Exhibit F-Sample IDIQ Subcontract-AE.pdf
PDF 290 KB Posted
- Solicitation number
- ISD_365048_DA_R1
About this file
This document is an Indefinite Delivery/Indefinite Quantity (IDIQ) Subcontract for Professional Building Architectural and Engineering (A/E) Services between Fermi Forward Discovery Group (FFDG) and an unnamed Subcontractor. The subcontract covers A/E services for the Fermi National Accelerator Laboratory in Batavia, IL, with a base performance period from September 1, 2025, through August 31, 2027, and two potential one-year option periods.
The subcontract will operate through Firm-Fixed Price (FFP) Task Orders with a minimum guaranteed value of $1,000 and a maximum total value of an unspecified amount. Task Orders will be issued by FFDG's Procurement Specialist via email, with the Subcontractor required to submit proposals detailing hours, labor classifications, disciplines, and pricing. The Subcontractor will be responsible for designing and engineering work in compliance with U.S. Department of Energy and State of Illinois codes, performing services for the Infrastructure Services Division, and potentially working on projects ranging from studies to technical documents for new construction or facility renovations in various environments.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontract Number ######
For Professional Building Architectural and Engineering (A/E) Services
Between FFDG and Subcontractor
Section A – General ……………………………………………………………………………………………………………………………………………. 3 A1. Identification of Parties A2. Subcontract Issued Under Prime Contract A3. Relationships A4. General Purpose of the Subcontract A.5 Period of Performance A6. Order of Precedence A7. Agreement A8. Signature
Section B - Supplies or Services and Prices B1. Prices B2. Indefinite Delivery / Indefinite Quantity (IDIQ)
B2.1 Indefinite Delivery / Indefinite Quantity (IDIQ) [Reference: FAR 52.216-22] 5 B2.2 Ordering [Reference: FAR 52.216-18] 5
B3. Task Orders B.3.1 Proposals 6 B.3.2 Availability of Funds 6 B3.3 Ordering Limitations 6 B3.4 Requirements for Subcontractor’s Proposal for a Task Order 7
B4. Task Order Pricing Section C - Description of Work
C1. Standards of Performance C2. Technical Reports C.3 Conduct of Employees C4. Statement of Work
Section D - Packaging and Marking D1. Packaging and Marking
Section E - Inspection and Acceptance E1. Inspection and Acceptance
Section F - Deliveries or Periods of Performance F1. Deliveries or periods of performance Deliveries or periods of performance shall be in accordance with the Task Orders
Section G - Subcontract Administration Data G1. Subcontract Administration G2. Notification of Potential Changes G3. Invoices
G3.1 General Invoice Requirements 9 G4. Payment Schedule G5. Closeout
Section H – Special Subcontract Requirements H1. Small Business Subcontracting Plan H2. FFDGFurnished U.S. Government Property H3. Disposition of U.S. Government Property H4. Insurance H5. Sub-Tier Subcontractors and Outside Associates and Consultants H6. Responsibilities of Subcontractor
Subcontract No. ######
H7. Key Personnel H8. Supervision H9. Additional Requirements
Section I - Subcontract Clauses I1. General Clauses
Section J - List of Documents, Exhibits, and Other Attachments J1. Incorporated Documents
For Professional Building Architectural and Engineering (A/E) Services Between FFDG and Subcontractor
Section A - General A1. Identification of Parties
This Subcontract is between Fermi Forward Discovery Group, LLC (“FFDG”) and the party identified below as the Subcontractor (“Subcontractor”).
A2. Subcontract Issued Under Prime Contract
This Subcontract is issued under Prime Contract No. 89243024CSC000002 between the United States Government (“Government”), represented by the Department of Energy (“DOE”), and FFDG for the management and operation of the Fermi National Accelerator Laboratory (“FNAL or Fermilab”) and the performance of research and development work.
A3. Relationships
Nothing in this Subcontract shall be deemed as creating any relationship between FFDG and Subcontractor other than that of contractor and subcontractor or buyer and seller. Subcontractor shall not interpret any clause contained herein as being binding or purporting to bind the United States Government, its officers, or its agents.
