Exhibit F - MEP Drawings.pdf

PDF 16 MB Posted

Attached to
Evansdale Crossing Third and Fourth Floor Renovations
Solicitation number
RFP202690000697
Issued by
Mingo County, West Virginia

About this file

Exhibit F contains Mechanical, Electrical, and Plumbing (MEP) drawings for the Evansdale Crossing Third and Fourth Floor Renovations project at West Virginia University in Morgantown, West Virginia. The drawings detail comprehensive renovations to support a new testing center, offices, meeting rooms, and support spaces across approximately 62 Morrill Way. The project encompasses fire protection systems complying with NFPA 1 (2021 Amended), NFPA 13 (2016), and NFPA 20 (2016) standards, with FM Global project fire protection requirements. The plumbing scope includes installation of new fixtures such as water closets, lavatories, instantaneous electric water heaters (8 kW, 240V), water coolers, and associated supply and waste piping. The mechanical systems involve relocation and rebalancing of existing Variable Air Volume (VAV) boxes and Fan Powered VAV units, installation of new electric heating coils in terminal units, and coordination with existing rooftop units. The electrical work includes new lighting fixtures, power distribution, signal systems, and control panels throughout the renovated areas, with multiple existing panels including L3PA, L3PB, L3PC, L3PD, H3MA, H3LA, HGS, and LGS serving the space.

The drawings establish detailed specifications for hydraulic calculations based on water flow tests conducted within the previous 12 months, with design densities ranging from 0.10 to 0.15 GPM/SF depending on occupancy classification (Light Hazard and Ordinary Group 1). Fire protection piping must be concealed above ceilings or within walls, with sprinkler contractors prohibited from installing piping above electrical equipment. The project requires coordination among fire protection, plumbing, mechanical, and electrical contractors, with minimum 24-hour advance notice required for system shutdowns and two-week notice for major systems. All demolition of existing systems must be completed back to main lines within the scope of work areas, with salvaged items stored on-site as designated by the owner. The drawings contain comprehensive legends, abbreviations, schedules, and technical details for fixture connections, ductwork configurations, conduit support systems, and outlet specifications, establishing clear installation standards and coordination requirements across all mechanical, electrical, and plumbing trades.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT F - MEP DRAWINGS

• NFPA 1, 2021 - AMENDED

• NFPA 13, 2016 - NOT AMENDED

• NFPA 20, 2016 - NOT AMENDED

• FM GLOBAL PROJECT

FIRE PROTECTION - PROJECT CODES

FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR OBTAINING A CURRENT

WATER FLOW TEST FROM THE LOCAL WATER AUTORITY. THE OBTAINED FLOW

TEST MUST HAVE BEEN CONDUCTED WITHIN THE LAST 12-MONTHS OF THE

BEGINNING OF CONSTRUCTION OR A NEW FLOW TEST MUST BE PERFORMED

PRIOR TO PERFORMING HYDRAULIC CALCULATIONS FOR THIS PROJECT.

HYDRAULIC DESIGN DATA

CL

CONCEALED PIPING

CL

PIPING EXPOSED TO VIEW

SEAL SLEEVE THRU FIRE

RATED WALLS AND MAKE

FIREPROOF AND SMOKE TIGHT

PIPE TO BE CENTERED IN

SLEEVE. DO NOT

SUPPORT PIPE FROM

SLEEVE

TERMINATE SLEEVE

FLUSH WITH FINISH

WALL SURFACE

FINISHED WALL SURFACE

FIRE RATED PARTITION

SCHEDULE 40 STEEL PIPE

SLEEVE OF SIZE TO PASS PIPE.

ESCUTCHEON (TYPICAL)

PIPE

FINISHED ESCUTCHEON PLATE FLUSH

AGAINST WALL AND OF SIZE TO

COMPLETELY COVER OPENING (TYPICAL)

PROVIDE FIREPROOFING MATERIAL

BETWEEN PIPE SLEEVE AND PIPE.

FINISHED WALL SURFACE

CL

PIPE (SIZE AS INDICATED ON PLAN)

PROVIDE FIREPROOFING

MATERIAL BETWEEN

PIPE SLEEVE AND PIPE

SCHEDULE 40

STEEL PIPE SLEEVE

FINISHED FLOOR

TERMINATE PIPE SLEEVE

2" ABOVE FINISHED FLOOR

(SEE SPECIFICATIONS)

PIPE TO BE CENTERED IN

SLEEVE. DO NOT SUPPORT

PIPE FROM SLEEVE

PIPE INSULATION

SHALL TERMINATE

FLUSH AT FINISH

FLOOR

SCHEDULE 40 STEEL

PIPE SLEEVE

PROVIDE FIREPROOFING

MATERIAL BETWEEN PIPE SLEEVE

AND PIPE

INTERIOR WALLS

NOT TO SCALE NOT TO SCALE

PIPE SLEEVE THRU FLOOR DETAILPIPE SLEEVE THRU WALL DETAIL

SPRINKLER

BRANCH PIPING TEE CONNECTION

EXTENDED

ESCUTCHEON

SUSPENDED CEILING

RECESSED PENDENT

SPRINKLER

LENGTH AS

REQUIRED

RECESSED

PENDENT SPRINKLER

W/GUARD

RECESSED

PENDENT

SPRINKLER

CONCEALED

PENDENT

SPRINKLER

UPRIGHT

PENDENT

SPRINKLER

• LISTED/APPROVED: THE HOSES MUST BE LISTED FOR FIRE SPRINKLER USE (E.G., BY UL, FM).

• LENGTH: THE UNSUPPORTED LENGTH BETWEEN HANGERS CANNOT EXCEED 6 FEET (6'-0").

• ANCHORING: HANGERS MUST BE ATTACHED TO THE BUILDING STRUCTURE (JOISTS, BEAMS),

NOT JUST THE CEILING GRID, USING SECURE FASTENERS SUCH AS SELF-TAPPING SCREWS TO

ENSURE STABILITY

• CEILING STANDARDS: THE SUSPENDED CEILING ITSELF MUST MEET ASTM C635/C636

STANDARDS.

NFPA 13 KEY REQUIREMENTS FOR FLEXIBLE

SPRINKLER HOSE USAGE:

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C

U s e rs

\r s h o m o \A p p D a ta

\L o c a l\ A u to d e s k \R e v it L o c a l\ M

E P

-2 -1 x R rs h o m o .r v t

/3

/2

:3 :0

P

M

FP001

SYMBOLS AND

GENERAL NOTES

01/30/26

JMW

RGS

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

FIRE SPRINKLER DESIGN CATEGORY SCHEDULE

◊ CATEGORY

OCCUPANCY

CLASSIFICATION TYPE OF SPRINKLER SYSTEM

DESIGN AREA OF WATER

APPLICATION MINIMUM DENSITY

MAXIMUM AREA

PER SPRINKLER SPRINKLER TEMPERATURE RATING

SPRINKLER

"K" FACTOR SPRINKLER HEAD TYPE

HOSE STREAM

ALLOWANCE

HOSE STREAM ALLOWANCE

DURATION

2 MECHANICAL, ELECTRICAL, AND STORAGE ROOMS ORDINARY GROUP 1

HAZARD

WET PIPE 1500 SF .15 GPM/SF 130 SF 165 °F 5.6 STANDARD RESPONSE, STANDARD COVERAGE, BRONZE UPRIGHT 250 GPM 60 MINUTES

3 OFFICES, CORRIDORS AND RESTROOMS LIGHT HAZARD WET PIPE 1500 SF .10 GPM/SF 225 SF 155 °F 5.6 IN ACT OR GWB HARD CEILING - QUICK RESPONSE, STANDARD

COVERAGE, CONCEALED PENDENT WITH WHITE COVERPLATE, OR

BRONZE UPRIGHT IN AREAS WITH NO CEILING

100 GPM 60 MINUTES

FIRE PROTECTION DRAWING LIST - EVENSDALE

SHEET

NUMBER SHEET NAME 01/30/2026 - SET

FP001 SYMBOLS AND GENERAL NOTES X

FP103 THIRD FLOOR PLAN - AREA A - FIRE PROTECTION - DEMOLITION X

FP203 THIRD FLOOR PLAN - AREA A - FIRE PROTECTION - NEW WORK X

PIPE PENETRATION DETAIL

1. DO NOT SCALE DRAWINGS

2. ALL WORK PERFORMED ON THIS BUILDING SHALL BE IN COMPLIANCE WITH ALL PERTINENT CODES, RULES, ORDANCES, AND REGULATIONS OF THE LOCAL AND STATE GOVERNING AUTHORITIES.

3. ALL WORK PERFORMED AND IN CONNECTION WITH THESE DRAWINGS AND SPECIFICATIONS SHALL BE IN STRICT COMPLIANCE WITH THE LATEST OSHA SAFETY AND HEALTH STANDARDS MLS ELEC. SAFETY HANDBOOK

#GS-11294.

4. THE DRAWINGS, BY THEIR NATURE, CANNOT REVEAL ALL CONDITIONS THAT EXIST ON THE SITE. SHOULD CONDITIONS BE FOUND TO VARY SUBSTANTIALLY FROM THIS REPORT, CHANGES IN THE WORK WILL BE MADE WITH RESULTING CREDITS OR EXPENDITURES TO THE CONTRACT SUM ACCURING TO THE OWNER.

5. THE DRAWINGS INDICATE GENERAL LAYOUT AND DO NOT NECESSARILY REPRESENT A COMPLETE FIELD VERIFIED LAYOUT. THE MAJORITY OF FIRE PROTECTION ITEMS ARE SHOWN ON THE DRAWINGS. CERTAIN ITEMS ARE SHOWN AND INDICATED TO REMAIN OR BE REMOVED. GENERALLY, ALL FIRE PROTECTION DEMOLTION IS DESCRIBED BY THE NOTES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS WIHTIN THE DEMOLITION AREAS. REPORT ANY DISCREPANCIES FOUND TO THE ARCHITECT FOR CLARIFICATION

BEFORE PROCEEDING.

