Section 01 45 00 Quality Control.pdf
PDF 113 KB Posted
- Attached to
- Z2DA--INSTALL AUTO SHOWER OPERATORS Federal contract opportunity
- Solicitation number
- 36C25620R0148
About this file
This document includes a specification section and a related federal contract opportunity notice.
The specification section provides requirements for quality control on a construction project to install automatic shower and faucet operators at the Southeast Louisiana Veterans Healthcare System in New Orleans. It outlines procedures for contractor quality control plans, coordination meetings, quality control organizations, control phases, documentation and completion inspections. The project number is 629-18-140 and work must comply with FAR Clause 52.246-12 for inspection of construction.
The related federal contract opportunity is a solicitation to obtain these shower and faucet operator installation services. It is a 100% set-aside for service-disabled veteran-owned small businesses. The solicitation number is 36C25620R0148 and will be issued on or around August 31, 2020 with proposals due on or around October 2, 2020. The contract award date is anticipated within 30 days thereafter. The performance period is 180 days from notice to proceed. The location is the Southeast Louisiana Veterans Healthcare System and the NAICS code is 238220. The construction cost is estimated between $500,000 to $1 million.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALL AUTO OPERATORS
FOR SHOWERS & FAUCETS
Southeast Louisiana Veteran’s Healthcare System – New Orleans, LA Project #: 629-18-140
4th June 2020 01 45 00 - 01 100% CD Submittal Quality Control
SECTION 01 45 00
QUALITY CONTROL
PART 1 - GENERAL
1.1 DESCRIPTION:
This section specifies requirements for Contractor Quality Control
(CQC) for Design-Bid-Build (DBB) construction projects.
1.2 APPLICABLE PUBLICATIONS:
A. The publication listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
B. ASTM International (ASTM)
1. D3740 - (2012a) Minimum Requirements for Agencies Engaged in the
Testing and/or Inspection of Soil and Rock as Used in Engineering
Design and Construction
2. E329 - (2014a) Standard Specification for Agencies Engaged in the
Testing and/or Inspection of Materials Used in Construction
1.3 SUBMITTALS:
Government approval is required for all submittals. CQC inspection reports shall be submitted under this Specification section and follow the applicable specification section naming convention.
1. Preconstruction Submittals
a. Interim CQC Plan
b. CQC Plan
2. Test Reports
a. Verification Statement
PART 2 PRODUCTS – NOT USED
PART 3 – EXECUTION
3.1 GENERAL REQUIREMENTS:
Establish and maintain an effective quality control (QC) system that complies with the FAR Clause 52.246.12 titled “Inspection of
Construction”. QC consists of plans, procedures, and organization necessary to produce a final product which complies with the Contract requirements. The QC system covers all design and construction operations, both onsite and offsite, and be keyed to the proposed design and construction sequence. The project superintendent will be
4th June 2020 01 45 00 - 02 held responsible for the quality of work and is subject to removal by the Contracting Office or the Contracting Officer Representative (COR) for non-compliance with the quality requirements specified in the
Contract. In this context the highest-level manager responsible for the overall construction activities at the site, including quality and production is the project superintendent. The project superintendent shall maintain a physical presence at the site at all times and is responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.
3.2 CQC PLAN:
A. QCQ Plan submittal date to be determined by COR after awarded bid. CQC
Plan proposed to implement the requirements of the FAR Clause 52.246.12 titled “Inspection of Construction”. The Government will consider an
Interim CQC Plan for the first days of operation, which must be accepted within 10 business days of NTP. Design and/or construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an Interim plan applicable to the feature of work to be started. Work outside of the accepted Interim CQC Plan will not be permitted to begin until acceptance of a CQC Plan or another Interim
CQC Plan containing the additional work scope is accepted.
B. Content of the CQC Plan: Include, as a minimum, the following to cover all design and construction operations, both onsite and offsite, including work by subcontractors, designers of record consultants, architects/engineers (A/E), fabricators, suppliers, and purchasing agents:
1. A description of the QC organization, including a chart showing lines of authority and acknowledgement that the CQC staff will implement the three-phase control system for all aspects of the work specified. Include a CQC System Manager that reports to the project superintendent.
2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC function.
3. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates enough authorities to adequately perform the functions
4th June 2020 01 45 00 - 03 of the CQC System Manager, including authority to stop work which is not in compliance with the Contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities will to the Contracting Officer or
COR. be issued by the CQC System Manager. Furnish copies of these letters.
