About this file
This document package contains Exhibit B1 (agency-specific requirements document hyperlinks), Exhibit E (Security Requirements for Level II facilities), and portions of the VA HVAC Design Manual—all supporting materials for a VA clinic lease solicitation in Tarrant County, Texas.
The security requirements establish minimum standards for a Facility Security Level II leased space, requiring the lessor to design, install, and maintain comprehensive security systems including closed-circuit television (CCTV) with time-lapse recording and remote viewing capabilities, intrusion detection systems (IDS) covering perimeter doors and ground-floor windows with monitoring through the Department of Homeland Security Megacenter, and duress alarm systems. The lessor must implement access control at building entrances, secure critical areas (mechanical spaces, roofs, electrical closets, telecommunications rooms) through keyed locks or keycards, maintain landscaping to minimize concealment opportunities, place trash receptacles and mailboxes at least 10 feet from the building, and cooperate with the Facility Security Committee throughout the lease term. All security system critical components must be replaced or repaired within 5 business days if inoperable, with the lessor bearing costs for government-provided guard services if replacement measures are insufficient. Building information including mechanical and security plans must be strictly controlled and released only to authorized personnel, and lessors are prohibited from connecting building automation and control systems to federally-owned IT networks, though cyber protection measures following DHS and NIST guidance are encouraged.
The HVAC Design Manual excerpt provides comprehensive technical standards applicable to VA healthcare facility design, including requirements for outdoor and indoor design conditions, cooling and heating load calculations using ASHRAE standards, individual space temperature controls for critical areas such as patient bedrooms and operating rooms, demand-controlled ventilation for large high-occupancy spaces, psychrometric analysis for each air-handling unit, and energy conservation requirements mandating ASHRAE 90.1-2019 compliance with 30 percent site energy reduction where lifecycle cost-effective. The manual establishes that the lessor must coordinate with VA's Technical Information Library standards, including fire protection, physical security, plumbing, telecommunications, and sustainable design manuals, and emphasizes commissioning practices to verify system performance against design requirements.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B1 – Agency Specific Requirements – Document Hyperlinks
No: Document Name Document Hyperlink
1 FSL II
FSL II.pdf
2 HVAC Design Manual
HVAC design manual.pdf
3 Interior Signage
Interior signage.pdf
4 IT Support Infrastructure Standards
IT support infrastucture standard
5 OIT Design Template for Critical Telecommunications
OIT design template for critical telecommu
6 OIT Infrastructure Standards Page Breakdown
OIT infrastructure standards page breakd
7 Physical Security and Resiliency Design Manual
Physical Security and Resiliency Design Man
8 s2 Netbox VR Cuatro s2 netbox VR cuatro.pdf
9 Security Cameras security camera.pdf
10 Security Panel Brochure
Security panel brochure.pdf
11 Sensors sensors.pdf
12 Telecomm Manual
Telecomm manual.pdf
13 Touchless Tile Dispenser touchless tile dispenser.pdf
LEASE# 36C26320L0012, Exhibit E – Security Requirements for Level II
SECURITY REQUIREMENTS (LEVEL II) LESSOR: ________ GOVERNMENT: ________
REV (06/22/18)
SECURITY REQUIREMENTS - FACILITY SECURITY LEVEL II
THESE PARAGRAPHS CONTAIN ADDITIONAL SECURITY REQUIREMENTS, AND, UNLESS
INDICATED OTHERWISE, ARE TO BE PRICED AS PART OF THE BUILDING SPECIFIC AMORTIZED
CAPITAL (BSAC). WHERE THEY ARE IN CONFLICT WITH ANY OTHER REQUIREMENTS ON THIS
LEASE, THE STRICTEST SHALL APPLY.
DEFINITIONS:
CRITICAL AREAS - The areas that house systems that if damaged or compromised could have significant adverse consequences for the facility, operation of the facility, or mission of the agency or its occupants and visitors. These areas may also be referred to as “limited access areas,” “restricted areas,” or “exclusionary zones.” Critical areas do not necessarily have to be within Government-controlled space (e.g., generators, air handlers, electrical feeds which could be located outside Government-controlled space).
SENSITIVE AREAS – Sensitive areas include vaults, SCIFs, evidence rooms, war rooms, and sensitive documents areas. Sensitive areas are primarily housed within Government-controlled space.
FACILITY ENTRANCES, LOBBY, COMMON AREAS, NON-PUBLIC, AND UTILITY
AREAS.
FACILITY ENTRANCES AND LOBBY
EMPLOYEE ACCESS CONTROL AT ENTRANCES (SHELL)
The Lessor shall provide key or electronic access control for the entrance to this building. All Government employees, under this lease, shall be allowed access to the leased space (including after-hours access).
COMMON AREAS, NON-PUBLIC, AND UTILITY AREAS.
PUBLIC RESTROOM ACCESS (SHELL)
The Government reserves the right to control access to public restrooms located within the Space.
SECURING CRITICAL AREAS (SHELL)
The Lessor shall secure areas designated as Critical Areas to restrict access:
A. Keyed locks, keycards, or similar security measures shall strictly control access to mechanical areas. Additional controls for access to keys, keycards, and key codes shall be strictly maintained. The Lessor shall develop and maintain accurate HVAC diagrams and HVAC system labeling within mechanical areas.
B. Roofs with HVAC systems shall also be secured. Fencing or other barriers may be required to restrict access from adjacent roofs based on a Government Building Security Assessment. Roof access shall be strictly controlled through keyed locks, keycards, or similar measures. Fire and life safety egress shall be carefully reviewed when restricting roof access.
C. At a minimum, Lessor shall secure building common areas including sprinkler rooms, electrical closets, telecommunications rooms.
VISITOR ACCESS CONTROL (SHELL)
Entrances are open to the public during business hours. After hours, visitor entrances are secured, and have a means to verify the identity of persons requesting access prior to allowing entry into the Space.
INTERIOR (GOVERNMENT SPACE)
DESIGNATED ENTRANCES (SHELL)
The Government shall have a designated main entrance.
IDENTITY VERIFICATION (SHELL)
The Government reserves the right to verify the identity of persons requesting access to the Space prior to allowing entry.
FORMAL KEY CONTROL PROGRAM (SHELL)
The Government reserves the right to implement a formal key control program. The Lessor shall have a means of allowing the electronic disabling of lost or stolen access media, if electronic media is used.
SITES AND EXTERIOR OF THE BUILDING
SIGNAGE
POSTING OF SIGNAGE IDENTIFYING THE SPACE AS GOVERNMENTAL (SHELL)
The Lessor shall not post sign(s) or otherwise identify the facility and parking areas as a Government, or specific Government tenant, occupied facility, including during construction, without written Government approval.
POSTING OF REGULATORY SIGNAGE (SHELL)
The Government may post or request the Lessor to post regulatory, statutory, sensitive areas and site specific signage.
LANDSCAPING
LANDSCAPING REQUIREMENTS (SHELL)
Lessor shall maintain landscaping (trees, bushes, hedges, land contour, etc,) around the facility. Landscaping shall be neatly trimmed in order to minimize the opportunity for concealment of individuals and packages/containers. Landscaping shall not obstruct the views of security guards and CCTV cameras, or interfere with lighting or IDS equipment.
CRIME PREVENTION THROUGH ENVIRONMENTAL DESIGN (SHELL)
The Lessor shall separate from public access, restricted areas as designated by the Government, through the application of Crime Prevention Through Environmental Design (CPTED) principles by using trees, hedges, berms, or a combination of these or similar features, and by fences, walls, gates and other barriers, where feasible and acceptable to the Government.
HAZMAT STORAGE
If there is HAZMAT storage, Lessor shall locate it in a restricted area or storage container away from loading docks, entrances, and uncontrolled parking.
PLACEMENT OF RECEPTACLES, CONTAINERS, AND MAILBOXES
Trash receptacles, containers, mailboxes, vending machines, or other fixtures and/or features that could conceal packages, brief cases, or other portable containers shall be located 10 feet away from building.
SECURITY SYSTEMS
CLOSED CIRCUIT TELEVISION SYSTEM (CCTV)
LESSOR PROVIDED DESIGN, INSTALLATION, AND MAINTENANCE
The lessor shall design, install, and maintain a Closed Circuit Television (CCTV) system as described in this section. The CCTV system will support the entry control system (at entrances and exits to the space), with time lapse video recording, that will allow Government employees to view and communicate remotely with visitors before allowing access to the Space. As determined by the Government the CCTV system shall provide unobstructed coverage of designated pedestrian entrances and exits. Technical review of the proposed system shall be coordinated with the Government security representative, at the direction of the Contracting Officer, prior to installation. CCTV system testing and acceptance shall be conducted by the Government prior to occupancy. The CCTV system shall comply with the Architectural Barriers Act, section F230.0. The Government will centrally monitor the CCTV system. Government specifications are available from the Lease Contracting Officer. CCTV system components which fail or require maintenance or which fail during testing should be serviced in accordance with the Security System Maintenance Criteria listed below.
Security System Maintenance Criteria: The Lessor, in consultation and coordination with a security provider, either internal or external, as determined by the Lease Contracting Officer, and the Government security representative, shall implement a preventive maintenance program for all security systems the Lessor has installed. Any critical component that becomes inoperable must be replaced or repaired by the Lessor within 5 business days. Critical components are those required to provide security (IDS, CCTV, access control, etc.) for a perimeter access point or critical area. "Replacement" may include implementing other temporary measures in instances where the replacement or repair is not achievable within the specified time frame (e.g. a temporary barrier to replace an inoperable pop-up vehicle barrier, etc.). Failure by the Lessor to provide sufficient replacement measures within the timeframe identified above may result in the Government’s providing guard service, the cost of which must be reimbursed by the Lessor.