6. ALL FIRE PROTECTION EQUIPMENT, PIPING, ETC. INDICATED ON THE DRAWINGS, DESCRIBED IN THE NOTES, AND WHICH IS NOT REQUIRED TO FUNCTION AS PART OF THE FINAL SYSTEM, SHALL BE REMOVED IN ITS ENTIRETY.

ALL REMOVED MATERIAL, UNLESS DESIGNATED FOR SALVAGE, SHALL BE IMMEDIATELY REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL CODES AND REGULAITONS.

SALVAGED ITEMS SHALL BE STORED ON SITE IN A LOCATION DESIGNATED BY THE OWNER.

7. WHERE IT BECOMES NECESSARY TO TEMPORARILY DISTURB SYSTEMS TO PERMIT EXECUTION OF THE DEMOLITION PROCESS, IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE OWNER, THROUGH THE ARCHITECT, TO SCHEDULE A SHUTDOWN. THE DEMOLITION CONTRACTOR SHALL GIVE A MINIMUM OF 24-HOUR ADVANCE NOTICE FOR ANY SUCH GIVEN SHUTDOWN. IF THE SHUTDOWN INCLUDES MAJOR SYSTEMS, SUCH AS DOMESTIC FEED, STEAM, ELECTRICAL QMB PANELS, ETC., TWO-WEEK NOTICE SHALL

BE REQUIRED.

8. THE OWNER SHALL HAVE THE OPPORTUNITY TO TAG SPECIFIC ITEMS FOR SELECTIVE REMOVAL OF ITEMS WHICH SHALL REMAIN. THIS DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFE REMOVAL OF ANY SUCH TAGGED ITEMS. THIS CONTRACTOR SHALL PLACE IN STORAGE ON SITE ANY SUCH ITEMS AS DIRECTED BY THE OWNER. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL ITEMS TAGGED

TO REMAIN.

9. ALL EXISTING EXTERIOR WALLS AND SURFACES (EXCLUSIVE OR FURRED AREAS), SHAFT WALLS, WALLS ADJACENT TO DEMOLITION AREA TO REMAIN, SHALL BE PROTECTED FROM DAMAGE AND UNDISTURBED.

10. ANY SALVAGE VALUE ASSOCIATED WITH DEMOLITISHED ITEMS IS THE CONTRACTOR'S. THE CONTRACTOR

SHOULD USE ANY SALVAGE VALUE AS A MEAN OF REDUCING THEIR BID PRICE.

11. IF DURING THE COURSE OF DEMOLITION, EXISTING UTILITIES ARE ENCOUNTERED, WORK IN THAT AREA IS TO BE HALTED UNTIL THE STATUS OF THE THE UTILITIES HAS BEEN ASCERTAINED BY THE ARCHITECT AND AUTHORITY

TO PROCEED GIVEN BY THE ARCHITECT.

12. ALL CUTTING, DEMOLITION AND PATCHING OF EXISTING AND/OR EQUIPMENT IS TO BE PERFORMED BY THE

CONTRACTOR AND/OR EQUIPMENT UNLESS NOTED OTHERWISE.

13. WHERE DEMOLITION OF EXISTING CONSTRUCTION AND/OR EQUIPMENT OCCURS, PATCH AND REPAIR FLOOR, WALL AND CEILING CONSTRUCTION AND/OR FINISHES TO MATCH ADJACENT CONSTRUCTION AND/OR FINISHES.

FIRE PROTECTION DEMOLITION NOTES:

1. SPRINKLER SYSTEM COMPONENTS ARE INDICATED ON DRAWING FOR REVIEW AND INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL COMPONENTS FOR A COMPLETE

FIRE SUPPRESSION INSTALLATION AS PER THE INTENT OF THE PROJECT SCOPE OF WORK AND

SPECIFICATIONS. ALL SPRINKLER SYSTEM COMPONENT INSTALLATIONS SHALL CONFORM TO THE CODES AND AMENDMENTS INDICATED ON THIS SHEET, AND INSURANCE UNDERWRITER REQUIREMENTS. PIPE

SIZING SHALL BE BY HYDRAULIC CALCULATION.

2. ALL SPRINKLERS SHALL BE PLACED IN THE CENTER OF CEILING TILES WHERE CEILING TILES ARE LOCATED.

3. THE CONTRACTOR SHALL COORDINATE SPRINKLER INSTALLATION IN ALL AREAS WITH LIGHTING AND

DIFFUSER LOCATIONS.

4. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY CONTRACTOR AT THE

SITE.

5. ALL FIRE SPRINKLER PIPING SHALL BE CONCEALED ABOVE CEILING OR IN WALLS. IN AREAS WHERE THERE ARE NO CEILINGS, THE CONTRACTOR SHALL INSTALL THE FIRE SPRINKLER PIPING AS HIGH AS CONDITIONS

ALLOW.

6. THE CONTRACTOR SHALL OBTAIN CURRENT FIRE HYDRANT FLOW TEST DATA, WHICH MUST BE FROM A TEST PERFORMED WITHIN THE PAST YEAR PERIOD, OR SHALL PERFORM A NEW FIRE HYDRANT FLOW TEST

TO OBTAIN DATA.

7. THE CONTRACTOR SHALL LIMIT THE DESIGN WATER VELOCITIES OF HYDRAULICALLY DESIGNED SPRINKLER SYSTEMS TO NOT MORE THAN 20 FEET PER SECOND FOR ALL ABOVEGROUND SPRINKLER PIPING.

8. SPRINKLER CONTRACTOR SHALL BE PROHIBITED FROM THE INSTALLATION OF ANY AND ALL FIRE

SPRINKLER PIPING ABOVE ANY ELECTRICAL EQUIPMENT. THIS REQUIREMENT SHALL BE FULLY

COORDINATED BY SPRINKLER CONTRACTOR AND INDICATED AS SUCH AS PART OF SHOP DRAWING

SUBMITTALS.

9. SPRINKLER CONTRACTOR SHALL PROVIDE ALL DRY SPRINKLER SYSTEM INDIVIDUAL ZONE REMOTE INSPECTOR TEST CONNECTION(S) ALONG WITH ALL RELATED PIPING, AS REQUIRED PER NFPA 13, UNDERWRITER AND LOCAL AUTHORITY HAVING JURISDICTION. FULLY COORDINATE WITH PLUMBING

CONTRACTOR.

FIRE PROTECTION GENERAL NOTES:

TYPICAL PENDENT SPRINKLER DETAIL

BASIS OF DESIGNBASIS OF DESIGN

FM GLOBAL PROJECT

ANY FLEXIBLE PIPING USED ON THIS

PROJECT MUST SPECIFICALLY BE

FM GLOBAL APPROVED.

REVISIONS

1 2 3 4 5 6

A

B

C

D

SCOPE OF FIRE

PROTECTION

WORK AREA

SCOPE OF FIRE

PROTECTION

WORK AREA

SCOPE OF FIRE

PROTECTION

WORK AREA

SCOPE OF FIRE PROTECTION

WORK AREA

SYSTEM IMPAIRMENT:

• FIRE ALARM SYSTEM: IF OUT OF SERVICE FOR MORE THAN 4 HOURS IN A 24-HOUR PERIOD.

• AUTOMATIC SPRINKLER SYSTEM: IF OUT OF SERVICE FOR MORE THAN 10 HOURS IN A 24-HOUR PERIOD.

• LOCAL AUTHORITY: THE LOCAL AUTHORITY HAVING JURISDICTION (AHJ) MAY HAVE STRICTER REQUIREMENTS.

HOT WORK REQUIREMENT:

• SPARKS/SLAG: IF SPARKS OR HOT MATERIALS MIGHT SPREAD TO COMBUSTIBLES WITHIN 35 FEET OR THROUGH OPENINGS.

• COMBUSTIBLE EXPOSURE: IF COMBUSTIBLES ARE EASILY IGNITED BY SPARKS, EVEN IF FURTHER AWAY.

• CONCEALED SPACES: IF OPENINGS COULD EXPOSE HIDDEN COMBUSTIBLE MATERIALS.

• DURATION: MUST CONTINUE FOR AT LEAST ONE HOUR (OR AS DIRECTED) AFTER HOT WORK IS FINISHED.

CONTRACTOR'S RESPONSIBILITIES DURING A FIRE WATCH:

• CONTINUOUS PATROLS: REGULARLY CHECK ALL AREAS FOR SMOKE, FIRE, OR ISSUES.

• IMMEDIATE ACTION: ALERT EMERGENCY SERVICES AND OCCUPANTS TO ANY FIRE.

• EQUIPMENT KNOWLEDGE: KNOW THE LOCATION OF ALARMS AND EXTINGUISHERS.

• DOCUMENTATION: KEEP DETAILED LOGS OF THE WATCH.

FIRE WATCH - CONTRACTOR'S RESPONSIBILITY (NFPA 13/ NFPA 72)

ALL EXISTING SPRINKLER, DROPS, ARM OVERS, AND BRANCH PIPING TO BE

DEMOLISHED BACK TO THE MAIN SPRINKLER LINE WITHIN THE SCOPE OF

WORK AREA. CONTRACTOR AT THEIR DISCRETION TO EITHER CAP OR PLUG

WHERE REQUIRED.

DEMOLITION NOTE FOR AREA OF WORK:

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C

U s e rs

\r s h o m o \A p p D a ta

\L o c a l\ A u to d e s k \R e v it L o c a l\ M

E P

-2 -1 x R rs h o m o .r v t

/3

/2

:3 :0

P

M

FP103

THIRD FLOOR PLAN -

AREA A - FIRE

PROTECTION -

DEMOLITION

01/30/26

JMW

RGS

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

THIRD FLOOR - DEMOLITION

FIRE PROTECTION KEYNOTES

Key

Value Keynote Text

AA

BB

CC

D

ACCOMMODATIONS

BREAKROOM

TESTING CENTER

TESTING CENTER

MEN

WOMEN

MECH

IT CLOSET

OFFICE

STORAGE

KITCHEN

OFFICE

OFFICE

OFFICE

OFFICE

COLLABORATION

2 2

2 22

3 3

3 3 3 3

SCOPE OF FIRE

PROTECTION

WORK AREA

SCOPE OF FIRE

PROTECTION

WORK AREA

SCOPE OF FIRE

PROTECTION

WORK AREA

SCOPE OF FIRE PROTECTION

WORK AREA

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

3 3

11 2

FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR OBTAINING A CURRENT

WATER FLOW TEST FROM THE LOCAL WATER AUTORITY. THE OBTAINED FLOW

TEST MUST HAVE BEEN CONDUCTED WITHIN THE LAST 12-MONTHS OF THE

BEGINNING OF CONSTRUCTION OR A NEW FLOW TEST MUST BE PERFORMED

PRIOR TO PERFORMING HYDRAULIC CALCULATIONS FOR THIS PROJECT.