A4. General Purpose of the Subcontract
The general purpose of this Subcontract is to provide the personnel, facilities, equipment, materials, and supplies necessary to perform Architectural and Engineering (A/E) Services in support of Professional Building Architectural and Engineering Services for the Infrastructure Services Division in accordance with the attached Statement of Work (SOW) (Professional Building Architectural and Engineering Services) at Fermilab in Batavia, IL.
The subcontractor’s services will include all normal and customary professional services required of a qualified firm and its sub-tier subcontractors to complete the various tasks in accordance with FFDG’s requirements as outlined herein, as well as applicable portions of the U.S. Department of Energy (DOE) and the State of Illinois codes, orders, and regulations as incorporated into contract No. 89243024CSC000002 between the U.S. Department of Energy and FFDG.
A.5 Period of Performance
The base period of performance of this Subcontract is effective on September 1, 2025, and shall continue through August 31, 2027, plus any additional time required to complete Task Orders issued between these period of performance dates. There will be two (2), one-year option periods available, which FFDG may unilaterally exercise prior to the expiration of the current Subcontract term.
A6. Order of Precedence
Any inconsistency in this Subcontract shall be resolved by giving precedence in the following order: Section A, B, D, E, F, G, H, I, C, J.
A7. Agreement
The parties agree to perform their respective obligations in accordance with the sections, terms and conditions, the documents referenced or incorporated herein, which constitute the entire Subcontract and shall supersede all prior negotiations, representations, or agreements, whether verbal or written.
A8. Signature
The parties have caused this Subcontract to be executed by their duly authorized agents by their signatures below.
Subcontractor
Firm Name Fermi Forward Discovery Group, LLC
Signature: Signature:
Name: Name:
Title: Title:
Date: Date:
Section B - Supplies or Services and Prices
B1. Prices
The Subcontractor shall provide the services through Firm-Fixed Price (FFP) Task Orders, which are based on the fixed hourly labor rates shown in Attachment J-7.
B2. Indefinite Delivery / Indefinite Quantity (IDIQ)
B2.1 Indefinite Delivery / Indefinite Quantity (IDIQ) [Reference: FAR 52.216-22]
a. This is a single-award IDIQ Subcontract for the supplies and services specified in the Subcontract. The effective period is stated in the Subcontract. The quantities of supplies and services specified in the Subcontract are estimates only and are not purchased by this Subcontract.
b. Delivery or performance shall be made only as authorized by Task Orders issued in accordance with the Ordering clause. The Subcontractor shall furnish to FFDG, when and if ordered, the supplies and services specified in the Subcontract in accordance with the Ordering Limitations clause. FFDG shall order at least the quantity of supplies and services designated in the Subcontract as the “minimum.”
c. Except for any limitations on quantities in the Order Limitations clause or in the Subcontract, there is no limit on the number of Task Orders that may be issued. FFDG may issue Task Orders requiring delivery to multiple destinations or performance at multiple locations.
d. Any Task Order issued during the effective period of this Subcontract and not completed within that period shall be completed by the Subcontractor within the time specified in the Task Order. The Subcontract shall govern the Subcontractor’s and FFDG’s rights and obligations with respect to that Task Order to the same extent as if the Task Order were completed during the Subcontract’s effective period.
B2.2 Ordering [Reference: FAR 52.216-18]
a. Any supplies and services to be furnished under this Subcontract shall be ordered by issuance of Task Orders. Such Task Orders may be issued during the effective period stated in the Subcontract.
b. All Task Orders are subject to the terms and conditions of this Subcontract. In the event of conflict between a Task Order and this Subcontract, the Subcontract shall control.
c. Task Orders shall be issued by the FFDG Procurement Specialist via electronic mail (email).
B3. Task Orders
IDIQ Task Orders will be awarded on a FFP basis in accordance with Ordering Clause B2.2. Requirements for reporting are in accordance with the Statement of Work at Attachment J-3.
