Exhibit C Upright Headstone Realignment Diagrams.pdf

PDF 187 KB Posted

Attached to
Camp Butler National Cemetery – National Shrine Project 806-NSP25-004
Solicitation number
36C78626B0008
Issued by

About this file

This document is an exhibit containing technical diagrams for upright headstone realignment procedures in burial sections.

Figure 2 presents a plan view showing the realignment methodology for a burial section. The diagram illustrates the use of keystones as reference points, with an initial keystone establishing the baseline alignment grid. String lines are used to align both transverse and row directions, with equal spacing (EQ.) maintained between headstones. The diagram indicates that subsequent keystones are set onto the realignment grid after the initial keystone is established. Intermediate headstones are positioned after keystones are set, with rows maintained parallel to each other and columns aligned parallel to their respective reference lines. In sloping terrain, additional keystones may be required to provide smooth transitions.

Figure 3 provides elevation views depicting typical vertical alignment in both flat and sloped sections. The flat section diagram shows headstone positioning relative to existing undisturbed top soil surface and mean or average top soil surface reference lines, with realigned headstones positioned on a solid line and original headstone locations indicated by dashed lines. The sloped section diagram demonstrates projected vertical alignment relative to average top soil level using an imaginary string line, with similar notation for realigned versus original headstone positions. Both elevation views illustrate the vertical positioning methodology necessary to maintain proper alignment across varying terrain conditions while preserving the integrity of burial sections.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT ‘C’

UPRIGHT HEADSTONE REALIGNMENT DIAGRAMS

cemGaussM Callout Initial Keystone cemGaussM Callout Subsequent Keystones (To be set onto the realignment grid) cemGaussM Callout Intermediate headstones are set after keystones are established cemGaussM Text Box In sloping terrain additional keystones may need to be set to provide a smooth transition

File details come from the government source that posted it. Updated .