This document includes an amendment to a solicitation and related questions and answers. The amendment provides additional project details and COVID-19 safety procedures for a project to install automatic shower operators at the Southeast Louisiana Veterans Health Care System facilities.

Specifically, the project involves installing automatic shower operators in 197 rooms across multiple buildings. The solicitation is set aside for service-disabled veteran-owned small businesses and has an estimated value between $500,000 to $1 million. Interested offerors must meet SDVOSB and small business size standards. The response deadline is 30 days from issuance with anticipated award 30 days later. The performance period is 180 days. Additional COVID-19 safety protocols are outlined, including initial and biweekly testing for contractors working in specified buildings housing COVID-19 patients.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--INSTALL AUTO SHOWER OPERATORS, newest first.
File Type Posted
36C25620R0148 0001.docx DOCX document
Section 26 27 26 Wiring Devices.pdf PDF
Section 26 05 33 Raceway and Boxes for Electrical Systems.pdf PDF
Section 22 07 11 Plumbing Insulation.pdf PDF
Section 22 05 23 General-Duty Valves for Plumbing Piping.pdf PDF
Section 09 91 00 Painting.pdf PDF
Section 09 30 13 Ceramic-Porcelain Tiling.pdf PDF
Section 09 29 00 Gypsum Board.pdf PDF
Section 01 74 19 Construction Waste Management.pdf PDF
Section 01 45 00 Quality Control.pdf PDF
Section 00 01 10 Table of Contents.pdf PDF
Section 01 00 00 General Requirements.pdf PDF
Section 01 42 19 Reference Standards.pdf PDF
ICRA ILSM NEPA FY 20 (002).xlsx XLSX spreadsheet
Section 22 05 11 Common Work Results for Plumbing.pdf PDF
Section 01 32 16-15 Project Schedules.pdf PDF
Section 00 01 15 List of Drawing Sheets.pdf PDF
Attachment 1- FAR 52.236.27 Site Visit Instructions.docx DOCX document
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
EXHIBIT E SURETY FORM.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
Section 26 05 19 Low-Voltage Electrical Power Conductors and Cables.pdf PDF
Section 26 05 11 Requirements for Electrical Installations.pdf PDF
Section 22 08 00 Commissioning of Plumbing Systems.pdf PDF
Section 01 35 26 Safety Requirements.pdf PDF
Section 01 33 23 Shop Drawings Product Data and Samples.pdf PDF
36C25620R0148 RFP.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
FINAL SOW - Install Auto Operators Showers and Faucets.pdf PDF
GENERAL DECISION NO. LA20200041 01.24.2020.pdf PDF
Section 26 05 26 Grounding and Bonding for Electrical Systems.pdf PDF
Section 22 40 00 Plumbing Fixtures.pdf PDF
Stamped Drawings - NOLA Auto Operators - 20200604.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25620R0148 0002

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-24-2021

NA

629-18-140 00502

ALEXANDRIA VA HEALTH CARE SYSTEM

NETWORK CONTRACTING OFFICE 16

ALEXANDRIA VA HEALTH CARE SYSTEM

PO BOX 69004

ALEXANDRIA

LA

71306-9004 00502

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 16

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HIGHWAY

PINEVILLE

LA

71360-4004 To all Offerors/Bidders

36C25620R0148 02-01-2021

X X X

NA

X The purpose of this amendment is to provide Solicitation RFI's and an additional paragraph to the SOW.

1) Please see next page.

All other terms and conditions remain unchanged.

William A. Geary Contracting Officer-NCO 16

Questions
Answers
1) Please provide make and model number(s) of the existing ligature faucets in the Mental Health Ward. This will assist in estimating the modifications that will be needed, if any, to the top of the counter to fit the new faucet.
https://www.bradleycorp.com/product/ligature-resistant-lavatory
2) Please provide existing paint manufacturer, sheen, and color of walls for each room section.
Inpatient & TL by the handwashing sinks/ PROVIDER AREA:

Sherwin Williams OC-17 White Dove Interior Promar 200 zero VOC LATEX EGGSGELL Finish

5D sink wall:

Sherwin Williams high gloss Water base Epoxy Pro Industrial Interior /Exterior AF-100 Pashmina. The adjacent wall to the sink is the Sherwin Williams Interior/ Exterior water base high gloss Epoxy Pro Industrial OC-17 White Dove.

3) Please provide existing tile manufacturer, sheen, and color for each room section.
Shower tile for TL & Inpatient:

Dal Tile Color Wheel Linear - 4” x 12” Artic White Matte

4) Please advise area/specific location where Contractor can place dumpster and conex for material storage.
For all locations: Inpatient either 2nd or 3rd Floor B-side Service Bay
5) How many rooms will we be allowed/opened to the contractor to be renovated at one time?
Refer to Section 7 in the SOW
6) With over 377 sinks in 197 different rooms, 180 days for completion seems to be an unattainable goal. Is there any liquidated damages if the work takes longer than 180 days?
Liquidated damages are not associated with this action. The period of performance is mandatory and remains unchanged.
7) Will we be required to fully finish each room before moving on to the next room? Including demo, new electrical, new sink faucet, patch and paint drywall, replace wall tile.
Yes. In the event that the hospital is experiencing a high patient census, the room will need to be complete, cleaned IAW provided ICRA requirements, and inspected by Engineering staff (and other VA Officials) in order for a patient to be moved into that completed room and opening up another room to be worked on.
8) Can the contractor replace damaged and removed tile with a close match since most likely the exact tiles are no longer produced?
If the contractor can prove that the exact tile is no longer produced, we will consider an alternate tile after approval from our Interior Design team.
9) What special requirements will we have to follow when doing work in the mental health ward?
· All locked doors must remain closed and locked.

· Be mindful when coming in the door to the unit. The door should be closed quickly and not held open.

· Notify nursing if someone wants to open a door.

· Only clinical unit staff may allow people in or out of the unit.

· If you are working a room, ensure the door is locked while you are in the room and if you leave the room.

· Working outside of the rooms in the common area is at least a two person job: One person doing the job and the other watching the tools and equipment for safety.

· Never leave tools, equipment, gloves, plastic bags, cords etc. unattended.

· Always keep any keys in your possession.

· Clean up all tools, nails, screws, washers, bolts and other remnants of your job before you leave.

· Please do not exchange money, goods, or food with patients.

· Do not engage patients in conversation. Refer them to staff on the unit.

· All information is confidential, even the fact that someone is on the psychiatric unit. If you see someone you know, you cannot talk about this after you leave the unit.

· Add Special Paragraph below to the original Scope of Work.

1. COVID PROCEDURES

0. Transitional Living Building

0. The contractor shall present an initial negative COVID PCR (Polymerase Chain Reaction) test to VA Employee Health, not older than 4 days, prior to starting work in this building.

0. The COVID PCR test must be taken at a facility/organization that is authorized to administer the test.

0. The contractor will be required to be COVID PCR tested twice weekly while working in this building

2. The first test is to be administered Monday thru Wednesday

2. The second test is to be administered Thursday thru Saturday.

0. The contractor will provide the results of the COVID PCR tests to VA Employee Health upon the return of the test results.

0. If a COVID test comes back with a positive reading for COVID, the contractor must immediately notify VA Employee Health and exit the Transitional Living Building.

0. The contractor may return to this building after VA Employee Health has determined it is appropriate.

0. Inpatient Wards 2C and 3C – these two units house our COVID positive patients

1. The contractor must dress out in the following personal protective equipment (PPE) before entering either Ward:

0. Face shield and/or eye goggles