B.3.1 Proposals
In response to a request for a proposal (RFP) from FFDG, the Subcontractor shall submit a proposal for a Task Order. The Subcontractor shall provide a FFP proposal for the Task Order, including proposed hours for each direct labor classification using the direct labor rates in Attachment J-7, a breakdown of the disciplines, sub-tier consultants, as well as any other elements of pricing.
B.3.2 Availability of Funds
The number of Task Orders to be awarded under this Subcontract will depend upon the availability of funding and the guidelines as established by Attachment J-3 - Statement of Work. This Subcontract has a minimum guaranteed value of $1,000.00 and a maximum total value of $XXXXXX.00, but not a minimum or maximum number of Task Orders. FFDG currently anticipates that Task Orders will be fully funded at the time of issuing a Task Order. If full funding is not available at the time of issuing a specific Task Order, the Task Order will be incrementally funded in accordance with the following language:
“The total award value of this Task Order is $XX.00. Full funding is not presently available for this Task Order. The total funding amount currently allocated for payment under this Task Order (the 'Allocated Funding Limit') is $XX.00. FFDG's obligation for payment hereunder is expressly limited to the Allocated Funding Limit of this Task Order, any other provision to the contrary notwithstanding. In no event shall FFDG’s liability to Subcontractor exceed the Allocated Funding Limit of this Task Order. Subcontractor is not obligated to perform work or otherwise continue performance beyond that which covers the Allocated Funding Limit.
The remaining required funding of $XX.00 shall be released when funding becomes available, and by written change order to this Task Order. It is anticipated that FFDG will increase the Allocated Funding Limit, in the amount of $XX.00, in Month, Year which will fully fund this P.O. in the amount of $XX.00.”
Subcontractor must notify FFDG in writing whenever it has reason to believe that the amount due to Subcontractor under this Task Order reaches 85% of the Allocated Funding Limit. The notice shall state the estimated amount of additional funds required to continue performance. If additional funds cannot be obligated, FFDG will terminate this Task Order in accordance with the termination clause in this IDIQ Subcontract.
B3.3 Ordering Limitations
a. The total maximum Subcontract value, defined as the sum of Subcontractor cumulative value associated with all Task Orders against this IDIQ Subcontract, shall not exceed the amount stated in the Subcontract.
b. The minimum guaranteed Task Order value for this IDIQ Subcontract award is stated in the Subcontract, provided that the Subcontractor can demonstrate it has exercised due diligence and made its best efforts to secure an order.
c. Other than the minimum guaranteed Subcontract value, FFDG has no obligation to issue Task Orders under this IDIQ Subcontract, and all Task Orders are subject to the availability of funds.
B3.4 Requirements for Subcontractor’s Proposal for a Task Order
FFDG will issue a Request for Proposal (RFP) for each Task Order falling within the scope of this IDIQ Subcontract. The Subcontractor is responsible for the cost of preparing a proposal for a Task Order in the form and with the content specified in the RFP.
B4. Task Order Pricing
Task Orders will be priced on a FFP basis and are not subject to any adjustment by Subcontractor. Only the FFDG Procurement Specialist is authorized to modify Task Order FFP funding.
Section C - Description of Work
C1. Standards of Performance
The Subcontractor shall perform the work under this Subcontract by using its best efforts and know-how, and its performance shall be accomplished in a workmanlike manner by qualified, careful and efficient personnel, in accordance with professional standards of care.
C2. Technical Reports
The Subcontractor shall prepare and submit to the Procurement Specialist and distribute, as directed by the Procurement Specialist, such reports concerning technical aspects of work under this Subcontract, in such quantity and form (including detail) and at such times, as may be specified in this Subcontract, or as may otherwise be specified by the Procurement Specialist.
C.3 Conduct of Employees
The Subcontractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, and integrity and shall be responsible for taking such disciplinary action with respect to its employees as may be necessary. The Subcontractor shall immediately remove from the work under this Subcontract any employee of the Subcontractor who, in the sole discretion of FFDG, is found to be unsatisfactory in technical performance or personal conduct.