HYDRAULIC DESIGN DATA

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C

U s e rs

\r s h o m o \A p p D a ta

\L o c a l\ A u to d e s k \R e v it L o c a l\ M

E P

-2 -1 x R rs h o m o .r v t

/3

/2

:3 :3

P

M

FP203

THIRD FLOOR PLAN -

AREA A - FIRE

PROTECTION - NEW

WORK

01/30/26

JMW

RGS

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

THIRD FLOOR - NEW WORK

FIRE PROTECTION KEYNOTES

Key

Value Keynote Text

1 NFPA 13 SMALL ROOM RULE (3.3.196) - CLASSIFICATION: LIGHT HAZARD,

UNOBSTRUCTED, LESS THAN 800 SQ. FT

2 CONCEALED PENDENT SPRINKLER (TYPICAL

3 SPRINKLER CONTRACTOR SHALL BE PROHIBITED FROM THE INSTALLATION OF

ANY AND FIRE SPRINKLER PIPING ABOVE ANY ELECTRICAL EQUIPMENT. THIS

REQUIREMENT SHALL BE FULLY COORDINATED BY SPRINKLER CONTRACTOR

AND INDICATED AS SUCH AS PART OF SHOP DRAWING SUBMITTALS. (TYPICAL)

PLUMBING LEGEND

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

3-WAY VALVE CARBON DIOXIDE OUTLET

3-WAY SOLENOID VALVE DEIONIZED WATER OUTLET

WATER RISER (SIZE 5") GAS OUTLET

SANITARY/WASTE OR VENT STACK (SIZE 6") MEDICAL AIR OUTLET

AUTOMATIC AIR VENT MEDICAL VACUUM OUTLET

BACK FLOW PREVENTER NITROGEN OUTLET

BALANCING VALVE NITROUS OXIDE OUTLET

BALL VALVE LEVER OXYGEN OUTLET

BALL VALVE LOCKING W/ IDENTIFICATION REVERSE OSMOSIS OUTLET

OS & Y VALVE VACUUM OUTLET

BALL VALVE SOLENOID WATER OUTLET

BUTTERFLY VALVE LEVER WASTE ANESTHETIC GAS DISPOSAL OUTLET

BUTTERFLY VALVE MOTORIZED ACCESS/ZONE PANEL BOX 12x4

CHECK VALVE ACCESS/PANEL BOX 18x4

CIRCULATING PUMP PILOT OPERATED VALVE

CLEANOUT IN RISER PIPE ANCHOR

CLEANOUT EXTENDED UP TO FLOOR/GRADE PIPE BOTTOM CONNECTION

COMBINATION HOSE BIBB PIPE DOWN

CONCENTRIC REDUCER PIPE GUIDE

DIAPHRAGM VALVE PLUG VALVE

DOUBLE CHECK VALVE PRESSURE GAUGE

ECCENTRIC REDUCER PRESSURE REDUCING VALVE

CAP OR PLUG PRESSURE SWITCH

EXPOSED MIXING VALVE RECESSED MIXING VALVE

FILTER RELIEF VALVE

FLEX CONNECTION ROOF DRAIN (RD)

FLOOR DRAIN W/ OUT TRAP SECONDARY ROOF DRAIN (SRD)

FLOOR DRAIN CORNER CONNECTION SHOWER HEAD

FLOOR DRAIN SIDE CONNECTION STRAINER

FLOOR SINK WITH 1/2 GRATE TOP TEMPERATURE GAUGE

FLOOR SINK WITH 3/4 GRATE TOP TEMPERATURE SWITCH

FLOW DIRECTION ARROW TRAP PRIMER

FUNNEL DRAIN UNION

GAS COCK VALVE VALVE AND VALVE BOX

GAS PRESSURE REGULATOR VENTED WASTE FLOW VALVE

GATE VALVE WASHING MACHINE SUPPLY AND DRAIN UNIT

MOTORIZED VALVE HOSE BIBB

GATE VALVE OS & Y WALL HYDRANT

PRESSURE REGULATOR VALVE NEW CONNECTION TO EXISTING

SOLENOID VALVE INDICATES NOTE LOCATED ELSEWHERE ON

DRAWING

AND NOTE NUMBER

HAMMER ARRESTER SQUARE FOOT

METER

DETAIL/PLAN REFERENCE SYMBOL

AIR OUTLET INDICATES DRAWING No. FOR WHICH

THE

DETAIL/PLAN IS LOCATED.

INDICATES DETAIL/PLAN NUMBER

S

BP

S

M

F

R

M

S

M

A

X

FXXX

X

WH

HB

TP

TS

PS

WAGD

W

V

RO

O

NO

N

MV

MA

G

DE

CO

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

EXTEND ALL CLEANOUTS ON SEWER LINES BELOW SLAB ON GRADE TO FINISHED FLOOR LEVEL.

COORDINATE LOCATIONS OF ALL LINES AND EQUIPMENT WITH OTHER CONTRACTORS.

AT LOCATIONS INDICATED TO CONNECT NEW PLUMBING LINES TO EXISTING LINES; CONTRACTOR TO DETERMINE EXACT SIZE, LOCATION AND ELEVATION OF EXISTING LINES AT SITE BEFORE INSTALLING NEW LINES.

THE LOCATIONS, SIZES AND ELEVATIONS OF EXISTING LINES SHOWN ON PLAN ARE RESULTS OF INFORMATION OBTAINED FROM EXISTING DRAWING AND FIELD SURVEYS. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS, SIZE AND ELEVATIONS OF EXISTING LINES AT THE SITE BEFORE THE START OF NEW WORK.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH ALL UTILITY AUTHORITIES FOR INSTALLATION

REQUIREMENTS, REGULATIONS, FEES, PERMITS AND APPROVALS BEFORE THE START OF WORK.

ALL INTERIOR STORMWATER PIPING, 4" AND LARGER, SHALL BE SLOPED AT 1/8" PER FOOT, UNLESS NOTED OTHERWISE. ALL INTERIOR STORMWATER PIPING, 3" AND SMALLER, SHALL BE SLOPED AT 1/4" PER FOOT, UNLESS

OTHERWISE NOTED.

THE CONTRACTOR SHALL REFER TO APPLICABLE CODES DRAINAGE SYSTEM FITTINGS.

ALL INTERIOR, ABOVE GROUND, HORIZONTAL AND VERTICAL STORM DRAINAGE SYSTEMS SHALL BE INSULATED AS

SPECIFIED.

DIELECTRIC UNIONS AND FLANGES SHALL BE USED ON ALL CONNECTIONS BETWEEN DISSIMILAR METALS.

THE DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENTS OF ALL PIPING AND EQUIPMENT. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL

OFFSETS, FITTINGS, AND ACCESSORIES WHICH MAY BE REQUIRED.

ALL PIPE PENETRATIONS THROUGH CHASE, WALLS OR FLOORS WHICH ARE FIRE-RATED, SHALL BE PROPERLY SEALED TO MAINTAIN FIRE PROTECTIONS. CONTRACTOR SHALL SUMMIT PROPOSED UL LISTED SYSTEM FOR

REVIEW.

REPORT AND DISCREPANCIES FOUND IN THE DRAWINGS AND/OR IN THE SPECIFICATIONS DURING THE BIDDING

PROCESS FOR CLARIFICATION BY THE ENGINEER AND/OR ARCHITECT.

MEANS OF ACCESS SHALL BE PROVIDED TO CONCEALED TRAPS, VALVES, CLEANOUTS, DRAIN POINTS OR SIMILAR ITEMS. CONTRACTORS SHALL COORDINATE THE LOCATIONS AND QUANTITIES OF ALL ACCESS PANELS DURING

BIDDING PHASE. ACCESS PANELS WILL BE FURNISHED AND INSTALLED BY OTHERS.

FOLLOW THE REQUIREMENTS OF THE LATEST EDITION OF INTERNATIONAL PLUMBING CODE.

PROVIDE CLEANOUTS IN SANITARY AND STORM PIPING SYSTEMS AT ENDS OF RUNS, AT CHANGES IN DIRECTION, AT BASE OF STACKS, AND AT 50 FOOT INTERVALS IN HORIZONTAL PIPING, AND ELSEWHERE AS INDICATED.

ALL PIPING NOTED ABOVE OR AT CEILING, SHALL BE TIGHT TO UNDERSIDE OF FLOOR SLAB WITH THE SPACE FOR

INSULATION AND HANGERS AS REQUIRED.

WHERE DOMESTIC COLD WATER, DOMESTIC HOT WATER, DOMESTIC HOT WATER RETURN, AIR OXYGEN, VACUUM AND NITROGEN LINES ARE NOTED TO BE RUN AT CEILING AND/OR ABOVE CEILING, RUN LINES AS HIGH AS POSSIBLE.

WHERE SANITARY SEWER, SANITARY AND VENT LINES ARE NOTED TO BE RUN AT CEILING, ABOVE CEILING AND/OR BELOW FLOOR, RUN LINES AS HIGH AS POSSIBLE UNLESS LINES ARE RUN BELOW SLAB ON GRADE.

PLUMBING GENERAL NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

DO NOT SCALE DRAWINGS

ANY SALVAGE VALUE ASSOCIATED WITH DEMOLISHED ITEMS IS THE CONTRACTOR'S. THE CONTRACTOR SHOULD

USE ANY SALVAGE VALUE AS A MEANS OF REDUCING THEIR BID PRICE.