4. Procedures for scheduling, reviewing, certifying, and managing submittals including those of subcontractors, designers of record, consultants, A/E’s offsite fabricators, suppliers and purchasing agents. These procedures must be in accordance with Section 01 33 23
Shop Drawings, Product Data, and Samples.
5. Control, verification, and acceptance of testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities approved by the Contracting Officer or COR are required to be used)
6. Procedures for tracking Preparatory, Initial, and Follow-Up control phases and control, verification, and acceptance tests including documentation.
7. Procedures for tracking design and construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.
8. Reporting procedures, including proposed reporting formats.
9. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks has separate control requirements, and is identified by different trades or disciplines, or it is work by the same trade in a different environment. Although each section of specifications can generally be considered as a definable feature of work, there are frequently more than one definable feature under a section. This list will be agreed upon during the Coordination meeting.
C. Acceptance of Plan: Acceptance of the Contractor’s plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the design and construction. The Government reserves the right to require the
4th June 2020 01 45 00 - 04
Contractor to make changes in the CQC Plan and operations including removal of personnel as necessary, to obtain the quality specified.
D. Notification of Changes: After acceptance of the CQC Plan, notify the
Contracting Officer or COR in writing of any proposed change. Proposed changes are subject to acceptance by the Government prior to implementation by the Contractor.
3.3 COORDINATION MEETING:
A. After the Preconstruction Conference Post-Award Conference before start of design or construction, and prior to acceptance by the Government of the CQC Plan, meet with the Contracting Officer or COR to discuss the
Contractor’s quality control system. Submit the CQC Plan a minimum of 5 business days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details must be developed, including the forms for recording the CC operations, design activities (if applicable), control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of
Contractor’s Management and control with the Government’s Quality
Assurance. Minutes of the meeting will be prepared by the Government, signed by both the Contractor and Contracting Officer or COR and will become a part of the contract file. There can be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings or address deficiencies in the CQC system or procedures which can require corrective action by the Contractor.
3.4 QUALITY CONTROL ORGANIZATION:
A. Personnel Requirements: The requirements for the CQC organization are a
Safety and Health Manager, CQC System Manager, a Design Quality Manager
(if applicable, verify with COR), and a sufficient number of additional qualified personnel to ensure safety and Contract compliance. One person may fill all these roles if project is deemed small enough by
COR to not require multiple members, verify prior to proceeding. The
Safety and Health Manager shall satisfy the requirements of
Specification 01 35 26 Safety Requirements and report directly to a senior project (or corporate) official independent from the CQC System
Manager. The Safety and Health Manager will also serve as a member of the CQC Staff. Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being
4th June 2020 01 45 00 - 05 performed properly will also be included as part of the CQC organization. The Contractor’s CQC staff shall maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure
Contract compliance. The CQC staff will be subject to acceptance by the
Contracting Officer or COR. Provide adequate office space, filing systems, and other resources as necessary to maintain an effective and fully functional CQC organization. Promptly complete and furnish all letters, material submittals, shop drawings submittals, schedules and all other project documentation to the CQC organization. The CQC organization is responsible for maintaining these documents and records at the site at all times, except as otherwise acceptable to the
Government.
B. CQC System Manager: Identify as CQC System Manager an individual within the onsite work organization that is responsible for overall management of CQC and has the authority to act in all CQC matters for the
Contractor. The CQC system Manager is required to have 1 year of construction experience on construction similar to the scope of this
Contract. This CQC System manager shall be on the site at all times during construction and is employed by the General Contractor. The CQC
System Manger is assigned as CQC System Manager but has duties as project superintendent in addition to quality control.
C. CQC Personnel: In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist in the CQC System Manager for the following areas, as applicable: electrical, mechanical, civil, structural, environmental, architectural, materials technician submittals clerk, Commissioning
Agent/LEED specialist, and low voltage systems. These individuals or specified technical companies shall be employees of the prime or subcontractor; be responsible to the CQC System Manager; be physically present at the construction site during work on the specialized personnel’s areas of responsibility; have the necessary education or experience in accordance with the Experience Matrix listed herein.
These individuals can perform other duties but need to be allowed sufficient time to perform the specialized personnel’s assigned quality controls duties as described in the CQC Plan. A single person can cover
4th June 2020 01 45 00 - 06 more than one area provided that the single person is qualified to perform QC activities in each designated discipline and that workload allows.