C4. Statement of Work
The Subcontractor shall perform the work in accordance with the Statement of Work at Attachment J-3.
Section D - Packaging and Marking
D1. Packaging and Marking
Unless otherwise stated in the Subcontract, the Subcontractor shall adequately package and mark all material, drawings, or other items required under this Subcontract to prevent damage during shipment to FFDG.
Section E - Inspection and Acceptance
E1. Inspection and Acceptance
Inspection and acceptance shall be in accordance with the Statement of Work at Attachment J-3 and applicable clauses per Section I.
Section F - Deliveries or Periods of Performance
F1. Deliveries or periods of performance
Deliveries or periods of performance shall be in accordance with the Task Orders.
Section G - Subcontract Administration Data
G1. Subcontract Administration
a. FFDG’s Procurement Specialist for this Subcontract is shown below. The Procurement Specialist or their designate is the only person authorized to make changes in the terms, conditions and requirements of this Subcontract or make modifications to this Subcontract including changes or modifications to the Statement of Work. The Subcontractor shall direct all notices and requests for approval required by this Subcontract to the Procurement Specialist at the following address:
FFDG Procurement Specialist Attention: Danielle Amico Email: damico@fnal.gov Phone: (630) 840-3207
FERMI FORWARD DISCOVERY GROUP, LLC
P.O. Box 500 – Mail Station 210 Batavia, IL 60510-0500
b. Any notices and approvals required by this Subcontract from FFDG to the Subcontractor shall be issued by the FFDG Procurement Specialist.
c. FFDG’s Technical Representative for this Subcontract is shown below. The Technical Representative is the person designated to monitor the Subcontract work and to interpret and clarify the technical requirements of the Statement of Work. The Technical Representative is not authorized to make changes to the work or modify any of the terms and conditions, including the schedule and the pricing of this Subcontract.
FFDG Technical Representative Attention: Andrew Federowicz Email: andrewf@fnal.gov
d. Unless otherwise stated in the Subcontract, reports required by the Subcontract shall be separately submitted to the FFDG Procurement Specialist and the FFDG Technical Representative. Unless otherwise stated in the Subcontract, the reports shall be submitted by email.
mailto:damico@fnal.gov mailto:andrewf@fnal.gov
G2. Notification of Potential Changes
The Subcontractor shall provide notification to FFDG of potential changes to this Subcontract (including Task Orders). The primary purpose of this clause is to obtain prompt reporting by the Subcontractor of circumstances or FFDG actions that the Subcontractor considers to constitute a change to this Subcontract. The Subcontractor shall notify the FFDG Procurement Specialist in writing of any actions, inactions, or communications by FFDG that the Subcontractor regards as a potential change to the Subcontract. This notice requirement does not apply to formal change orders identified as such in writing and signed by the FFDG Procurement Specialist pursuant to the Subcontract’s Changes clause. The Subcontractor shall provide the notice promptly, but no later than ten calendar days from the date that the Subcontractor identifies the potential change. Based on the most accurate information available to the Subcontractor, the notice shall state:
(1) The date, nature, and circumstances of the conduct regarded as a change;
(2) The name, function, and activity of each FFDG individual and Subcontractor official or employee involved in or knowledgeable about such conduct;
(3) The identification of any documents and the substance of any oral communication involved in such conduct;
(4) In the instance of alleged acceleration of scheduled performance or delivery, the basis upon which it arose; and
(5) The elements of Subcontract performance for which the Subcontractor may seek an equitable adjustment under this clause.
G3. Invoices
All invoices shall be emailed to apinvoices@fnal.gov and to the Procurement Specialist at damico@fnal.gov.
The subject line of the email shall state the Subcontractor’s name and the Subcontract number.
If the Subcontractor is unable to submit an invoice by email, it may submit the invoice to the following address:
FFDG Accounts Payable Fermi National Accelerator Laboratory P.O. Box 500 – Mail Station 112 Batavia, IL 60510
G3.1 General Invoice Requirements
Invoices shall be sent electronically to apinvoices@fnal.gov.
Invoices shall contain the following information:
1. Subcontractor name as stated in the Subcontract
2. Remittance address
3. Telephone number and email address of person requesting payment
4. Subcontractor's statement that the invoice is correct
5. FFDG Task Order/Subcontract number
6. Invoice number
7. Invoice date
8. Total invoice amount
9. Description, price, and quantity of materials, property, or services delivered or completed
10. For services: a detailed description of services provided and dates of service
11. Payment terms
13. Other documentation as required by the Subcontract mailto:apinvoices@fnal.gov mailto:damico@fnal.gov mailto:apinvoices@fnal.gov
G4. Payment Schedule
a. FFDG shall pay the Subcontractor, upon the submission of proper invoices in accordance with any requirements from the clauses referenced in Section I, the prices stipulated in this Subcontract for supplies delivered and accepted or services rendered and accepted, less any deductions provided in this Subcontract.
G5. Closeout
The Subcontractor shall, as a condition of full payment, assist FFDG after the completion of the work in accomplishing the administrative closeout of this Subcontract, including, as necessary or required, the furnishing of documentation and reports, the disposition of property, the disclosure of any inventions, the execution of any required assignment or release documents, the performance of any audits, and the settlement of any interim or disallowed costs.
Section H – Special Subcontract Requirements
H1. Small Business Subcontracting Plan
The Subcontractor’s Small Business Subcontracting Plan is incorporated at Attachment J-4.
H2. FFDG Furnished U.S. Government Property
The following facilities, material, and equipment will be supplied by FFDG for use under this Subcontract and are the property of the United States Government. The items listed will be utilized solely for the purpose for which they are intended under this Subcontract.
1. Identification cards
2. Office space on-site at Fermilab
3. Keys
H3. Disposition of U.S. Government Property
All FFDG furnished U.S. Government Property shall be identified, utilized, accounted for, and protected in accordance with the property clauses in the Subcontract, as listed in Attachment J-1. Disposition of such property shall be as directed by the FFDG Procurement Specialist.
H4. Insurance
The insurance requirements for this Subcontract are as shown in Attachment J-5.
H5. Sub-Tier Subcontractors and Outside Associates and Consultants
Sub-tier subcontractors and outside associates or consultants required by the Subcontractor in providing the services covered in this Subcontract shall be limited to individuals or firms that are listed in Attachment J-8. The Subcontractor shall obtain the FFDG Procurement Specialist’s written consent before making any substitution for these sub-tier subcontractors, associates, or consultants after the award of the Subcontract.
H6. Responsibilities of Subcontractor
RESPONSIBILITY FOR PROFESSIONAL SERVICES: The Subcontractor is responsible for the professional quality, technical accuracy, and coordination of all designs, drawings, specifications, and other services furnished by it under this Subcontract.
The Subcontractor warrants that it shall perform its services in accordance with the standards of care and diligence normally practiced by recognized firms in performing services of a similar nature.
The Subcontractor shall, without additional compensation, correct or revise any errors or deficiencies in its designs, drawings, specifications, and other services.
The Subcontractor will be required to design/engineer the work under this Subcontract in accordance with recognized architectural and engineering practice and will comply with the applicable portions of the U.S.
Department of Energy and the State of Illinois codes, orders and regulations as incorporated into contract No.
89243024CSC000002 between the U.S. Department of Energy and Fermi Forward Discovery Group, LLC.
Work Oversight in Architect-Engineer Contracts. The extent and character of the work to be done by the Subcontract shall be subject to the general oversight and approval of the FFDG cognizant personnel.
H7. Key Personnel
It is understood and agreed that the Subcontractor's key personnel designated below are considered essential to the work being performed hereunder and shall not be reassigned or replaced without prior FFDG approval, except where such circumstances are beyond the reasonable control of the Subcontractor. The Subcontractor shall notify the FFDG Procurement Specialist 30 days in advance and shall submit justification (including proposed substitutions with resumes) to permit evaluation of the impact on the performance of this Subcontract.