ALL WORK PERFORMED ON THIS BUILDING SHALL BE IN COMPLIANCE WITH ALL PERTINENT CODES, RULES, ORDINANCES, AND REGULATIONS OF THE LOCAL AND STATE GOVERNING AUTHORITIES.

ALL WORK PERFORMED AND IN CONNECTION WITH THESE DRAWINGS AND SPECIFICATIONS SHALL BE IN STRICT COMPLIANCE WITH THE LATEST OSHA SAFETY AND HEALTH STANDARDS MLS ELEC. SAFETY HANDBOOK #GS-11294.

THESE DRAWINGS, BY THEIR NATURE, CANNOT REVEAL ALL CONDITIONS THAT EXIST ON THE SITE. SHOULD CONDITIONS BE FOUND TO VARY SUBSTANTIALLY FROM THIS REPORT, CHANGES IN THE WORK WILL BE MADE WITH

RESULTING CREDITS OR EXPENDITURES TO THE CONTRACT SUM ACCRUING TO THE OWNER.

THE DRAWINGS INDICATE GENERAL LAYOUT AND DO NOT NECESSARILY REPRESENT A COMPLETE FIELD VERIFIED LAYOUT. THE MAJORITY OF MECHANICAL ITEMS ARE SHOWN ON THE DRAWINGS. CERTAIN ITEMS ARE SHOWN AND INDICATED TO REMAIN OR BE REMOVED. GENERALLY, ALL MECHANICAL DEMOLITION IS DESCRIBED BY THE NOTES.

THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS WITHIN THE DEMOLITION AREAS. REPORT ANY

DISCREPANCIES FOUND TO THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING.

ALL PLUMBING FIXTURES, EQUIPMENT, PIPING, ETC. INDICATED ON THE DRAWINGS DESCRIBED IN THE NOTES AND WHICH IS NOT REQUIRED TO FUNCTION AS PART OF THE FINAL SYSTEM, SHALL BE REMOVED IN ITS ENTIRETY. ALL REMOVED MATERIAL, UNLESS DESIGNATED FOR SALVAGE, SHALL BE IMMEDIATELY REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL CODES AND REGULATIONS. SALVAGED

ITEMS SHALL BE STORED ON SITE IN A LOCATION DESIGNATED BY THE OWNER.

WHERE IT BECOMES NECESSARY TO TEMPORARILY DISTURB SYSTEMS TO PERMIT EXECUTION OF THE DEMOLITION PROCESS, IT SHALL BE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE OWNER, THROUGH THE ARCHITECT, TO SCHEDULE A SHUTDOWN. THE DEMOLITION CONTRACTOR SHALL GIVE A MINIMUM OF 24-HOUR ADVANCED NOTICE FOR ANY SUCH GIVEN SHUTDOWN. IF THE SHUTDOWN INCLUDES MAJOR SYSTEMS, SUCH AS DOMESTIC FEED, STEAM, ELECTRICAL QMB PANELS, ETC., TWO-WEEK NOTICE SHALL BE REQUIRED.

THE OWNER WILL BE TAGGING SPECIFIC ITEMS FOR SELECTIVE REMOVAL FOR ITEMS WHICH SHALL REMAIN. THIS DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFE REMOVAL OF ANY SUCH TAGGED ITEMS. THIS CONTRACTOR SHALL PLACE IN STORAGE ON SITE ANY SUCH ITEMS AS DIRECTED BY THE OWNER. THIS

CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL ITEMS TAGGED TO REMAIN.

ALL EXISTING EXTERIOR WALLS AND SURFACES (EXCLUSIVE OR FURRED AREAS), SHAFT WALLS, WALLS ADJACENT

TO DEMOLITION AREA TO REMAIN, SHALL BE PROTECTED FROM DAMAGE AND UNDISTURBED.

THE PLUMBING CONTRACTOR SHALL SCHEDULE HIS WORK WITH THE ARCHITECT IN ORDER TO HAVE THE ELECTRICAL CONTRACTOR DISCONNECT AND RECONNECT ALL CIRCUITS ASSOCIATED WITH THE FIRE ALARM SYSTEM. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY CONFLICTS WITH A LIFE SAFETY SYSTEM ON

ELEMENTS THAT ARE INDICATED TO BE REMOVED.

ALL RAIN WATER CONDUCTORS AND ASSOCIATED VENT STACKS SHALL REMAIN INTACT AND NOT BE DISTURBED THROUGHOUT THE DEMOLITION PROCESS. THE CONTRACTOR SHALL INSTALL BRACING AND BRACKETS AS NECESSARY FOR SUPPORT OF PIPING DUE TO IMPACT OF DEMOLITION OF WALL/CEILING SYSTEM.

THE PLUMBING CONTRACTOR SHALL INCLUDE IN HIS BID THE COST OF DISCONNECTING AND REMOVING ALL PLUMBING EQUIPMENT, PIPING, LOUVERS, DUCTWORK, GRILLES, CONTROLS, ETC., COMPLETE BUT NOT REQUIRED TO FUNCTION UNDER THIS CONTRACT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND CLEAN- UP OF ALL DEBRIS ASSOCIATED WITH THE DEMOLITION OF PLUMBING ITEMS. HE SHALL REFER TO THE ARCHITECT'S

PHASING PLAN FOR THE SCHEDULING OF HIS WORK.

THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND PAINTING ALL REMAINING OPENINGS IN THE INTERIOR WALLS, FLOORS, AND CEILINGS. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

PATCHING, ETC., OF ALL REMAINING OPENINGS THROUGH EXTERIOR WALLS AND ROOF.

IF DURING THE COURSE OF DEMOLITION, EXISTING UTILITIES ARE ENCOUNTERED, WORK IN THAT AREA IS TO BE HALTED UNTIL THE STATUS OF THE UTILITIES HAS BEEN ASCERTAINED BY THE ARCHITECT AND AUTHORITY TO

PROCEED GIVEN BY THE ARCHITECT.

WHERE DEMOLITION OF EXISTING CONSTRUCTION AND/OR EQUIPMENT OCCURS, PATCH AND REPAIR FLOOR, WALL AND CEILING CONSTRUCTION AND/OR FINISHES TO MATCH ADJACENT CONSTRUCTION AND/OR FINISHES.

ALL CUTTING, DEMOLITION AND PATCHING OF EXISTING PLUMBING SYSTEMS AND/OR EQUIPMENT IS TO BE

PERFORMED BY THE PLUMBING CONTRACTOR UNLESS NOTED OTHERWISE.

PLUMBING DEMOLITION GENERAL NOTES :

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\p al ex an de r\A pp D at a\

Lo ca l\A ut od es k\ R ev it_

Lo ca l\M

EP

-2

5-x0

1_ R

_P

Al ex an de rV 8F

VS

.rv t 1/

/2

2:

:4

PM

P001

SYMBOLS,

ABBREVIATIONS AND

GENERAL NOTES

01/30/26

Checker

Author

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

PLUMBING ABBREVIATIONS

ABV ABOVE

AFF ABOVE FINISHED FLOOR

BLW BELOW

C COLD WATER

CLG CEILING

DN DOWN

DCVA DOUBLE CHECK VALVE ASSEMBLY

DFU DRAINAGE FIXTURE UNIT

DWH DOMESTIC WATER HEATER

E EXISTING

EF EMERGENCY FIXTURE

EWC ELECTRIC WATER COOLER

FLR FLOOR

FD FLOOR DRAIN

FNL FUNNEL DRAIN

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

H HOT WATER

HB HOSE BIBB

HC HEATING CONTRACTOR

HWBP HUMIDIFICATION WATER BOOSTER PUMP

HWR HOT WATER RETURN

INV ELEV INVERT ELEVATION

L LAVATORY

MC MECHANICAL CONTRACTOR

PC PLUMBING CONTRACTOR

RD ROOF DRAIN

RPZBP REDUCED PRESSURE ZONE BACKFLOW PREVENTER

S SINK

SC SITE CONTRACTOR

SH SHOWER

SS SANITARY CONTRACTOR

SPC SPRINKLER CONTRACTOR

SQ FT SQUARE FOOT

TYP TYPICAL

U URINAL

V VENT

VTR VENT THROUGH ROOF

W WATER CLOSET

WH WALL HYDRANT

WS WASTE STACK

WSFU WATER SUPPLY FIXTURE UNIT

B

C

D

E E

E

E

E E

E

E

E

WOMEN

MEN

CUSTODIAL

E4

MECH

IT CLOSET

OFFICE

TESTING CENTER

KITCHEN

359BREAKROOM

CUBICLE

333CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

STAIR

S01

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

OFFICE

OFFICE

OFFICE

CUBICLE

CUBICLE

OFFICE

E

DEMOLISH EX REFRIGERATOR

AN REMOVE ASSOCIATED

COLD WATER LINE BACK TO

EX MAIN BRANCH AND CAP

EX SINK & EX EXINSTANTANEOUS

WATER HEATER UNDER

COUNTER TO REMAIN

CAP

1/2"CW

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"1 THIRD FLOOR - DEMOLITION

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\p al ex an de r\A pp D at a\

Lo ca l\A ut od es k\ R ev it_

Lo ca l\M

EP

-2

5-x0

1_ R

_P

Al ex an de rV 8F

VS

.rv t 1/

/2

2:

:5

PM

P103

THIRD FLOOR PLAN -

AREA A - PLUMBING -

DEMOLITION

01/30/26

Checker

Author

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

KEYNOTES

Key

B

C

D

E E

E

E

E E

E

E

E W-1

L-1

WOMEN

E4MECH

IT CLOSET

OFFICE

TESTING CENTER

ACCOMMODATIONS

318 BREAKROOM

STORAGE

KITCHEN

MEN

LOUNGE

CUBICLE

CUBICLE

COLLABORATION

CUBICLE

CUBICLE

OFFICE

OFFICE

350 OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

TESTING CENTER

OFFICE

OFFICE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

CUBICLE

STAIR

S01

S05

FLOOR

MOUNTED

ER

CUSTODIAL

P301

EX 3" VENT RISER

EX 4" SAN. RISER

EX 3" CW RISER

P301

D-1 2" W-DN

1 1/2" V-UP

DWH-1

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"1 THIRD FLOOR - NEW WORK

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\p al ex an de r\A pp D at a\

Lo ca l\A ut od es k\ R ev it_

Lo ca l\M

EP

-2

5-x0

1_ R

_P

Al ex an de rV 8F

VS

.rv t 1/

/2

2:

:5

PM

P203

THIRD FLOOR PLAN -

AREA A - PLUMBING -

NEW WORK

01/30/26

Checker

Author

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

KEYNOTES

Key

4 5 6

B

BREAKROOM

TESTING CENTER

STORAGE

KITCHEN

MEN

LOUNGE

CUSTODIAL

WOMEN

E E

E

E

E E

E

E

E

W-1

L-1

FLOOR

MOUNTED

ER

UNDERMOUNT W/

INSTANTANEOUS

WATER HEATER

(*DWH-1)

EX SINK & EX INSTANTANEOUS

WATER HEATER UNDER

COUNTER TO REMAIN

EX 3" CW RISER

ABV CLG

EX PIPING IN

CHASE TO REMAIN

E

E

1 1/4" CW

1 1/4" CW

EX 1/2" CW

1" CW-DN

DF-1

A.P.

R

E

E

E

E

1/2" CW-DN

ABV CLG

4 5 6

B

E E E

E E

E

W-1

EX 3" VENT STACK

BLW FLR

EX PIPING IN

CHASE TO REMAIN

E

E4" W

2"W TOP

CONNECTION

2"W-DN

2"V-UP

CO

RE

E E

E

E

E

E

L-1

D-1

2"W-DN1

1/2"V-UP

4" W-DN

BLW

FLR

BREAKROOM

TESTING CENTER

STORAGE

KITCHEN

MEN

CUSTODIAL

WOMEN

LOUNGE

ABV CLG

EX 4" WASTE STACK

E

EX V HIGH IN CHASE

EX W BLW FLR

EX 2"V-UP

EX WATER

HEATER

1 1/2" W

2" SV

BLW FLR

ABV CLG

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\p al ex an de r\A pp D at a\

Lo ca l\A ut od es k\ R ev it_

Lo ca l\M

EP

-2

5-x0

1_ R

_P

Al ex an de rV 8F

VS

.rv t 1/

/2

2:

:5

PM

P301

ENLARGED PLANS -

PLUMBING

01/30/26

Checker

Author

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

KEYNOTES

Key

Value Keynote Text

SCALE: 1/4" = 1'-0"1 ENLARGED PLAN - DOMESTIC WATER

SCALE: 1/4" = 1'-0"2 ENLARGED PLAN - SANITARY & VENT

AS SPECIFIED.

EXISTING FIXTURE TO REMAIN

SUFFIXES FOR FIXTURE LETTERS

REFER TO PROJECT SPECIFICATIONS

SPECIALTIES AND EQUIPMENT.

FOR PLUMBING ACCESSORIES,

2.

NOTE:

E

1.

1/2"H & C

REFER TO SPECIFICATIONS FOR REQUIREMENTS OF MATERIALS, COLOR, FINISHES, INSTALLATION, APPROVED EQUAL MANUFACTURERS, ETC..

PROVIDE COMPLETE WITH SUPPLY AND WASTE ROUGH-IN ASSEMBLIES IN ACCORDANCE WITH SPECIFICATIONS.

3.

1.

2.

LAVATORY

WATER CLOSET 1"C

REQUIREMENTS

L-1

IDENTIFICATION

FIXTURE

21 1/4" OVAL

LAVATORY

VITREOUS CHINA

COUNTER

UNDERMOUNT

ADA

DESCRIPTION MOUNTING FOOTNOTES AND REMARKS

FIXTURE MANUFACTURER AND

MODEL NUMBER

(OR APPROVED EQUAL)

1, 2, 3

(OR APPROVED EQUAL)

AND MODEL NUMBER

FIXTURE ACCESSORIES MAKE

WATER CLOSET

LAVATORY

1 1/2"W & V 4"S & 2"V

L W

Caxton®

21-1/4" OVAL UNDERMOUNT

BATHROOM SINK

K-2211-0 Z81101-XL-HCT-3M

ZURN

4" CENTERSET FAUCET

PROVIDE WITH ASSE 1070 THERMOSTATIC MIXING VALVE AT EACH FAUCET: Leonard's ECO-MIX™ (Model 270-LF) 0.25 GPM.

WATER

PLUMBING FIXTURE CONNECTION SCHEDULE

LAVATORIES AND SINK FOOTNOTES:

FIXTURE

LAVATORIES AND SINKS

PLUMBING FIXTURE ABBREVIATIONS

WASTE, SOIL & VENT (UNO)

WATER CLOSETS

WATER CLOSETS AND URINAL FOOTNOTES:

FIXTURE

IDENTIFICATION DESCRIPTION

MOUNTING

REQUIREMENT

S

FIXTURE MANUFACTURER

AND

MODEL NUMBER

(OR APPROVED EQUAL)

FIXTURE ACCESSORIES

MAKE

AND MODEL NUMBER

(OR APPROVED EQUAL)

FOOTNOTE

S

AND

REMARKS

W-1 WATER CLOSET

1.6/1.1 GALLON PER FLUSH

ZURN

Z5655

SLOAN UPPERCUT

WES-111 1, 2

1. REFER TO SPECIFICATIONS FOR REQUIREMENTS OF MATERIALS, COLOR, FINISHES, INSTALLATION, APPROVED EQUAL MANUFACTURERS, ETC..

2. PROVIDE COMPLETE WITH SEAT, SUPPLY ROUGH-IN AND WASTE ROUGH-IN ASSEMBLIES IN ACCORDANCE WITH SPECIFICATIONS.

FLR MTD

STD HT

INSTANTANEOUS ELECTRIC POINT OF USE WATER HEATER SCHEDULE

TOILET ROOM

WATER

HEATER

NUMBER

LOCATION FUEL TYPE

IN OUT

WATER TEMP

DEG F MIN/MAX GPM

FLOW REMARKS

ELECTRIC

8 kW, 240VDWH-1 0.3/4.812045

Eemax ProSeries™ For Single Point-of-Use Tankless Electric Water Heater Model# PR008240

WATER COOLER FOOTNOTES :

WATER COOLERS/BOTTLE FILLERS SCHEDULE

PROVIDE WITH SUPPLY AND WASTE ROUGH-IN ASSEMBLIES IN ACCORDANCE WITH SPECIFICATIONS.

REFER TO SPECIFICATIONS FOR REQUIREMENTS OF MATERIALS, COLOR, FINISHES, INSTALLATION, APPROVED EQUAL MANUFACTURERS, ETC..

3.

2.

1.

CONTRACTOR TO ENSURE THAT INSTALLATION MEETS OR EXCEEDS ALL ADA GUIDELINES.

FIXTURE

IDENTIFICATION DESCRIPTION

(OR APPROVED EQUAL)

AND MODEL NUMBER

FIXTURE ACCESSORIES MAKE

MODEL NUMBER

(OR APPROVED EQUAL)

FIXTURE MANUFACTURER ANDMOUNTING

REQUIREMENTS FOOTNOTES AND REMARKS

D-1 1, 2, 3

WALL MTD

ADA

ACCESSIBLE

OASIS, VERSACOOLER™ SINGLE DRINKING

FOUNTAIN, REFRIGERATED & ELECTRONIC

BOTTLE FILLER, TOTAL PFAS FILTER

MODEL PG8FEBF-FPF

BOTTLE FILLING STATION &

ELECTRIC WATER COOLER

OASIS TOTAL PFAS REPLACEMENT

CARTRIDGE (2)

(L-1) LAVATORY

1/2" 1/2"

1/2" COLD WATER SUPPLY

LINE. RUN ALONG WALL

FOR CONTINUATION OF

PIPING SEE FLOOR PLAN

FINISHED FLOOR

VALVE (TYP)

RUN 1/2" COLD WATER LINE ALONG WALL

AND CONNECT TO WATER HEATER

INSTANTANEOUS POINT OF USE WATER

HEATER: FOR (L-1) LAVATORY

MOUNTED ON WALL BELOW SINK (SEE

SCHEDULE AND SPECIFICATION)

THERMOSTATIC MIXING VALVE

CERTIFIED TO MEET ASSE 1070.

SET OUTLET TEMPERATURE TO 105°

OR AS DIRECTED BY OWNER PERSONNEL.

UNION (TYP)

PROVIDE TRUEBRO LAV GUARD (OR

APPROVED EQUAL) ON ALL EXPOSED

PIPING BENEATH HANDICAPPED

ACCESSIBLE LAVATORY(S)

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\p al ex an de r\A pp D at a\

Lo ca l\A ut od es k\ R ev it_

Lo ca l\M

EP

-2

5-x0

1_ R

_P

Al ex an de rV 8F

VS

.rv t 1/

/2

2:

:5

PM

P500

SCHEDULES &

DETAILS - PLUMBING

01/30/26

Checker

Author

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

SCALE: 1/8" = 1'-0"4 INSTANTANEOUS WATER HEATER DETAIL (DWH-1)

MECHANICAL LEGEND (Misc.)

