Exhibit_G_-_Bid_Price_Sheet_26-B-38IF.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Heron Street, Egret Avenue, and Mallard Street Seawall Replacement Project
Solicitation number
26-B-38IF
Issued by
Volusia County, Florida

About this file

This is a Bid Price Sheet (Exhibit G) for the Heron Street, Egret Avenue, and Mallord Street Seawall Replacement Project in Wilbur by the Sea, Florida, administered by Volusia County. The project involves the repair and improvement of beachfront armoring and public beach access at three locations that were severely damaged during Hurricanes Ian and Nicole. Work scope includes demolition and excavation, sand fill and grading, seawall construction, concrete plugs and chemical grout, beach access stairs and landings, concrete walkways, aluminum guiderails, dune plant restoration (dune sunflower, sea oats, and sea grape), as-built surveys, and site restoration. The three project locations have minimal space for materials and equipment, bordered by private properties and a heavily traveled road, which will constrain contractor operations. Award will be determined based on the lowest responsive and responsible bidder using combined pricing submitted for all three locations.

The bid price sheet presents itemized quantities for each of the three locations: Heron Street includes 150 tons of sand fill, 111 linear feet of seawall, and 178 square feet of beach access stairs; Egret Avenue includes 510 tons of sand fill, 121 linear feet of seawall, and 178 square feet of beach access stairs; and Mallard Street includes 560 tons of sand fill, 1 lump sum seawall item, and 166 square feet of beach access stairs. Dune planting requirements total 1,731 plants across all three sites. All unit prices are blank in the submission template, indicating this is a blank price sheet for contractor completion. The total bid price includes a subtotal for all work items plus a separate line item for Payment and Performance Bond. Contractors must provide combined pricing for all three locations to be considered for award.

View the file

Other files

File Type Posted
Heron_Street,_Egret_Avenue,_and_Mallard_Street_Seawall_Replacement_Project_(Addendum_#1_Revision).pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-38IF_-_REVISION_1.xlsx XLSX spreadsheet
Exhibit_K_-_Installation_Floater_Affidavit_26-B-38IF.docx DOCX document
Heron_Street,_Egret_Avenue,_and_Mallard_Street_Seawall_Replacement_Project.pdf PDF
Exhibit_J_-_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-38IF.pdf PDF
Exhibit_I_-_Surveys_for_26-B-38IF_-_Heron_Street,_Egret_Avenue,_and_Mallard_Street.pdf PDF
Exhibit_H_-_Geotechnical_Data_for_26-B-38IF_-_Heron_Street,_Egret_Avenue,_and_Mallard_Street.pdf PDF
Exhibit_F_-_Sales_Tax_Exemption_Procedure_26-B-38IF.pdf PDF
Exhibit_E_-_Technical_Specifications_26-B-38IF_for_Heron_Street,_Egret_Avenue,_and_Mallard_Street.pdf PDF
Exhibit_D_-_Construction_Plans_26-B-38IF_-_Heron_Street,_Egret_Avenue,_and_Mallard_Street.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-38IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-38IF.xls XLS spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-38IF.pdf PDF
Drawings_HERON.pdf PDF
Drawings_EGRET.pdf PDF
Drawings_MALLARD.pdf PDF
2c_-_Heron_Geotechnical_Data.pdf PDF
2a_-_Mallard_Geotechnical_Data.pdf PDF
2025-10-10_Tech_Specs_-_2_-_Egret.pdf PDF
2025-10-10_Tech_Specs_-_3_-_Heron.pdf PDF
1b_-_Egret_Survey_SIGNED.pdf PDF
2025-10-10_Tech_Specs_-_1_-_Mallard.pdf PDF
2b_-_Egret_Geotechnical_Data.pdf PDF
1a_-_Mallard_Survey_SIGNED.pdf PDF
1c_-_Heron_Survey_SIGNED.pdf PDF
2025-10-10_3_Birds_Bid_Schedule.xlsx XLSX spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Canal 4 Control Structure

Heron Street Beach Access Seawall Replacement and Beach Access Stairs
Contractor's Cost
ITEM No.DESCRIPTIONQUANTITYUNITPRICE / UNITPRICE
1Mobilization/Demobilization1LS$ - 0$ - 0
2Demolition & Excavation1LS$ - 0$ - 0
3Sand Fill & Grading150TN$ - 0$ - 0
4Seawall111LF$ - 0$ - 0
5Concrete Plug & Chemical Grout1LS$ - 0$ - 0
6Beach Access Stairs & Landing178SF$ - 0$ - 0
7Concrete Walkway107SY$ - 0$ - 0
8Aluminum Guiderail160LF$ - 0$ - 0
9aDune Plants - dune sunflower158Plant$ - 0$ - 0
9bDune Plants - sea oats1,417Plant$ - 0$ - 0
9cDune Plants - sea grape156Plant$ - 0$ - 0
10As-Built Survey1LS$ - 0$ - 0
11Site Restoration1LS$ - 0$ - 0
Sub Total$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Sqaure Foot; EA= Each; TN=Ton
Egret Avenue Beach Access Seawall Replacement and Beach Access Stairs
Contractor's Cost
ITEM No.DESCRIPTIONQUANTITYUNITPRICE / UNITPRICE
1Mobilization/Demobilization1LS$ - 0$ - 0
2Demolition & Excavation1LS$ - 0$ - 0
3Sand Fill & Grading510TONS$ - 0$ - 0
4Seawall121LF$ - 0$ - 0
5Concrete Plug & Chemical Grout1LS$ - 0$ - 0
6Beach Access Stairs & Landing178SF$ - 0$ - 0
7Concrete Walkway92SY$ - 0$ - 0
8Aluminum Guiderail230LF$ - 0$ - 0
9aDune Plants - dune sunflower119Plant$ - 0$ - 0
9bDune Plants - sea oats1,067Plant$ - 0$ - 0
9cDune Plants - sea grape118Plant$ - 0$ - 0
10As-Built Survey1LS$ - 0$ - 0
11Site Restoration1LS$ - 0$ - 0
Sub Total$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Sqaure Foot; EA= Each; TN=Ton
Mallard Street Beach Access Seawall Replacement and Beach Access Stairs
Contractor's Cost
ITEM No.DESCRIPTIONQUANTITYUNITPRICE / UNITPRICE
1Mobilization/Demobilization1LS$ - 0$ - 0
2Demolition & Excavation1LS$ - 0$ - 0
3Sand Fill & Grading560TONS$ - 0$ - 0
4Seawall1LS$ - 0$ - 0
5Concrete Plug & Chemical Grout1LS$ - 0$ - 0
6Beach Access Stairs & Landing166SF$ - 0$ - 0
7Concrete Walkway107SY$ - 0$ - 0
8Aluminum Guiderail151LF$ - 0$ - 0
9aDune Plants - dune sunflower164Plant$ - 0$ - 0
9bDune Plants - sea oats1,470Plant$ - 0$ - 0
9cDune Plants - sea grape162Plant$ - 0$ - 0
10As-Built Survey1LS$ - 0$ - 0
11Site Restoration1LS$ - 0$ - 0
Sub Total$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Sqaure Foot; EA= Each; TN=Ton
Subtotal Bid Price for Heron Street, Egret Avenue, and Mallard Street$ - 0
Payment and Performance Bond$ - 0
Total Bid Price for Heron Street, Egret Avenue, and Mallard Street$ - 0

Award for this project will be determined based on the lowest responsive and responsible bidder using the combined pricing submitted for Heron Street, Egret Avenue, and Mallard Street listed above.