EXHIBIT E SURETY FORM.docx

DOCX document 31 KB Posted

Attached to
Z2DA--INSTALL AUTO SHOWER OPERATORS Federal contract opportunity
Solicitation number
36C25620R0148
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document contains a surety form and information on a related federal contract opportunity for installation services. The surety form requires contact and financial information from the contractor's surety to be submitted as part of the technical proposal. The federal contract opportunity is a solicitation to install auto shower operators at the Southeast Louisiana Veterans Health Care System facility. Key details include a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses, a project cost estimate between $500,000 to $1 million, a site visit date in August 2020, a proposal due date in early October 2020, and an anticipated 180-day performance period following notice to proceed. The work location and requirement to provide all labor and materials to complete the scope of work are also noted.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--INSTALL AUTO SHOWER OPERATORS, newest first.
File Type Posted
36C25620R0148 0002.docx DOCX document
36C25620R0148 0001.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
FINAL SOW - Install Auto Operators Showers and Faucets.pdf PDF
GENERAL DECISION NO. LA20200041 01.24.2020.pdf PDF
Section 26 05 26 Grounding and Bonding for Electrical Systems.pdf PDF
Section 22 40 00 Plumbing Fixtures.pdf PDF
Stamped Drawings - NOLA Auto Operators - 20200604.pdf PDF
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
Section 26 05 19 Low-Voltage Electrical Power Conductors and Cables.pdf PDF
Section 26 05 11 Requirements for Electrical Installations.pdf PDF
Section 22 08 00 Commissioning of Plumbing Systems.pdf PDF
Section 01 35 26 Safety Requirements.pdf PDF
Section 01 33 23 Shop Drawings Product Data and Samples.pdf PDF
36C25620R0148 RFP.docx DOCX document
Section 22 05 11 Common Work Results for Plumbing.pdf PDF
Section 01 32 16-15 Project Schedules.pdf PDF
Section 00 01 15 List of Drawing Sheets.pdf PDF
Attachment 1- FAR 52.236.27 Site Visit Instructions.docx DOCX document
Section 26 27 26 Wiring Devices.pdf PDF
Section 26 05 33 Raceway and Boxes for Electrical Systems.pdf PDF
Section 22 07 11 Plumbing Insulation.pdf PDF
Section 22 05 23 General-Duty Valves for Plumbing Piping.pdf PDF
Section 09 91 00 Painting.pdf PDF
Section 09 30 13 Ceramic-Porcelain Tiling.pdf PDF
Section 09 29 00 Gypsum Board.pdf PDF
Section 01 74 19 Construction Waste Management.pdf PDF
Section 01 45 00 Quality Control.pdf PDF
Section 00 01 10 Table of Contents.pdf PDF
Section 01 00 00 General Requirements.pdf PDF
Section 01 42 19 Reference Standards.pdf PDF
ICRA ILSM NEPA FY 20 (002).xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 629-18-140 Install Auto-Operated Faucets 36C25620R0148

EXHIBIT E

SURETY FORM

OFFEROR INSTRUCTIONS: To be completed by Surety and SUBMITTED BY OFFEROR AS A PART OF THE TECHNICAL PROPOSAL PACKAGE.

Contractor Name:

Address:

Telephone: Email:

Please complete below and return no later than:

Surety Name:

Surety Address:

POC:Title:
Telephone:Email:

How long have you provided bonding for the above contractor? YEARS What is the contractor’s rating?

Bonding Limit for a single project?$
Aggregate amount?$

Have you ever had to complete a project for the contractor? [ ] YES [ ] NO Has liability insurance ever been refused? [ ] YES [ ] NO Have there been complaints of non-payment by subcontractor/suppliers? [ ] YES [ ] NO Has the surety had to pay subcontractors/suppliers? [ ] YES [ ] NO

File details come from the government source that posted it. Updated .