EXPERIENCE MATRIX
Area Qualifications
Civil
Graduate Civil Engineer or Construction Manager with 2 years of experience in the type of work being performed on this project or technician with 5 years related experience.
Mechanical
Graduate Mechanical Engineer with 2 years of experience or construction professional with 5 years of experience supervising mechanical features of work in the field with a construction company.
Electrical
Graduate Electrical Engineer with 2 years related experience or construction professional with 5 years of experience supervising electrical features of work in the field with a construction company.
Structural
Graduate Civil Engineer (with Structural Track or Focus), Structural Engineer, or Construction Manager with 2 years of experience or construction professional with 5 years of experience supervising structural features of work in the field with a construction company.
Architectural Graduate Architect with 2 years of experience or construction professional with 5 years of related experience.
Environmental Graduate Environmental Engineer with 3 years or experience.
Submittals Submittal Clerk with 1 year of experience.
Concrete, Pavement, and Soils Materials Technician with 2 years of experience for the appropriate area.
Testing, Adjusting, and Balancing (TAB) Specialist must be a member of AABC or an experienced technician of the firm certified by the NEBB.
Design Quality Control Manager Registered Architect or Professional Engineer
4th June 2020 01 45 00 - 07
D. Additional Requirements: Verify necessity of the following additional requirement with project COR. In addition to the above experience and education requirements, the CQC System Manager and Alternate CQC System
Manager are required to have completed the Construction Quality
Management (CQM) for Construction course. If the CQC System Manager does not have a current specification, obtain the CQM for Contractors course identification within 90 days of award. This course is periodically offered by the Naval Facilities Engineering Command and the Army Corps of Engineers. Contact the Contracting Officer or COR for information on the next scheduled class.
E. Organizational Changes: Maintain the CQC staff at all times. When it is necessary to make changes to the CQC staff, revise the CQC Plan to reflect the changes and submit the changes to the Contracting Officer or COR for acceptance.
3.5 SUBMITTALS AND DELIVERABLES:
A. Submittals must comply with the requirements in Section 01 33 23 Shop
Drawings, Product Data, and Samples. The CQC organization is responsible for certifying that all submittals and deliverables comply with the contract requirements.
3.6 CONTROL:
A. CQC is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control are required to be conducted by the CQC System Manager for each definable feature of the construction work as follows:
1. Preparatory Phase: This phase is performed prior to beginning work on each definable feature of work after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:
a. A review of each paragraph of applicable specifications, references codes, and standards. Make available, during the preparatory inspection, a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field. Maintain and make available in the
4th June 2020 01 45 00 - 08 field for use by Government personnel until final acceptance of the work.
b. Review of the Contract drawings.
c. Check to assure that all materials and equipment have been tested, submitted, and approved.
d. Review of provisions that have been made to provide required control inspection and testing.
e. Examination of the work area to assure that all required preliminary work has been completed and complies with the
Contract.
f. Examination of required materials, equipment, and sample work to assure that they are on hand conform to approved shop drawings or submitted data and are properly stored.
g. Review of the appropriate Activity Hazard Analysis (AHA) to assure safety requirements are met.
i. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards – contract defined or industry standard if not contract defined - for that feature of work.
j. Check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.
k. Discussion of the initial control phase.
l. The Government needs to be notified at least 48 hours or 2 business days in advance of beginning the Preparatory control phase. Include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. Document the results of the Preparatory phase actions by separate minutes prepared by the CQC System Manager and attach to the daily CQC report. Instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.
2. Initial Phase: This phase is accomplished at the beginning of a definable feature of work. Accomplish the following:
4th June 2020 01 45 00 - 09
a. Check work to ensure that it is in full compliance with contract requirements. Review minutes of the Preparatory meeting.
b. Verify adequacy of controls to ensure full contract compliance.
Verify the required control inspection and testing complies with the contract.
c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.
d. Resolve all differences.
e. Check safety to include compliance with an upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.
f. The Government needs to be notified at least 48 hours or 2 business days in advance of beginning the initial phase for definable features of work. Prepare separate minutes of this phase by the CQC System Manager and attach to the daily CQC report. Indicate the exact location of initial phase for definable feature of work for future reference and comparison with Follow-Up phases.
g. The initial phase for each definable feature of work is repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.
3. Follow-Up Phase: Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements until the completion of each particular feature of work. Record the checks in the CQC documentation. Conduct final Follow-Up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work.
