Exhibit_C_As_Built_Prints,_Clarifier_No._4_(Revised).pdf

PDF 35 MB Posted

Attached to
Northwest Water Reclamation Facility Clarifier #4 Rehabilitation
Solicitation number
IFB- 25 - 257
Issued by
Pinellas County, Florida

About this file

The file is an exhibit of As-Built Prints for Clarifier No. 4 at the Northwest Water Reclamation Facility (NWWRF) in St. Petersburg, Florida, involving detailed mechanical and structural rehabilitation drawings. The project, identified as IFB-25-257, seeks to comprehensively rehabilitate a 135-foot diameter secondary clarifier through complete removal and replacement of the existing clarifier mechanism, submerged and non-submerged components, and surface preparation and recoating of interior vertical masonry walls and metal supports. The solicitation was released on August 15, 2025, with a pre-proposal meeting held on August 21, 2025, and bid responses due by October 2, 2025, at 3:00 pm. The total project duration is anticipated to be 240 calendar days from the Notice to Proceed, with an additional 11-month warranty period.

The procurement includes a Small Business Enterprise (SBE) goal of 25% and requires contractors to have a minimum of five years of experience in municipal or industrial wastewater mechanical rehabilitation, with successful completion of five similar projects and a State of Florida General Contractor License. Payment will be structured in three stages: 10% upon mobilization and submittal approval, 60% based on progress, and 30% upon final completion. The project will utilize an Ovivo center column, drive mechanism, and spiral scraper design, with a $15,000 contingency allowance for unforeseen conditions. Contractors must provide comprehensive insurance coverage, including commercial general liability, automobile liability, workers' compensation, and pollution liability. The rehabilitation will employ Tnemec epoxy coating systems and involves rigorous quality control measures to ensure long-term performance and asset protection of the water reclamation facility's critical infrastructure.

View the file

Other files

File Type Posted
Northwest_Water_Reclamation_Facility_Clarifier_#4_Rehabilitation_(Addendum_#5_Revision).pdf PDF
Pre-bid_8-21_sign_in_sheet.pdf PDF
Pre-bid_sign_in_sheet.pdf PDF
Exhibit_A_Technical_Specifications_Clarifier_No._4_(revised).docx DOCX document
Exhibit_G_JWC_Environ_Muffin_Monster_Grinder_Pump_Control_Panel.pdf PDF
Exhibit_F_Contract_Plans_Clarifier_No._5_NEWRF_(reference_only_of_similar_project).pdf PDF
Exhibit_E_Photo_Documentation_NE_NW_WAS_Pumping_Station_Pads_(Reference_only_of_similar_installation)_.pdf PDF
Exhibit_C_As_Built_Prints,_Clarifier_No._4_(Revised).pdf PDF
Exhibit_D_Ovivo_Mechanism_Components_(Revised).pdf PDF
Exhibit_B_Coating_Specifications_(Revised).pdf PDF
Exhibit_A_Technical_Specifications_Clarifier_No._4.pdf PDF
Exhibit_A_Technical_Specifications_Clarifier_No._4.pdf PDF
Northwest_Water_Reclamation_Facility_Clarifier_#4_Rehabilitation_(Addendum_#1_Revision).pdf PDF
Pre_Bid_Sign_in_Sheet_Clairifier.pdf PDF
Agreement__Clarifier_#4_Rehabilitation_RM_Comments_8-5-25.docx DOCX document
Ovivo_Mechanism_&_Component_Info_(Exhibit_A).docx DOCX document
200218_NWWRF_Clarifier_4_Technical_Specs.pdf PDF
NWWRF_Clarifer_#4_As_Built_Prints_(Exhibit_B).pdf PDF
09_96_00_Spec_NWWRF_Clarifier_4_(Exhibit_C).docx DOCX document
NWWRF_Clarifier_#4_Rehab_Bid_Proposal_Form.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet M1 NWWRF Clarifier No. 4

Sheet M2 NWWRF Clarifier No. 4
Sheet M3 NWWRF Clarifier No. 4
Sheet M4 NWWRF Clarifier No. 4
Sheet S1 NWWRF Clarifier No. 4
Sheet S2 NWWRF Clarifier No. 4

File details come from the government source that posted it. Updated .