SYMBOL DESCRIPTION

SPACE STATIC PRESSURE SENSOR

STATIC PRESSURE SENSOR

THERMOSTAT, ELECTRIC

THERMOSTAT, PNEUMATIC

SUPPLY DIFFUSER; 4-WAY THROW UNLESS

NOTED OTHERWISE

THERMOSTAT, PNEUMATIC

AIR FLOW ARROW

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

INDICATES NOTES ELSEWHERE ON DRAWING

DIFFERENTIAL PRESSURE SENSOR

CONNECTION BETWEEN NEW AND EXISTING

DOOR UNDERCUT 1" ABOVE FINISHED FLOOR

DISCONNECTION POINT

DUCT MOUNTED STATIC PRESSURE SENSOR

REVISION NUMBER

FLOW METER, DDC

HUMIDISTAT, ELECTRIC

HUMIDISTAT, PNEUMATIC

PE SWITCH ABOVE CEILING (WITH ACCESS PANEL)

PE SWITCH EXPOSED

PRESSURE SENSOR

REFRIGERANT SENSOR

SMOKE DETECTOR

C O

DP

UC

S D

FM

H

H

P S

R

S

SD

SP

T

T

C O 2

M-501

DETAIL NUMBER OR SECTION LETTER

DRAWING NUMBER WHERE DETAIL IS

DRAWN

M501

DETAIL NUMBER OR SECTION LETTER

DRAWING NUMBER WHERE DETAIL IS DRAWN

DRAWING NUMBER WHERE SYMBOL IS USED

M101

M-501

SECTION LETTER

DRAWING NUMBER WHERE SECTION IS

DRAWN

M501

SECTION LETTER

DRAWING NUMBER WHERE SECTION IS DRAWN

DRAWING NUMBER WHERE SECTION IS CUT

M101

DUCTWORK LEGEND

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

CONICAL TAKEOFF CONNECTION

CONICAL TAKEOFF CONNECTION

BELLMOUTH TAKEOFF CONNECTION

STRAIGHT ROUND TAKEOFF CONNECTION

STRAIGHT "T" CONNECTION

PNEUMATIC OPERATED DAMPER

COMBINATION FIRE / SMOKE DAMPER

SMOKE DAMPER

FIRE DAMPER

MOTOR OPERATED DAMPER

HUMIDIFIER IN DUCT

FILTER SECTION IN DUCT

DUCT TRANSITION

PERFORATED PLATE DAMPER

VOLUME CONTROL DAMPER

ELECTRIC COIL IN DUCT

COIL IN DUCT

ACOUSTIC DUCT LINING

FLEXIBLE CONNECTION

FLAT OVAL (SHOWN x HIDDEN)

ROUND DUCT (DIAMETER)

EXISTING DUCT TO REMAIN (LIGHT LINE WORK)

DUCTWORK TO BE REMOVED

FLEXIBLE DUCTWORK

DUCT (SHOWN x HIDDEN)

SUPPLY/OUTDOOR/MAKE-UP AIR RECTANGULAR

DUCT SECTION

RETURN/TRANSFER/RELIEF AIR RECTANGULAR

DUCT SECTION

EXHAUST AIR RECTANGULAR DUCT

SECTION

SUPPLY/OUTDOOR/MAKE-UP AIR OVAL DUCT

SECTION

RETURN/TRANSFER/RELIEF AIR OVAL DUCT

SECTION

EXHAUST AIR OVAL DUCT SECTION

SUPPLY/OUTDOOR/MAKE-UP AIR ROUND DUCT

SECTION

RETURN/TRANSFER/RELIEF AIR ROUND DUCT

SECTION

EXHAUST AIR ROUND DUCT SECTION

LOUVER IN WALL

SQUARE ELBOW WITH TURNING VANES

RADIUS ELBOW

RECTANGULAR BOOT CONNECTION

CONICAL "T" CONNECTION

12x8

12ᴓ

12/8

FC

CONTROL PANEL

VCD

PPD

M

F

S

C

MECHANICAL ABBREVIATIONS

ABV ABOVE

AHC AUXILIARY HEATING COIL

AHU AIR HANDLING UNIT

BDD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CFM CUBIC FEET PER MINUTE

CHAR CHARACTERISTIC

COL COLUMN

DN DOWN

EA EXHAUST AIR

EAT ENTERING AIR TEMP

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

EGC EXHAUST GRILLE CEILING

ELEC ELECTRICAL

ESP EXTERNAL STATIC PRESSURE

FD FIRE DAMPER

FP FAN POWERED

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

HP HORSEPOWER

HUH HORIZONTAL UNIT HEATER

HWP HOT WATER PUMP

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

IN INCH

KHE KITCHEN HOOD EXHAUST

LAT LEAVING AIR TEMP

LF LINEAR FEET

LP LOW PRESSURE

MAX MAXIMUM

MBH THOUSAND BRITISH THERMAL UNITS PER HOUR

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPERAGE

MIN MINIMUM

MOCP MAXIMUM OVERLOAD CIRCUIT PROTECTION

OA OUTDOOR AIR

PC PLUMBING CONTRACTOR

RA RETURN AIR

RGC RETURN GRILLE CEILING

RPM REVOLUTIONS PER MINUTE

RTU ROOFTOP UNIT

SA SUPPLY AIR

SD SMOKE DETECTOR

SDC SUPPLY DIFFUSER CEILING - (THROWS)

SSAHU SPLIT SYSTEM AIR HANDLING UNIT

TGC TRANSFER GRILLE CEILING

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

VCD VOLUME CONTROL DAMPER

VVB VARIABLE VOLUME BOX

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

THE HEATING CONTRACTOR SHALL COORDINATE WITH THE OTHER CONTRACTORS IN THE LOCATION OF DUCTWORK, PIPING, ETC.

THE HEATING CONTRACTOR SHALL VISIT AND THOROUGHLY ACQUAINT HIMSELF WITH THE EXISTING SYSTEM AND CONDITIONS IN THE AREAS HE

WILL BE REQUIRED TO WORK BEFORE ISSUING HIS BID.

THE HEATING CONTRACTOR SHALL RELOCATE EXISTING SYSTEMS WHERE CONFLICTS WITH NEW WORK EXIST TO ACCOMMODATE NEW WORK.

ALL INTERRUPTIONS OF EXISTING SYSTEMS SHALL BE SCHEDULED IN ADVANCE WITH THE OWNER AND APPROVED BEFORE WORK COMMENCES.

ALL DUCTWORK SHALL BE INSTALLED AS HIGH AS POSSIBLE UNLESS NOTED OTHERWISE.

DO NOT SCALE DRAWINGS - ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR AT THE SITE.

NOTIFY ARCHITECT OF ANY DEVIATIONS FROM THE DRAWINGS.

THE DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENTS OF ALL EQUIPMENT. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL OFFSETS, FITTINGS, AND ACCESSORIES WHICH MAY BE REQUIRED TO AVOID

STRUCTURAL FEATURES.

ALL CONDUIT, DUCTWORK, ETC., SHALL BE INSTALLED IN A MANNER WHICH WILL NOT DEFACE OR ALTER ANY AREAS. ROUTING OF THE ABOVE

EQUIPMENT SHALL BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION.

ALL WORK PERFORMED ON THIS BUILDING SHALL BE IN COMPLIANCE WITH ALL PERTINENT CODES, RULES, ORDINANCES, AND REGULATIONS OF

THE LOCAL, STATE, AND NATIONAL GOVERNING AUTHORITIES.

ALL WORK PERFORMED UNDER AND IN CONNECTION WITH THESE DRAWINGS AND SPECIFICATIONS SHALL BE IN STRICT COMPLIANCE WITH THE

LATEST SAFETY AND HEALTH STANDARDS.

REPORT ANY DISCREPANCIES FOUND IN THE DRAWINGS AND/OR IN THE SPECIFICATIONS DURING THE BIDDING PROCESS FOR CLARIFICATION BY

THE ARCHITECT.

HEATING CONTRACTOR SHALL PROVIDE AND INSTALL ACCESS PANELS AS REQUIRED FOR ACCESS TO VALVE, TRAPS, CLEAN-OUTS, CONTROLS, FIRE DAMPERS, ETC. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ACCESS PANELS WITH FINISH WORK AND ALL OTHER TRADES.

THE HEATING CONTRACTOR SHALL FURNISH SHOP DRAWINGS OF ANY RELOCATED DUCTWORK, EQUIPMENT, ETC. FOR APPROVAL PRIOR TO

RELOCATION OF ITEM.

ALL DUCTWORK TO BE LOCATED AND COORDINATED WITH ARCHITECTURAL PLANS. ALL DUCTWORK SHALL BE CONCEALED IN FINISHED AREA.

ALL DUCTS THAT PENETRATE CHASES, WALLS, OR FLOORS WHICH ARE FIRE RATED, SHALL BE INSTALLED WITH FIRE DAMPERS IN ACCORDANCE WITH NFPA 90A. THIS APPLIES EVEN IF THEY ARE NOT SPECIFICALLY SHOWN ON THE DRAWING.

ANY PHYSICAL INSTALLATION MODIFICATIONS, DUE TO FIELD CONDITIONS, SHALL BE RESOLVED BY THE HEATING CONTRACTOR IN ACCORDANCE

WITH THE RECOMMENDATIONS OF THE MECHANICAL ENGINEER.

THE HEATING CONTRACTOR SHALL PAY FOR ALL FEES AND PERMITS AS NECESSARY TO COMPLETE THE INSTALLATION.

THE HEATING CONTRACTOR SHALL COORDINATE THE LOCATION OF DUCTWORK WITH ALL EXISTING PIPING.

ALL DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR ABOVE SUSPENDED CEILING.

ALL LIGHT LINES SHOWN ON DRAWINGS INDICATE EXISTING EQUIPMENT CONSTRUCTION OR EQUIPMENT TO REMAIN. ALL HEAVY LINES INDICATE NEW CONSTRUCTION OR EQUIPMENT. ALL CROSS-HATCHED LINES INDICATE REMOVAL OF EXISTING CONSTRUCTION OR EQUIPMENT.

MECHANICAL GENERAL NOTES :

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

ALL DUCTWORK SIZES NOTED ARE FREE AREA SIZES.

RADIUS ELBOWS SHALL BE PROVIDED. TURNING VANES SHALL NOT BE PROVIDED UNLESS APPROVED BY ENGINEER.

ALL DUCT JUNCTIONS SHALL BE CONSTRUCTED OF STANDARD 45 DEGREES ENTRY BRANCHES WITH BALANCING DAMPERS DOWNSTREAM OF DUCT BRANCH ENTRY.

MAXIMUM LENGTH OF FLEXIBLE DUCTWORK SHALL CONTAIN IN ANY ONE SUPPLY BRANCH SHALL BE THREE (3) FEET.

NO RUN OF FLEXIBLE DUCTWORK SHALL CONTAIN MORE THAN A TOTAL OF 90 DEGREES OF TURN. INSULATED RIGID SHALL BE USED WHERE MORE THAN 90 DEGREES IS REQUIRED.

