Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-38IF.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-38IF
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form (Exhibit B) for Volusia County, Florida, related to Invitation to Bid (ITB) No. 26-B-38IF for Contract No. C-2067, the Heron Street, Egret Avenue, and Mallard Street Seawall Replacement Project. The project addresses damage from Hurricanes Ian and Nicole to beachfront armoring in Wilbur by the Sea and involves demolition, seawall construction, grading, compaction, and timber dune walkover construction across three right-of-way locations controlled by Volusia County. The project sites have minimal space for materials and equipment and are adjacent to private properties and heavily traveled roads. Bidders are required to complete this form identifying all proposed subcontractors and must list the company names, addresses, dollar values, and percentage of work for both the prime contractor and each subcontractor by discipline. Failure to complete and return this form may result in a non-responsive bid.
The form requires bidders to allocate the total bid price across anticipated subcontractor disciplines including demolition, disposal, surveying, sand/fill hauling, grading and compaction, concrete work, seawall panel installation, helical anchor installation, testing, carpentry, site restoration, and aluminum guardrail installation. Bidders must complete sections shaded in green with dollar values assigned to each contractor, with all other cells automatically calculated to ensure the total equals 100 percent. The prime contractor is responsible for ensuring all subcontractors maintain appropriate licenses, and any changes to subcontractor assignments during project completion require prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not permit changes to the total submitted base bid pricing. This form also serves to determine local preference eligibility in accordance with Section 2.8, D of the solicitation.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2067 | ITB No. 26-B-38IF | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Attachment G - Bid Price Sheet 26-B-38IF
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Demolition | $ - 0 | 0.00% | |
| Disposal | $ - 0 | 0.00% | |
| Surveyors | $ - 0 | 0.00% | |
| Sand/Fill Hauling | $ - 0 | 0.00% | |
| Grading and Compaction | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Seawall Panel Installation | $ - 0 | 0.00% | |
| Helical Anchor Installation | $ - 0 | 0.00% | |
| Testing | $ - 0 | 0.00% | |
| Carpentry | $ - 0 | 0.00% | |
| Site Restoration | $ - 0 | 0.00% | |
| Aluminum Guardrail | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .