Exhibit M10- PV Service Schedule V5.pdf

PDF 270 KB Posted

Attached to
Amendment 0003 Full Maintenance Services Contract San Antonio, Pearsall, and New Federal Courthouse
Solicitation number
47PH0221R0004
Issued by

View the file

Other files

File Type Posted
SF30 Solicitation Amendment 47PH0221R0004 0003 2021 04 16.pdf PDF
San Antonio_Pearsall FM Spec 2021 04 15.pdf PDF
Changes to Solicitation 47PH0221R0004 Amendment 0002.pdf PDF
EXHIBIT C.1 Building Information Sheet_TX0501 San Antonio Federal Building_revised.pdf PDF
SF30 Solicitation Amendment 47PH0221R0004 0002 2021 04 15.pdf PDF
EXHIBIT C.1 Building Information Sheet_TX0503 AA Spears Judge Training Center_revised.pdf PDF
8 SA PROCUREMENT QUESTIONS ANSWERS.pdf PDF
9. Solicitation 47PH0221R0004 Pre-Proposal Conference Slides San Antonio & Pearsall.pptx.pdf PDF
3. RIVISED Figure B-3 Pricing of Services 47PH0221R0004.xlsx XLSX spreadsheet
5. SAN ANTONIO SITE VISIT SIGN IN SHEET 1.jpg JPG image
2. US Courthouse Commissioning Inspection Schedule.pdf PDF
4. SECOND SA SITE VISIT PHOTOS Zip File.zip ZIP file
7. Experience Worksheet - 47PH0221R0004 San Antonio Pearsall (1).pdf PDF
5. Second SAN ANTONIO SITE VISIT SIGN IN SHEET 2.jpg JPG image
10. SF30 Solicitation Amendment 47PH0221R0004 0001.pdf PDF
6. Changes to Solicitation 47PH0221R0004.pdf PDF
1. UPDATED Figure L-1 Combined Management Plan.xlsx XLSX spreadsheet
OM Photos 4-2-21-20210412T211125Z-001.zip ZIP file
Exhibit C3 Recycle Solid Water Trash Report.pdf PDF
ATTACHMENT 2 SF98 Request Wage Determination Bexar and Frio Counties New San Antonio Buy.pdf PDF
Exhibit BL3 - TX0501HS FED BLDG INFO SHEET.pdf PDF
Exhibit BL3 - TX398ZZ NEW USCH INFO SHEET (Data not Complete at this time).pdf PDF
Exhibit BL3 - TX0231ZZ PEARSALL BLDG INFO SHEET.pdf PDF
Figure L 1 Combined Management Plan.xlsx XLSX spreadsheet
Exhibit C4 - GSA Form 3638 Pest Control Work and Inspection Report.pdf PDF
BL6 WORK ORDERS SA PEAR Jan 1 2018 thru Nov 1 2020 No PMs.pdf PDF
BL2 TX0164ZZ GARCIA INVENTORY.pdf PDF
BL2 TX0503HS SPEARS INVENTORY.pdf PDF
Exhibit M5 - Smart Buildings.pdf PDF
Exhibit M3 - Environmental Sustainable Products.pdf PDF
BL7 Energy and Water Monthly Report template.docx DOCX document
ATTACHMENT 1 Mechanical CBA PMI IOEU July 2020.pdf PDF
Figure B 3 Pricing of Services.xlsx .xlsx XLSX spreadsheet
EXHIBIT C.1 BLDG INFO SHEET - Hipolito Garcia Federal Courthouse - TX0164ZZ.pdf PDF
Exhibit M9 - 2018 GSA PM Guide FINAL.pdf PDF
Exhibit BL3 - TX0503HS SPEARS BLDG INFO SHEET (To be Disposed).pdf PDF
ATTACHMENT 3 WD 2015 5291 Rev 16 date 12 21 2020 Frio County.pdf PDF
EXHIBIT C.1 BLDG INFO SHEET_Federal Parking Garage - TX0441ZZ.pdf PDF
Figure B 1 Contractors Staffing Declaration.xlsx XLSX spreadsheet
Exhibit BL3 - TX0502HS WOODS BLDG INFO SHEET (To be Disposed).pdf PDF
ATTACHMENT 1 Custodial CBA PMI LIUNA July 2020 Fully Executed FINAL.pdf PDF
EXHIBIT C.1 BLDG INFO SHEET - US Courthouse San Antonio - TX0398ZZ.pdf PDF
EXHIBIT C.1 BLDG INFO SHEET - Pearsall Federal Post Office Building - TX0231ZZ.pdf PDF
ATTACHMENT 3 WD 2015 5253 Rev 12 date 12 21 2020 Bexar County.pdf PDF
Exhibit BL3 - TX0164ZZ GARCIA BLDG INFO SHEET.pdf PDF
BL2 TX0441ZZ FED GARAGE INVENTORY.pdf PDF
EXHIBIT C.1 BLDG INFO SHEET - AA Spears Judge Training Center - TX0503HS.pdf PDF
EXHIBIT C.1 BLDG INFO SHEET - J Woods Federal Courthouse - TX0502HS.pdf PDF
Exhibit M6 - Water Treatment .pdf PDF
BL1 Fire Extinguisher Report SA and Pearsall.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit M10

Item

PV Service Description

Frequency/ Response

Time

Visual inspection of Solar Facility’s general site conditions, PV arrays, electrical equipment, mounting structure, fence, shading, trackers, vegetation, animal damage, erosion, corrosion, and discolored panels.

Every 6 months

Visual inspection and correction of Solar Facility for loose electrical connections and ground connections.

String-level open-circuit voltage, DC operating current tests, and I-V curve traces on 100% of all strings.

1x per year

4 All switches and disconnects tested to ensure they are not jammed.

Infrared scans on 100% combiner and re-combiner boxes; tighten connections to manufacturer's torque specification; report broken terminal blocks.

Every 3 years

100% check calibration expiration on sensors and meters, including pyranometers, and anemometers and perform other service such as cleaning and replacement of any desiccant.

Turn off and on logging and communications to ensure they are communicating and ensure battery backups are working.

Inverter preventive maintenance for 100% of all inverters per manufacturer’s operating guidelines

See

8a,8b,8c & 8d

8a Clean inverter cabinet air vents.

8b Clean and change inverter air filters, if present, per manufacturer’s warranty requirements.

8c Clean/remove dust from inverter heat sinks per manufacturer’s warranty requirements.

8d Check torque marks and re-tightening appropriate wiring connections to design specification torque force per manufacturer’s guidelines.

9 Inspect roof penetrations to ensure sealant is applied properly and not degrading.

10 PV array module maintenance for all modules See 10a & 10b

10a Wash all panels with water with no chemicals in a method approved by the

Owner.

10b Perform infrared scan of 100% of modules for two types of circuitry connections: cells on the front and junction boxes on the back.

Every 3 years

*Adapted from the following authority:

Technical Report

NREL/TP-7A40-73822

December 2018