TOTAL STATIC PRESSURE NOTED IN SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.

CEILING DIFFUSER SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES.

PROVIDE FLEXIBLE DUCT CONNECTION BETWEEN AHU/EXH FAN AND DUCTWORK.

FIRE DAMPERS SHALL BE TYPE 'C'

DUE TO THE SMALL SCALE OF THE DRAWINGS, RISERS, AND DROPS ARE NOT ALL SHOWN. PROVIDE RISERS AND DROPS FOR COORDINATION.

FIRST FIGURE OF DUCT SIZE INDICATES DIMENSIONS OF FACE SHOWN OR INDICATED.

MECHANICAL DUCTWORK NOTES :

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\le ic he lb er ge r\A pp

D at a\ Lo ca l\A ut od es k\

R ev it_ Lo ca l\M

EP

-2

5-x0 1_

R

_L Ei ch el be rg er

BV

FX

Q

.rv t

1/

/2

2:

:4

PM

M001

SYMBOLS , NOTES , &

ABBREVIATIONS

01/30/26

JMW

MMR

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

T

T

T

T

T

T

T

T

T

T

T

T

T

T

1 2 3 4 5 6

A

B

C

D

28x16 SA 40x16 SA x2

SA

x2

R

A

24x14 SA x1

SA

EX.

FPVAV-3W4

EX.

FPVAV-3W5

EX. VAV-3W5

EX. VAV-3W4

EX.

FPVAV-3W6

EX. VAV-3W6

EX. VAV-3W7

EX. VAV-3W8

EX. VAV-3W1

EX.

FPVAV-3W1

EX.

FPVAV-3W2

EX. VAV-3W3

EX.

FPVAV-3W3

8x

EA

8x

EA

12x10 EA

8x8 EA x1

SA

x1

SA

8ø SA 6ø SA

8ø SA 6ø SA

8ø SA

8ø SA 8x

S A x1

SA

8ø SA 8ø SA

8ø SA

16x14 SA ø

SA

ø

SA

x1

SA

8ø S

A

8ø S

A

10x10 SA 8ø SA 8ø

S A 6ø

S A

6ø S

A

6ø S

A

6ø S

A 8ø

S A

6ø SA

6ø S

A x1

SA 6ø

S A

6ø SA

6ø SA

6ø S

A

8ø SA x1

SA

8ø S

A ø

SA

ø

SA

ø

SA

FROM BLW

TO ABV

20x20 EA

14x10 SA

10x8 SA

6ø S

A

6ø S

A

8ø SA

6ø SA

8ø S

A

6ø SA

6ø S

A

10ø SA

8ø S

A

14x10 SA

6ø S

A

6ø S

A

6ø S

A

6ø S

A

6ø S

A

6ø S

A

6ø S

A 6ø

S A

6ø S

A 6ø

S A

6ø S

A 6ø

S A

6ø S

A 6ø

S A 18 x1

SA

16x12 SA 12x10 SA

8ø S

A

8ø S

A

8ø S

A

14x10 SA

8x10 SA

8ø S

A 8ø

S A

8ø S

A

18x12 SA

14x10 SA

8ø S

A

8ø S

A

8ø S

A

8ø S

A

8ø S

A

8ø SA 10ø SA

10x12 SA

8ø S

A

8ø SA

8ø S

A x1

SA

ø

SA

x1

SA

6ø S

A

8ø SA

16x12 SA

6ø S

A

12ø SA ø

SA

6x

SA

6ø SA

6ø SA

14x15 SA

6ø S

A

6ø S

A

6ø S

A

10x10 SA 6ø

S A

6ø S

A

6x

SA

6ø SA

6ø SA

FROM BLW

TO ABV

80x30 SA

FROM ABV

TO BLW

80x30 RA

EX. AC-3W1

EX. CU-3W1

EX. RTU-02

C C

10ø SA

6ø S

A 6ø

S A

8ø SA10x8 SA 18x10 SA

12x8 SA

8ø SA

18x12 SA

EX. VAV-3W2

3 3

6 6

8x

EA

8Ø SDC-2

200 CFM

(TYP OF 6)

6Ø SDC-4

100 CFM

(TYP OF 9)

8Ø SDC-2

225 CFM

(TYP OF 4)

6Ø SDC-4

100 CFM

(TYP OF 16)

6Ø SDC-4

100 CFM

8Ø SDC-4

200 CFM

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"1 THIRD FLOOR - DEMOLITION

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\le ic he lb er ge r\A pp

D at a\ Lo ca l\A ut od es k\

R ev it_ Lo ca l\M

EP

-2

5-x0 1_

R

_L Ei ch el be rg er

BV

FX

Q

.rv t

1/

/2

2:

:5

PM

M103

THIRD FLOOR PLAN -

AREA A -

MECHANICAL -

DEMOLITION

01/30/26

JMW

MMR

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

KEYNOTES

Key

Value Keynote Text

1 EXISTING VAV BOX SHALL REMAIN

2 EXISTING FPVAV SHALL REMAIN

3 EXISTING VAV BOX SHALL BE REMOVED AND RELOCATED. REFER TO SHEET

M203 FOR RELOCATION.

4 EXISTING FPVAV BOX SHALL BE REMOVED AND RELOCATED. REFER TO SHEET

M203 FOR RELOCATION.

5 EXISTING VAV SHALL BE DEMOED

6 DEMO EXISTING RETURN GRILLE AND ASSOCIATED DUCTWORK

7 DEMO EXISTING TRANSFER DUCTWORK

8 EXISTING COMBINATION FIRE SMOKE DAMPERS SHALL REMAIN

9 EXISTING THERMOSTAT SHALL REMAIN

10 EXISTING THERMOSTAT SHALL BE REMOVED AND RELOCATED. REFER TO

SHEET M203 FOR RELOCATION.

11 DEMO EXISTING THERMOSTAT AND ASSOCIATED CONTROL WIRING, ETC.

12 RTU-02 THIRD FLOOR CENTRAL CONTROL CONSOL SHALL REMAIN

B

C

D

E

F

G

H

I

J

K

L

EXISTING FPVAV

SHALL REMAIN

EXISTING 320 CFM LINEAR SLOT

DIFFUSERS SHALL REMAIN (TYP OF 4)

56x34 RA

38x34 SA

30x16 RA

30x34 SA

FROM BLW

TO ABV

38x34 SA

FROM BLW

TO ABV

56x34 RA ø

SA

ø

SA

14ø SA

14ø SA

SHELL

MAKER SPACE

CLASSROOM

STORAGE

MEETING

MEETING

STUDY SPACE

MEETING

MEETING

LOBBY

STAIR

S03

RECEPTION

ELEVATOR

E1

E2

ELEVATOR

E3

MEETING

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"1 THIRD FLOOR - DEMOLITION

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\le ic he lb er ge r\A pp

D at a\ Lo ca l\A ut od es k\

R ev it_ Lo ca l\M

EP

-2

5-x0 1_

R

_L Ei ch el be rg er

BV

FX

Q

.rv t

1/

/2

2:

:5

PM

M104

THIRD FLOOR PLAN -

AREA B -

MECHANICAL -

DEMOLITION

01/30/26

JMW

MMR

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

KEYNOTES

Key

Value Keynote Text

1 EXISTING WALL RETURN TRANSFER GRILLE SHALL REMAIN (TYP)

2 DEMO AND REMOVE ENDCAP

3 EXISTING LINEAR SLOT DIFFUSER AND ASSOCIATED DUCTWORK SHALL BE

DEMOED

T

T

T

T

T T

TT

T

T

T

T

T

T

1 2 3 4 5 6

A

B

C

TESTING CENTER

TESTING CENTER

ACCOMMODATIONS

BREAKROOM

KITCHEN

OFFICE

IT CLOSET

MECH

E4

CUSTODIAL

MEN

WOMEN

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

EX. VAV-3W3

EX.

FPVAV-3W3

EX. VAV-3W2

EX.

FPVAV-3W2

EX. VAV-3W1

x2

SA

8Ø SDC-4

200 CFM

(TYP OF 2)

12Ø SDC-4

350 CFM

12Ø SDC-4

450 CFM

12Ø SDC-4

500 CFM

(TYP OF 2)

8Ø SDC-4

200 CFM

x2

R

A

FROM BLW

TO ABV

80x30 SA

FROM ABV

TO BLW

80x30 RA

EX.

FPVAV-3W4

EX. VAV-3W7

EX. VAV-3W5

x1

SA

24x16 SA x1

SA

ø

SA

6ø S

A

14x10 SA12ø SA

40x16 SA

16Ø SDC-4

750 CFM

(TYP OF 4)

VAV-3W9 VAV-3W10

12Ø SDC-4

500 CFM

(TYP OF 6)

EX.

FPVAV-3W1

8Ø SDC-2

300 CFM

(TYP OF 4)

24x14 SA

EX.

FPVAV-3W5

EX.