H8. Supervision
FFDG employees shall not direct or supervise Subcontractor's employees, either directly or indirectly. The Subcontractor is solely responsible for directing and supervising its employees.
H9. Additional Requirements
Subcontractor compliance with all the orders, regulations, plans, manuals, and other directives listed in the Statement of Work and in the Incorporated Documents is a material term of this Subcontract.
Section I - Subcontract Clauses
I1. General Clauses
The general terms and conditions for this Subcontract are as listed in Attachment J-1 and the supplement to the general terms and conditions are as listed in Attachment J-2. The clauses listed in those Attachments shall be applicable to this Subcontract as stated therein based on the value of the Subcontract, the status of the Subcontractor, and the nature and location of the work. The Subcontractor shall flow down to sub-tier subcontractors the clauses as specified in those Attachments.
Section J - List of Documents, Exhibits, and Other Attachments
J1. Incorporated Documents
The following documents are incorporated as a part of this Subcontract.
Number Description/Title Revision or Date J-1 FFDG General Terms and Conditions for Services 01/2025 J-2 Supplement to FFDG General Terms and Conditions for Services J-3 Statement of Work, Professional Building Architectural and
Engineering Services
J-4 Small Business Subcontracting Report (if applicable) J-5 Insurance Requirements for Architect & Engineer Subcontracts 01/2025 J-6 Subcontractor Corporate Quality Control Plan J-7 Subcontractor Fully Loaded/Burdened Direct Labor Rates J-8 Sub-Tier Subcontractors and Outside Associates and Consultants J-9 Subcontractor Annual Representations & Certifications (SARC) Rev. 4
| Section A - General |
| A1. Identification of Parties |
| A2. Subcontract Issued Under Prime Contract |
| A3. Relationships |
| A4. General Purpose of the Subcontract |
| A.5 Period of Performance |
| A6. Order of Precedence |
| A7. Agreement |
| A8. Signature |
| Section B - Supplies or Services and Prices |
| B1. Prices |
| B2. Indefinite Delivery / Indefinite Quantity (IDIQ) |
| B2.1 Indefinite Delivery / Indefinite Quantity (IDIQ) [Reference: FAR 52.216-22] |
| B2.2 Ordering [Reference: FAR 52.216-18] |
| B3. Task Orders |
| IDIQ Task Orders will be awarded on a FFP basis in accordance with Ordering Clause B2.2. Requirements for reporting are in accordance with the Statement of Work at Attachment J-3. |
| B.3.1 Proposals |
| B.3.2 Availability of Funds |
| B3.3 Ordering Limitations |
| B3.4 Requirements for Subcontractor’s Proposal for a Task Order |
B4. Task Order Pricing
| Section C - Description of Work |
| C1. Standards of Performance |
| C2. Technical Reports |
| C.3 Conduct of Employees |
| C4. Statement of Work |
| Section D - Packaging and Marking |
| D1. Packaging and Marking |
| Section E - Inspection and Acceptance |
| E1. Inspection and Acceptance |
| Section F - Deliveries or Periods of Performance |
| F1. Deliveries or periods of performance |
| Deliveries or periods of performance shall be in accordance with the Task Orders. |
| Section G - Subcontract Administration Data |
| G1. Subcontract Administration |
| G2. Notification of Potential Changes |
| G3. Invoices |
| G3.1 General Invoice Requirements |
| G4. Payment Schedule |
| G5. Closeout |
| Section H – Special Subcontract Requirements |
| H1. Small Business Subcontracting Plan |
| H2. FFDG Furnished U.S. Government Property |
| H3. Disposition of U.S. Government Property |
| H4. Insurance |
| H5. Sub-Tier Subcontractors and Outside Associates and Consultants |
| H6. Responsibilities of Subcontractor |
| H7. Key Personnel |
| H8. Supervision |
| H9. Additional Requirements |
| Section I - Subcontract Clauses |
| I1. General Clauses |
| Section J - List of Documents, Exhibits, and Other Attachments |
| J1. Incorporated Documents |
File details come from the government source that posted it. Updated .