Exhibit L. Tenant Improvements Cost Summary TICS Table - EREC.xlsx

XLSX spreadsheet 565 KB Posted

Attached to
X1DZ--Emergency Response Engineering Center (EREC)
Solicitation number
36C24425R0039
Issued by

About this file

The file is a Tenant Improvements Cost Summary (TICS) table for a Department of Veterans Affairs lease opportunity in Pittsburgh, PA, associated with Solicitation Number 36C24425R0039. This comprehensive cost breakdown template is designed to itemize construction and improvement costs across 33 CSI Masterformat divisions for both Tenant Improvements (TI) and Shell construction, with placeholders for material and labor costs for each division.

The document provides a detailed framework for estimating costs related to a lease for an Emergency Response Engineering Center (EREC), with space requirements of up to 9,990 Rentable Square Feet (RSF) and 7,400 Net Usable Square Feet (NUSF). The TICS table includes sections for calculating trade costs, general contractor fees, architectural and engineering fees, and other lessor costs, with the intention of allowing precise cost breakdowns across various construction and improvement categories. While the current template shows zero-dollar placeholders, it is structured to capture comprehensive cost details for the proposed facility improvements.

View the file

Other files

File Type Posted
36C24425R0039_4.docx DOCX document
36C24425R0039 0003.pdf PDF
Attachment 3. Exhibit N. Space Plan - Updated 08.19.25 - EREC.pdf PDF
Attachment 1. Pre Proposal Meeting Agenda - EREC - RLP 36C24425R0039.pdf PDF
36C24425R0039_3.docx DOCX document
Attachment 2. Questions and Answers - EREC - RLP 36C24425R0039.pdf PDF
36C24425R0039 Amendment 0002 - EREC.pdf PDF
36C24425R0039 0001 Amendment - EREC.pdf PDF
Attachment 1. Pre-Proposal Meeting - EREC.pdf PDF
36C24425R0039_2.docx DOCX document
Exhibit M. Space Plan - EREC.pdf PDF
Exhibit D. 3516 Solicitation Provisions - EREC.pdf PDF
Exhibit C. VA Security Requirements FSL Level II - EREC.pdf PDF
Exhibit N. Contract Submittal Schedule - EREC.pdf PDF
Exhibit K. Security Unit Price List FSL II - EREC.xlsx XLSX spreadsheet
Exhibit J. FAR 52.204-24 Representation Digital - EREC.pdf PDF
Exhibit I. Wage Determination - EREC.pdf PDF
Exhibit D-1. VA Provision Addendum Alternate Protest Procedure - EREC.pdf PDF
Exhibit B-1. Equipment Details - EREC.pdf PDF
Exhibit A. 36C24425L0011 Global Lease L100 - EREC.pdf PDF
36C24425R0039 Global Request for Lease Proposal - EREC.pdf PDF
36C24425R0039.docx DOCX document
Attachment 1. Past Performance Questionnaire - EREC.pdf PDF
Exhibit H. Prelease FPLS Evaluation Form 12000 - EREC.pdf PDF
Exhibit G. Form 1217 - Lessor's Annual Cost Statement - EREC.pdf PDF
Exhibit F. 1364 Proposal to Lease Space - EREC.pdf PDF
Exhibit E. 3517B General Clauses - EREC.pdf PDF
Exhibit B. Agency Specific Requirements - EREC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TICS