B. Additional Preparatory and Initial Phases on the same definable features of work if: the quality ongoing work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity, or if other problems develop.
4th June 2020 01 45 00 - 10
3.7 COMPLETION INSPECTION:
A. Punch-Out Inspection: Conduct an inspection of the work by the CQC system Manager near the end of the work, or any increment of the work established by a time stated FAR 52.211-10 – Commencement, Prosecution, and Completion of Work, or by the specifications. Prepare and include in the CQC documentation, a punch list of items which do not conform to the approved drawings and specifications. Include within the list of deficiencies the estimated date by which the deficiencies will be corrected. Make a second inspection the CQC System Manager or staff to ascertain that all deficiencies have been corrected. Once this is accomplished, notify the Government that the facility is ready for the
Government Pre-Final Inspection.
B. Pre-Final Inspection: The Government will perform the Pre-Final
Inspection to verify that the facility is complete and ready to be occupied. A Government Pre-Final Punch List may be developed as a result of this inspection. Ensure that all items on this list have been corrected before notifying the Government, so that a Final Acceptance
Inspection with the customer can be scheduled. Correct any items noted on the Pre-Final Inspection in a timely manner. These inspections and any deficiency corrections required by this paragraph need to be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate construction completion dates.
C. Final Acceptance Inspection: The Contractor’s QC Inspection personnel, plus the superintendent or other primary management person, and the
Contracting Officer’s COR is required to attend the Final Acceptance
Inspection. Additional Government personnel can also be in attendance.
The Final Acceptance Inspection will be formally scheduled by the
Contracting Officer’s or COR based upon results of the Pre-Final
Inspection. Notify the Contracting Officer through the COR at least 14 days prior to the Final Acceptance Inspection and include the
Contractor’s assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date schedule for the Final Acceptance Inspection. Failure of the
Contractor to have all contract work acceptably complete for this
4th June 2020 01 45 00 - 11 inspection will be cause for the Contracting Officer to bill the
Contractor for the Government’s additional inspection cost in accordance with FAR Clause 52.246-12 titled “Inspection of
Construction”.
3.8 DOCUMENTATION:
A. Quality Control Activities: Maintain current records providing factual evidence that required QC activities and tests have been performed.
Include in these records the work of subcontractors and suppliers on an acceptable form that includes, as a minimum, the following information:
1. The name and area of responsibility of the Contractor/Subcontractor
2. Operating plant/equipment with hours worked, idle, or down for repair.
3. Work performed each day, giving location, description, and by whom.
When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.
4. Test and control activities performed with results and references to specification/drawing requirements. Identify the Control Phase
(Preparatory, Initial, and/or Follow-Up). List deficiencies noted, along with corrective action.
5. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specification/drawing requirements.
6. Submittals and deliverables reviewed, with Contract reference, by whom, and action taken.
7. Offsite surveillance activities, including actions taken.
8. Job safety evaluations stating what was checked, results, and instructions or corrective actions.
9. Instructions given/received and conflicts in plans and specifications.
10. Provide documentation of design quality control activities. For independent design reviews, provide, as a minimum, identification of the Independent Technical Reviewer (ITR) team, the ITR review comments, responses, and the record of resolution of the comments.
B. Verification Statement: Indicate a description of trades working on the project; the number of personnel working; weather conditions encountered; and any delays encountered. Cover both conforming and
4th June 2020 01 45 00 - 12 deficient features and include a statement that equipment and materials incorporated in the work and workmanship comply with the Contract.
Furnish the original and one copy of these records in report form to the Government daily with 1 week after the date covered by the report, except that reports need not be submitted for days on which no work is performed. As a minimum, prepare and submit on report for every 7 days of no work and on the last day of a no work period. All calendar days need to be accounted for throughout the life of the contract. The first report following a day of no work will be for that day only. Reports need to be signed and dated by the CQC System Manager. Include copies of test reports and copies of reports prepared by all subordinate QC personnel within the CQC System Manager Report.
3.9 NOTIFICATION OF NONCOMPLIANCE:
The Contracting Officer or COR will notify the Contractor of any detected noncompliance with the foregoing requirements. The Contractor should take immediate corrective action after receipt of such notice.
Such notice, when delivered to the Contractor at the work site will be deemed enough for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer can issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders will be made the subject of claim for extension of time or for excess costs or damages by the Contractor.
- - - End - - -
File details come from the government source that posted it. Updated .