Attachment 9 Contractors Daily Log of Construction.pdf
PDF 165 KB Posted
- Solicitation number
- 36C78626B0008
About this file
This document is a template for the Contractor's Daily Log of Construction, designed as an Inspector Quality Assurance Report (Q.A.R.) for federal construction projects. The form serves as a standardized daily reporting tool for monitoring construction project progress and compliance.
The template captures essential project information including contract number, project title, location, and key personnel (Contracting Officer, Contracting Officer's Representative, contractor details, and site manager information). It documents daily weather conditions (temperature, precipitation, visibility, and wind speed) and identifies weather-related delays affecting 50% or more of the critical path. The form tracks workforce composition across various trade categories and lists equipment on site, materials delivered, and visitor information. The document includes dedicated sections for project comments, deficiencies, potential causes for delay, and tests and observations. Work accomplished is organized by construction divisions: Division 1 (General Conditions), Division 2 (Existing Conditions), Division 31 (Earthwork), and Division 32 (Exterior Improvements including flat marker support systems, headstone setting, and turf renovation). The form requires weekly progress meeting documentation with signatures and dates from the site manager and supervisors, and includes space for project photographs. This template is intended for cemetery or memorial ground construction projects based on the headstone and marker-related specifications listed.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 9
CONTRACTOR’S DAILY LOG OF CONSTRUCTION
INSPECTOR QUALITY
ASSURANCE REPORT (Q.A.R.)
DAILY LOG OF CONSTRUCTION
REPORT NUMBER: 01
Project Completion at 00 %
DATE:
CONTRACT NUMBER:
Project Title:
Location:
Contractor:
Name:
Address:
Phone:
Contractor’s Site Manager:
Name:
Address:
Phone:
Contracting Officer:
COR:
Midwest District Project Managers:
WEATHER CONDITIONS:
Temperature:
Max: ° Min: °
Precipitation:
(24hour total)
Visibility:
Miles:
Wind Speed:
mph
WEATHER RELATED DELAYS:
(Affected 50% or more of critical path?)
YES OR NO
OFFICIAL WEATHER DELAY DATES:
WORK FORCE-CONTRACTORS & SUB-CONTRACTORS:
TRADE: # TRADE: # TRADE: #
Project Manager Site Manager QC manager PM assistant Field Admin- Misc. Laborers Field Engineer Construction Mgr.
VISITORS: COMPANY:
EQUIPMENT ON SITE:
1.
2.
3.
4.
5.
6.
MATERIALS DELIVERED TO JOB SITE:
PROJECT COMMENTS:
DEFICIENCIES:
POTENTIAL CAUSES FOR DELAY:
TESTS AND OBSERVATION:
WORK ACCOMPLISHED / PREP. MEETINGS CONDUCTED TODAY:
DIVISION 1: GENERAL CONDITIONS
01 33 23 - Shop Drawings, Product Data, and Samples
01 45 29 - Testing Laboratory Services
DIVISION 2: EXISTING CONDITIONS
02 21 00 – Site Surveying
DIVISION 31: EARTHWORK
31 00 00 - Earthwork
DIVISION 32: EXTERIOR
IMPROVEMENTS
32 39 20 - Flat Marker Support System, Headstone Setting, Alignment, Backfilling, and Headstone Cleaning
32 92 24 – Turf Renovation
WEEKLY PROGRESS MEETINGS:
Site Manager’s Signature: Date Supervisors Initials: Date
PHOTOS:
File details come from the government source that posted it. Updated .