TENANT IMPROVEMENTS COST SUMMARY (TICS)Version Oct. 2024
For:36C24425L0011ABOA SF=- 0
Agency:VA - ERECTIA PER ABOA SF=$ - 0
Location:Pittsburgh, PATOTAL TIA=$ - 0
Common Area Factor:-RSF=- 0
Masterformat CSISystem ElementsTI*SHELL**
Div 1General Requirements$ - 0$ - 0
Div 2Existing Conditions$ - 0$ - 0
Div 3Concrete$ - 0$ - 0
Div 4Masonry$ - 0$ - 0
Div 5Metals$ - 0$ - 0
Div 6Wood, Plastics, Composites$ - 0$ - 0
Div 7Thermal and Moisture Protection$ - 0$ - 0
Div 8Openings$ - 0$ - 0
Div 9Finishes$ - 0$ - 0
Div 10Specialties$ - 0$ - 0
Div 11Equipment$ - 0$ - 0
Div 12Furnishings$ - 0$ - 0
Div 13Special Construction$ - 0$ - 0
Div 14Conveying Equipment$ - 0$ - 0
Div 21Fire Suppression$ - 0$ - 0
Div 22Plumbing$ - 0$ - 0
Div 23Heating, Ventilating, and Air Conditioning (HVAC)$ - 0$ - 0
Div 26.1Electrical$ - 0$ - 0
Div 26.2Lighting$ - 0$ - 0
Div 27Communications$ - 0$ - 0
Div 28.1Electronic Safety$ - 0$ - 0
Div 28.2Electronic Security (TI - Non-BSAC)$ - 0$ - 0
Div 31Earthwork$ - 0$ - 0
Div 32Exterior Improvements$ - 0$ - 0
Div 33Utilities$ - 0$ - 0
SubtotalTrade Costs$ - 0$ - 0
General Contractor FeePercent$ - 0$ - 0
SubtotalConstruction Costs$ - 0$ - 0
Architectural & Engineering Fees (NIC DID costs) ***Percent$ - 0$ - 0
Other Lessor Costs Established Under the Lease$ - 0$ - 0
SubtotalLessor's Costs:$ - 0$ - 0
Lessor's Project Management FeePercent$ - 0
TotalPrice to Government:GRAND TOTAL$ - 0
Cost per ABOA SF$ - 0$ - 0
Cost per RSF$ - 0$ - 0
Notes:
*Include all subcontractors' costs.
**Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information.
***Not subject to Lessor's project management fee.
BSAC SUMMARY
BSACBuilding Specific Amortized Capital Costs$ - 0
BSAC Architectural & Engineering FeesPercent$ - 0
BSAC Lessor's Project Management FeePercent$ - 0
TotalBSAC Costs and FeesTOTAL$ - 0
Cost per ABOA SF$ - 0
Cost per RSF$ - 0

EXHIBIT L

RLP No. 36C24425R0039

Page &P

INSTRUCTIONS

INSTRUCTIONS
Read and understand 'SHELL' tab.
Input project specific information as appropriate in the light blue fields of the 'INPUT' worksheet, in order to auto-populate the TICS worksheet. This includes ANSI-BOMA Office Area (ABOA) square footage, General Contractor Fee, Lessor's Project Management Fee, and A/E Fees. Note that some of these fees are already established under the lease agreement and must be used when completing this worksheet.
Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.
Material
DescriptionAccurately describe each item being priced.
QuantityList the quantity e.g., 1, 2, 3, etc.
Unit(Example) LS,EA,GAL,LF, SF, etc.
CostAmount per one unit
TotalTotal cost of all material.
Labor
HoursTime projected to perform the task.
Labor RateCost per hour of labor.
TotalCost of labor.
TOTAL Combines overall materials and labor.

Tenant Improvements (TI)

TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.

1. Fill out light blue fields categorized Tenant Improvements (TI), inputting only costs associated with TI.

2. Fill each division tab 1-33 as needed for the construction to be performed under the TI costs as indicated above.

Shell

1. Fill out light blue fields categorized SHELL, inputting only costs associated with shell as defined in the 'SHELL' tab.

2. Fill each division tab 1-33 as needed for the construction to be preformed under the SHELL cost as indicated above.

DIVISION 9 - FINISHESFOR:DATE PREPARED:
Project or Lease #1/1/22
Tentant Improvement (TI) Cost Estimate for Division 9
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
XYZ Paint1.00GAL.$25.00$25.002.50$36.25$90.63
$0.00$0.00
$0.00$0.00
Material Total:$25.00Labor Total:$90.63
TOTAL TI MATERIAL & LABOR:$115.63
Shell Cost Estimate for Division 9
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
ABC Paint10.00GAL.$27.00$270.006.00$36.25$217.50
$0.00$0.00
$0.00$0.00
Material Total:$270.00Labor Total:$217.50
TOTAL SHELL MATERIAL & LABOR:$487.50

Building Specific Amortized Capital (BSAC)

BSAC is used for the build-out of security-related improvements, most commonly listed on a 'Security Requirements' attachment.

1. Because Architectural & Engineering Fees and Lessor's Project Management Fees apply to BSAC as well as Tenant Improvement costs, this form includes opportunities to include BSAC pricing in order to capture a comprehensive fee evalutation. Fees identified as having a percentage basis for TI costs on the INPUT tab will automatically be applied to BSAC costs as well on the TICS tab, if applicable.

2. BSAC elements are traditionally itemized on a Security Unit Price List form. Enter the 'Total Costs' value from that form on the BSAC tab as instructed on the page. If a Security Unit Price List is not available and/or a more detailed examination of BSAC costs is desired, the BSAC tab can also itemize costs.

SHELL

Per GSA Pricing Desk Guide, 5th Edition.
Table 2-4. Shell Definition for General Use Buildings
Base BuildingOccupant Areas

Base structure and building enclosure components (windows with exterior finishes) are complete.

Broom-clean concrete floor slab, with a flat and level floor.

Base building mechanical, electrical and plumbing systems (e.g., central fire alarm, chiller plant, cooling tower) are complete and functional.