FPVAV-3W6

24x16 SA

20x20 EA

8x

EA

8x

EA

8x

EA

12x10 EA

8x8 EA

8x8 EGC

50 CFM

8Ø SDC-2

225 CFM

(TYP OF 2)

8Ø SDC-2

200 CFM

(TYP OF 3)

14x12 SA

20x14 SA 14x12 SA12 x8 S

A x8

S A x8

S A x1

SA

x1

SA

20x12 SA

12x8 SA 14x12 SA x8

S A

12ø SA x1

SA

x1

SA

x1

SA

EX. CU-3W1

EX. RTU-02

8ø SA

8ø SA

8ø SA

8ø SA ø

SA20

x1

SA

x1

SA

ø

SA

EX. AC-3W1

x2

R

A

56x18 RA

C C

12x6 SA

8ø SA

10ø SA

8x

SA

10x8 SA x8

S A x8

S A x8

S A x1

SA

24x16 SA x1

SA

x1

SA

x1

SA

40x16 SA x1

SA

14x10 SA 8x10 SA

8ø S

A

8ø S

A

8ø S

A

8ø S

A

8ø SA

8ø S

A 10x10 SA

6ø SA

6ø SA

6x

SA

6ø SA

6ø S

A

6ø S

A

6ø S

A

14x15 SA

6ø SA 6ø SA

6x

SA

6ø

S A

8ø S

A

8x

SA

6ø SA 16x12 SA

12ø SA

12x12 TA 12x12 RGC

8x8 RGC

8x8 TA

32x32 RGC

40x16 TA

32x32 RGC

40x16 TA

LOUNGE

COLLABORATION

8x6 SA

12x12 RGC

12x12 TA

EX. VAV-3W8

12x12 RGC

12x12 TA

8x

SA

EX. VAV-3W4

8ø S

A x8

S A ø

SA

12x12 RGC

450 CFM

12x12 RA

18x12 SA ø

SA

x1

SA

8ø S

A

8ø S

A ø

SA

8ø S

A

10x8 SA 8ø SA x8

S A x8

S A

10ø SA

6ø S

A 6ø

S A

6ø S

A

8ø SA10x8 SA6ø S

A 6ø

S A

18x10 SA14x10 SA

6ø S

A 6ø

S A

6ø S

A

6ø S

A

6ø S

A

6ø S

A

6ø S

A

6ø S

A

12x8 SA

6ø S

A 6ø

S A x1

SA

x1

SA

10x12 SA

8ø S

A

8ø S

A

10x12 SA ø

SA

8ø S

A

1 1 1 1 1

6ø SA

12ø SA

7 7

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"1 THIRD FLOOR - NEW WORK

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\le ic he lb er ge r\A pp

D at a\ Lo ca l\A ut od es k\

R ev it_ Lo ca l\M

EP

-2

5-x0 1_

R

_L Ei ch el be rg er

BV

FX

Q

.rv t

1/

/2

2:

:5

PM

M203

THIRD FLOOR PLAN -

AREA A -

MECHANICAL - NEW

WORK

01/30/26

JMW

MMR

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

KEYNOTES

Key

Value Keynote Text 1 10"x10" RGC WITH 10"x10" TA DUCT INTO PLENUM (TYP) 2 20"x20" RGC WITH 20"x20" TA DUCT INTO PLENUM (TYP) 3 64"x 20" RETURN AIR DUCT OPEN TO PLENUM. OPENING SHALL BE PROVIDED

WITH 1/2" GALVANIZED STEEL MESH SCREEN SET IN REMOVABLE FRAME.

REFER TO OPEN END DUCT INLET DETAIL FOR INSTALLATION REQUIREMENTS.

4 66"x 18" RETURN AIR DUCT OPEN TO PLENUM. OPENING SHALL BE PROVIDED

WITH 1/2" GALVANIZED STEEL MESH SCREEN SET IN REMOVABLE FRAME.

REFER TO OPEN END DUCT INLET DETAIL FOR INSTALLATION REQUIREMENTS.

5 RELOCATED EXISTING THERMOSTAT. CONFIGURE RELOCATED EXISTING

THERMOSTAT TO CONTROL ASSOCIATED MECHANICAL EQUIPMENT (TYP).

6 NEW THERMOSTAT

7 NEW VAV BOX

8 RELOCATED AND RECONFIGURED VAV BOX

9 RELOCATED AND RECONFIGURED FPVAV BOX

10 RE-BALANCE EXISTING EXHAUST FAN TO ACCOMODATE ADDITIONAL

RESTROOM EXHAUST AIRFLOW.

11 RE-BALANCE EXISTING RTU-02 OUTSIDE AIR TO 6,000 CFM.

B

C

D

E

F

G

H

I

J

K

L

SHELL

STORAGE

MEETING

364 MEETING

STAIR

S03

RECEPTION

ELEVATOR

E3

E2

ELEVATOR

E1

MEETING

CLASSROOM

MAKER SPACE

MEETING

STORAGE

MEETING

STUDY SPACE

MEETING

304MEETING

LOBBY

56x34 RA

38x34 SA

30x16 RA

30x25 SA ø

SA

ø

SA

EXISTING FPVAV

SHALL REMAIN

14ø SA

14ø SA

EXISTING 320 CFM

LINEAR SLOT

DIFFUSERS (TYP OF 4)

14ø SA

FROM BLW

TO ABV

38x34 SA

FROM BLW

TO ABV

56x34 RA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"1 THIRD FLOOR - NEW WORK

Sheet Title:

Project Number:

Drawn By:

Checked By:

Date:

Drawing Number

Project Identification:

Seal:

Consultants:

B

ISSUES

1 3 4 5

C

D

A

COA #: C00773-00 - Expires: 12/31/2025

H.F. Lenz Co.

1407 Scalp Avenue Johnstown, PA 15904 814-269-9300 hflenz.com

Key Plan:

DOCUMENT EXCLUSIVE PROPERTY OF H.F. LENZ CO., UNAUTHORIZED USE IS NOT PERMITTED

C :\U se rs

\le ic he lb er ge r\A pp

D at a\ Lo ca l\A ut od es k\

R ev it_ Lo ca l\M

EP

-2

5-x0 1_

R

_L Ei ch el be rg er

BV

FX

Q

.rv t

1/

/2

2:

:0

PM

M204

THIRD FLOOR PLAN -

AREA B -

MECHANICAL - NEW

WORK

01/30/26

JMW

MMR

2025-1782.01

WVU EVANSDALE

CROSSING THIRD &

FOURTH FLOOR

RENOVATIONS

62 MORRILL WAY,

MORGANTOWN, WEST VIRGINIA

26505

WEST VIRGINIA

UNIVERSITY

KEYNOTES

Key

Value Keynote Text

1 EXISTING WALL RETURN TRANSFER GRILLE SHALL BE CLEANED (TYP)

2 INSTALL NEW LINEAR SLOT DIFFUSER TO NEW 14Ø SUPPLY DUCTWORK.

BALANCE TO 320 CFM.

SYMBOL LOCATION

BOX DIMENSIONS

H (IN)L (IN)MAXMIN

CFM

W (IN)

DUCT

INLET

(IN) W x H (IN)

OUTLET DUCT

SIZE

ELECTRIC HEATING COIL

CFM °F °F

EAT LAT MCA

SP LOSS

MAX

(IN)

BASIS OF DESIGN

MOPKW VOLTS/Ph.ROOM

SERVES

VAV-3W9 TESTING CENTER - 320 30001650 24 1839.5320 16 24x18 1650 55 81.8 21.0 0.25 TITUS DESV2514 480/3

VARIABLE VOLUME BOX WITH ELECTRIC HEATING COIL SCHEDULE

VAV-3W10 TITUS DESV

ELECTRICAL

30001650 24 1839.5 16 24x18 1650 55 81.8 21.0 0.252514 480/3TESTING CENTER - 320 320

1.

2.

3.

4.

NOTES:

SELECTIONS ARE BASED ON TITUS AS MANUFACTURER.

ALL PERFORMACE BASED ON TESTS CONDUCTED IN ACCORDANCE WITH ASHRAE 130-2008 AND AHRI 880-2011.

ALL NC LEVELS DETERMINED USING AHRI 885-2008 APPENDIX E.

ALL AIRFLOW, PRESSURE LOSSES AND HEATING PERFORMANCE VALUES HAVE BEEN CORRECTED FOR ALTITUDE.

AIR FLOWAIR FLOW

AIR FLOWAIR FLOW

SIDE VIEW

TOP VIEW

SECTION VIEW

SPIRAL SEAM

DOUBLE WALL

DUCTWORK

30 DEGREE

ANGULAR

POSITION OF GRILLE

ON DUCTWORK

COMBINATION VOLUME

DAMPER / EXTRACTOR

DIRECT SPIRAL DUCT-MOUNTED

SUPPLY GRILLE WITH CURVED

BORDER

SUPPLY AIR DUCT

DUCT SIZE AS

INDICATED ON

FLOOR PLANS, TYP.

ADJUSTABLE DOUBLE

DEFLECTION BARS, TYP

NOTES:

1. ADJUST REAR VERTICAL BARS TO PRODUCE EVEN AIRFLOW ACROSS FACE OF GRILLE AND

IN THE DESIRED HORIZONTAL SPREAD. ADJUST FRONT HORIZONTAL BARS TO PRODUCE THE

DESIRED VERTICAL SPREAD AND DIRECTION.

2. PAINT ALL EXPOSED SHEET METAL DUCTWORK, PLENUMS AND HANGERS / SUPPORTS.

THE COLOR SHALL MATCH EXISTING.

3. NO FLEXIBLE DUCT IS PERMITTED.

4. EXPOSED EXHAUST AND RETURN DUCTS SHALL BE SIMILAR EXCEPT THAT THE GRILLE

SHALL CONTAIN AN OPPOSED BLADE DAMPER, AND SHALL BE SINGLE DEFLECTION WITH

FIXED BARS. THE DUCT MAY BE SINGLE WALL, UN-INSULATED.

FC FC

ELECTRIC HEATING COIL. SEE

SCHEDULE FOR CAPACITIES.

BRANCH PIPING CONNECTING TO

COIL SHALL BE AS SCHEDULED.

TRANSITION

CLEARANCE PER

REQUIREMENTS

OF NEC

CONTROL PANEL

AND FAN MOTOR

STARTER

INDUCED AIR

INLET WITH

FILTER

AIR FLOW DIRECTION

45 DEG. TAP-IN FOR

RECTANGULAR DUCT OR

ROUND CONICAL TAP

WHERE DUCT SIZE PERMITS.

SUPPLY DUCT SIZE AS

NOTED ON FLOOR PLANS

MIN 1.5 DIAMETERS LENGTH

OF INLET DUCT OR AS

RECOMMENDED BY MFGR,

SIZE OF INLET DUCT SHALL

MATCH UNIT INLET SIZE.

SUPPLY DUCT.

SIZE AS NOTED ON

FLOOR PLANS.

FPB

SPRING VIBRATION ISOLATOR WITH

MIN. 1" STATIC DEFLECTION ON EACH

ROD. (MAY BE OMITTED WITH

APPROVAL IF THE FAN IS INTERNALLY

ISO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .