2025-10-10_3_Birds_Bid_Schedule.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 26-B-38IF
- Issued by
- Volusia County, Florida
About this file
This is a bid tabulation schedule for three beach access replacement seawall and stairs projects managed by Volusia County, Florida, following damage from Hurricanes Ian and Nicole. The three project locations—Mallard Street, Egret Avenue, and Heron Street in Wilbur by the Sea—each require demolition of existing structures, seawall construction, beach access improvements, and site restoration. The Mallard Street project involves 560 tons of sand fill, a seawall, 166 square feet of beach access stairs, 107 square yards of concrete walkway, 151 linear feet of aluminum guiderail, and 1,796 dune plants across three species. The Egret Avenue project includes 510 tons of sand fill, a 121-linear-foot seawall, 178 square feet of stairs, 92 square yards of walkway, 230 linear feet of guiderail, and 1,304 dune plants. The Heron Street project features 150 tons of sand fill, a 111-linear-foot seawall, 178 square feet of stairs, 107 square yards of walkway, 160 linear feet of guiderail, and 1,731 dune plants. All three projects include mobilization/demobilization, concrete plugs with chemical grout, as-built surveys, and site restoration as lump-sum line items.
The bid schedule reflects unit cost and total cost columns for individual line items across all three projects, though specific pricing information is not populated in the document. The projects address seawall replacement and public beach access improvements in right-of-ways controlled by Volusia County, with constraints noted regarding minimal staging space for materials and equipment due to proximity to private properties and a heavily traveled road. Contract time in calendar days is referenced but not specified in the tabulation schedule.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| Mallard Street Beach Access | ||||||
| Replacement Seawall and Beach Access Stairs | ||||||
| Volusia County | ||||||
| Bid Tabulation | ||||||
| October 10, 2025 | ||||||
| Item No. | Description | Quantity | Unit Cost | Total Cost | ||
| 1 | Mobilization/Demobilization | 1 | LS | LS | ||
| 2 | Demolition & Excavation | 1 | LS | LS | ||
| 3 | Sand Fill & Grading | 560 | TONS | /TON | ||
| 4 | Seawall | 1 | LS | /LS | ||
| 5 | Concrete Plug & Chemical Grout | 1 | LS | LS | ||
| 6 | Beach Access Stairs & Landing | 166 | SF | /SF | ||
| 7 | Concrete Walkway | 107 | SY | /SY | ||
| 8 | Aluminum Guiderail | 151 | LF | /LF | ||
| 9a | Dune Plants - dune sunflower | 164 | Plant | /Plant | ||
| 9b | Dune Plants - sea oats | 1,470 | Plant | /Plant | ||
| 9c | Dune Plants - sea grape | 162 | Plant | /Plant | ||
| 10 | As-Built Survey | 1 | LS | LS | ||
| 11 | Site Restoration | 1 | LS | LS | ||
| Total Cost: | ||||||
| Contract Time (Calendar Days): |
| Egret Ave Beach Access | ||||||
| Replacement Seawall and Beach Access Stairs | ||||||
| Volusia County | ||||||
| Bid Tabulation | ||||||
| October 10, 2025 | ||||||
| Item No. | Description | Quantity | Unit Cost | Total Cost | ||
| 1 | Mobilization/Demobilization | 1 | LS | LS | ||
| 2 | Demolition & Excavation | 1 | LS | LS | ||
| 3 | Sand Fill & Grading | 510 | TONS | /TON | ||
| 4 | Seawall | 121 | LF | /LF | ||
| 5 | Concrete Plug & Chemical Grout | 1 | LS | LS | ||
| 6 | Beach Access Stairs & Landing | 178 | SF | /SF | ||
| 7 | Concrete Walkway | 92 | SY | /SY | ||
| 8 | Aluminum Guiderail | 230 | LF | /LF | ||
| 9a | Dune Plants - dune sunflower | 119 | Plant | /Plant | ||
| 9b | Dune Plants - sea oats | 1,067 | Plant | /Plant | ||
| 9c | Dune Plants - sea grape | 118 | Plant | /Plant | ||
| 10 | As-Built Survey | 1 | LS | LS | ||
| 11 | Site Restoration | 1 | LS | LS | ||
| Total Cost: | ||||||
| Contract Time (Calendar Days): |
| Heron Beach Access | ||||||
| Replacement Seawall and Beach Access Stairs | ||||||
| Volusia County | ||||||
| Bid Tabulation | ||||||
| October 10, 2025 | ||||||
| Item No. | Description | Quantity | Unit Cost | Total Cost | ||
| 1 | Mobilization/Demobilization | 1 | LS | LS | ||
| 2 | Demolition & Excavation | 1 | LS | LS | ||
| 3 | Sand Fill & Grading | 150 | TONS | /TON | ||
| 4 | Seawall | 111 | LF | /LF | ||
| 5 | Concrete Plug & Chemical Grout | 1 | LS | LS | ||
| 6 | Beach Access Stairs & Landing | 178 | SF | /SF | ||
| 7 | Concrete Walkway | 107 | SY | /SY | ||
| 8 | Aluminum Guiderail | 160 | LF | /LF | ||
| 9a | Dune Plants - dune sunflower | 158 | Plant | /Plant | ||
| 9b | Dune Plants - sea oats | 1,417 | Plant | /Plant | ||
| 9c | Dune Plants - sea grape | 156 | Plant | /Plant | ||
| 10 | As-Built Survey | 1 | LS | LS | ||
| 11 | Site Restoration | 1 | LS | LS | ||
| Total Cost: | ||||||
| Contract Time (Calendar Days): |