Gypsum wallboard, spackled and prime painted, on exterior perimeter walls and tenant demising walls, without suite entry door.

All common areas, such as lobbies, elevators, fire egress corridors and stairwells, garages, and service areas are complete. (Circulation corridors are provided as part of the base building only on multi- tenanted floors where the corridor is common to more than one tenant. On single tenant floors, only the fire egress corridor necessary to meet code is provided as part of the shell.)

Suspended acoustical ceiling system including grid and lay-in tiles (or other building standard). Lighting luminaires should be installed in the ceiling grid for an open office plan at the rate of one fixture per 80 USF.3 Lighting controls with ambient lighting adjusted per daylight availability, occupancy, vacancy, or other building automation system signals.

Building common restrooms are complete and operational.

Building cores on each floor with assignable space contain the following: tappable domestic water riser, service sanitary drain, sanitary vent, ready for extension to tenant- demised areas.

Electrical power distribution panels and circuit breakers available in an electrical closet, with capacity at 120/208 volt, 3- phase, 4-wire providing 4 watts per USF excluding lighting and HVAC.

Designated connection point to the central fire alarm system for extension to tenant- demised areas.

Distribution backboard within a wire closet for connection to tenant’s telephone lines. Vertical conduit (empty sleeve) through building core, available for tenant wiring and cabling.

Central heating, ventilation, and air conditioning (HVAC) systems are installed and operational, including, as appropriate, main and branch lines, variable air volume boxes, dampers, flex ducts and diffusers, for open office layout. Conditioned air through medium pressure ductwork at a rate of .75 cfm per square foot of usable area is provided.

Sprinkler mains and distribution piping in a protection layout (open plan) with heads turned down, concealed with an escutcheon or trim plate, are installed.

INPUT

INFORMATION NEEDED TO COMPLETE TICS TABLEFALSE
FALSE
LEASE GS-XXP-LXXXXXXX or Project36C24425L0011FALSE
AgencyVA - ERECFALSE
Location: City, StatePittsburgh, PAFALSE
FALSE
ABOA SF =General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum.
TENANT IMPROVEMENT ALLOWANCE PER ABOA SF =
RSF=
DATE:
BasisAmount
Tenant Improvement General Contractor FeepercentEnter percent values as decimals. Ex: 0.06 for 6.00%
Shell General Contractor Feepercent
Tenant Improvement A/E Fees (per Lease)percent
Shell A/E FeespercentFor A/E fees established as a cost per ABOA sf, convert rate to lump sum.
Lessor's TI Project Management Fee (per Lease)percent
StevenTFreund: Request for Lease Proposals requires a percentage basis for TI and BSAC project management fee.percent
TIShelllump sum
Other Lessor Costs Established Under the Lease

If BSAC is applicable, 'Amount' values entered above for TI fees that have a 'percent' basis will automatically be applied to BSAC on the TICS tab. 'Lump Sum' basis amounts will NOT be applied twice; 'lump sum' basis amounts entered above should consider the full scope of both TI and BSAC and will only be displayed once on the TICS tab.

BSAC

BUILDING SPECIFIC AMORTIZED CAPITAL (BSAC)FOR:DATE PREPARED:
36C24425L0011
Building Specific Amortized Capital (BSAC) Cost Estimate (Most commonly itemized on a Security Unit Price List.)
Select Method of BSAC Inclusion:N/A← Click if entering BSAC values
If entering BSAC values, select method from cell F4 dropdown list.
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL BSAC MATERIAL AND LABOR:$ - 0
Division 1 - General RequirementsFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 1 (examples: superintendence, mob/demob, dust control, waste & dumpsters, temporary barriers & barricades)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 1 (examples: superintendence, mob/demob, dust control, waste & dumpsters, temporary barriers & barricades)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
Division 2 - Existing ConditionsFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 2 (examples: site work, demolition)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 2 (examples: demolition, survey, geotech, HAZMAT)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
Division 3 - ConcreteFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 3
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 3 (examples: foundations, columns, flatwork, beams)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
Division 4 - MasonryFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 4
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 4 (examples: brick, block)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
Division 5 - MetalsFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 5 (examples: structural, grates, decking, joists, stairs, railings, custom fabrications)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 5 (examples: structural, grates, decking, joists, stairs, railings, custom fabrications)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 6 - WOOD, PLASTICS, COMPOSITESFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 6 (examples: wood framing, rough carpentry, sheathing, millwork, decking, paneling, stairs & railings)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 6 (examples: wood framing, rough carpentry, sheathing, millwork, decking, paneling, stairs & railings)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 7 - THERMAL & MOISTURE PROTECTIONFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 7 (examples: roof Penetration/Patching, firestopping, joint sealants, caulking, dampproofing, insulation, weather barriers)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 7 (examples: roof Penetration/Patching, firestopping, joint sealants, caulking, dampproofing, insulation, weather barriers)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 8 - OPENINGSFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 8 (examples: doors, frames, hardware, louvers, windows, glazing, curtainwall)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 8 (examples: doors, frames, hardware, louvers, windows, glazing, curtainwall)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 9 - FINISHESFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 9 (examples: painting, carpeting, flooring & base, wall protection, walls)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 9 (examples: painting, carpeting, flooring & base, wall protection, walls)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 10 - SPECIALTIESFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 10 (examples: displays, signage, directory boards, movable partitions, wall and door protection, lockers, flagpoles, storage assemblies)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 10 (examples: displays, signage, directory boards, movable partitions, wall and door protection, lockers, flagpoles, storage assemblies)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 11 - EQUIPMENTFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 11 (examples: AV, lab, recreational, food, banking, medical, retail, parking, loading dock, and other equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 11 (examples: AV, lab, recreational, food, banking, medical, retail, parking, loading dock, and other equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 12 - FURNISHINGSFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 12 (examples: decorations, systems and office funiture, casework, countertops)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 12 (examples: decorations, systems and office funiture, casework, countertops)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 13 - SPECIAL CONSTRUCTIONFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 13 (examples: pre-engineered & prefab structures)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 13 (examples: pre-engineered & prefab structures)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 14 - CONVEYING EQUIPMENTFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 14
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 14
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 21 - FIRE SUPPRESSIONFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 21
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 21
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 22 - PLUMBINGFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 22
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 22
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)FOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 23
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 23
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

26.1

DIVISION 26.1 - ELECTRICALFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 26.1 (examples: conduit, wire, supports, boxes, fittings, terminations, outlets, cover plates, receptacles, power devices, panels & breakers, electrical equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 26.1 (examples: conduit, wire, supports, boxes, fittings, terminations, outlets, cover plates, receptacles, power devices, panels & breakers, electrical equipment)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

26.2

DIVISION 26.2 - LIGHTINGFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 26.2 (examples: lighting fixtures, wall switches, motion switches)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 26.2 (examples: lighting fixtures, wall switches, motion switches)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 27 - COMMUNICATIONSFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 27 (examples: Low Voltage cabling (CAT6, POE, Coax, HDMI, speaker), overhead speakers/intercom, sound-masking/white noise devices, jacks, punchdown, cover plates, cable trays/j-hooks, server racks (conduit & boxes see Div 26.1))
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 27
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

28.1

DIVISION 28.1 - ELECTRONIC SAFETYFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 28.1 (examples: Fire Alarm Only: wire, devices, smokes, heats, CO2, exit signs, addressing & testing)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 28.1
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

28.2

DIVISION 28.2 - ELECTRONIC SECURITYFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 28.2 (examples: duress, IDS, motion, video surveillance systems, CCTV, security scanning, glass break, alarm devices) SHOULD NOT include items required/itemized as BSAC on a Security Unit Price List, provided separately, or the BSAC tab on this form. SHOULD include items labeled TI on a Security Unit Price List.
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 28.2 SHOULD NOT include items required/itemized as BSAC on a Security Unit Price List, provided separately if necessary. SHOULD include items labeled SHELL on a Security Unit Price List.
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 31 - EARTHWORKFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 31
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 31
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

cornerstone

DIVISION 32 - EXTERIOR IMPROVEMENTSFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 32
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 32 (examples: site, civil, pavements, landscaping, walks, pedestals, fences, gates, permanent vehicle barriers, foundations, earthwork)
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0
DIVISION 33 - UTILITIESFOR:DATE PREPARED:
36C24425L0011
Tentant Improvement (TI) Cost Estimate for Division 33
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
Describe first item here1.00(ex: LF)$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00s
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL TI MATERIAL AND LABOR:$ - 0
SHELL Cost Estimate for Division 33
DESCRIPTIONMATERIALLABOR
QUANTITYUNITCOSTTOTALHOURSLabor RateTOTAL
1.00$0.00$0.001.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
MATERIAL TOTAL:$ - 0LABOR TOTAL:$ - 0
TOTAL SHELL MATERIAL AND LABOR:$ - 0

image1.jpg image2.emf image3.emf image4.emf image5.emf image6.emf image7.emf image8.emf image9.emf image10.emf image11.emf image12.emf image13.emf image14.emf image15.emf image16.emf image17.emf image18.emf image19.emf image20.emf image21.emf image22.emf image23.emf image24.emf image25.emf image26.emf image27.emf

File details come from the government source that posted it. Updated .