security scanning, glass break, alarm devices) SHOULD NOT include items required/itemized as BSAC on a Security Unit Price List, provided separately. SHOULD include items labeled TI on a Security Unit Price List.
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 28.2 SHOULD NOT include items required/itemized as BSAC on a Security Unit Price List, provided separately if necessary. SHOULD include items labeled SHELL on a Security Unit Price List.
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 31 - EARTHWORK FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 31
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 31
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

cornerstone

DIVISION 32 - EXTERIOR IMPROVEMENTS FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 32
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 32 (examples: site, civil, pavements, landscaping, walks, pedestals, fences, gates, permanent vehicle barriers, foundations, earthwork)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

DIVISION 33 - UTILITIES FOR: DATE PREPARED:

Tenant Improvement (TI) Cost Estimate for Division 33
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 33
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

File details come from the government source that posted it. Updated .