INTRUSION DETECTION SYSTEM (IDS)
The Lessor shall design, install, and maintain an Intrusion Detection System (IDS) as described in this section. The Government requires an IDS, which will cover perimeter entry and exit doors, and operable ground-floor windows. Basic Security-in-Depth IDS components include: magnetic door switch(s), alarm system keypad, passive infrared sensor(s) (PIR), an alarm panel (to designated monitoring center) and appropriate communication method i.e. telephone and/or Internet connection, glass-break detector, magnetic window switches or shock sensors. Technical review of the proposed system shall be coordinated with the Government security representative, at the direction of the Lease Contracting Officer, prior to installation.
System testing and acceptance shall be conducted by the Government prior to occupancy.
Basic Security-in-Depth IDS shall be connected to and monitored at a central station operated by the Department of Homeland Security Megacenter. Emergency notification lists shall be coordinated with the monitoring station to include all applicable Government and lessor points of contact. Monitoring shall be designed to facilitate a real-time detection of an incident, and to coordinate an active response to an incident.
The Lessor must complete the Megacenter Alarm Requirements (MAR) application process specified by the Government to meet the monitoring requirements for a functional IDS. Components which fail or require maintenance or which fail during testing shall be serviced in accordance with the Security System Maintenance Criteria listed below..
Security System Maintenance Criteria: The Lessor, in consultation and coordination with a security provider, either internal or external, as determined by the Lease Contracting Officer, and the Government security representative, shall implement a preventive maintenance program for all security systems the Lessor has installed. Any critical component that becomes inoperable must be replaced or repaired by the Lessor within 5 business days. Critical components are those required to provide security (IDS, CCTV, access control, etc.) for a perimeter access point or critical area. "Replacement" may include implementing other temporary measures in instances where the replacement or repair is not achievable within the specified time frame (e.g. a temporary barrier to replace an inoperable pop-up vehicle barrier, etc.). Failure by the Lessor to provide sufficient replacement measures within the timeframe identified above may result in the Government’s providing guard service, the cost of which must be reimbursed by the Lessor.
DURESS ALARM
The Lessor shall design, install, and maintain a duress alarm system as described Technical review shall be coordinated with the Government security representative, at the direction of the Contracting Officer, prior to installation. System testing and acceptance shall be conducted by the Government prior to occupancy. This system shall comply with the Architectural Barriers Act, section F230.0.
The Lessor in consultation and coordination with the security provider and Government shall conduct security system performance testing annually. Testing must be based on established, consistent agency-specific protocols, documented and furnished to the Contracting Officer. Components which fail or require maintenance or which fail during testing should be serviced in accordance with the Security System Maintenance Criteria listed below.
Security System Maintenance Criteria: The Lessor in consultation and coordination with a security provider, either internal or external, as determined by the Lease Contracting Officer, and the Government security representative shall implement a preventive maintenance program for all security systems they have installed. Any critical component that becomes inoperable must be replaced or repaired within 5 business days. Critical components are those required to provide security (IDS, CCTV, access control, etc.) for a perimeter access point or critical area. "Replacement" may include implementing other temporary measures in instances where the replacement or repair is not achievable within the specified time frame (e.g. a temporary barrier to replace an inoperable pop-up vehicle barrier, etc.). Failure by the Lessor to provide sufficient replacement measures within the timeframe identified above may result in the Government’s providing guard service, the cost of which must be reimbursed by the Lessor.
STRUCTURE
WINDOWS
No countermeasures are required for baseline standard.
OPERATIONS AND ADMINISTRATION
LESSOR TO WORK WITH FACILITY SECURITY COMMITTEE (FSC) (SHELL)
The Lessor shall cooperate and work with the buildings Facility Security Committee (FSC) throughout the term of the lease.
ACCESS TO BUILDING INFORMATION (SHELL)
Building Information—including mechanical, electrical, vertical transport, fire and life safety, security system plans and schematics, computer automation systems, and emergency operations procedures—shall be strictly controlled. Such information shall be released to authorized personnel only, approved by the Government, by the development of an access list and controlled copy numbering. The Contracting Officer may direct that the names and locations of -Government tenants not be disclosed in any publicly accessed document or record. If that is the case, the Government may request that such information not be posted in the building directory.
Lessor shall have emergency plans and associated documents readily available in the event of an emergency.
CYBERSECURITY (SHELL)
A. Lessors are prohibited from connecting any portion of their building and access control systems (BACS) to any federally-owned or operated IT network. BACS include systems providing fire and life safety control, physical access control, building power and energy control, electronic surveillance, and automated HVAC, elevator, or building monitoring and control services (including IP addressable devices, application servers, or network switches).
B. In the event of a cybersecurity incident related to BACS, the Lessor shall initially assess the cyber incident, identify the impacts and risks to the Building and its occupants, and follow their organization’s cyber and IT procedures and protocols related to containing and handling a cybersecurity incident. In addition, the Lessor shall immediately inform the Lease Contracting Officer’s (LCO’s) designated representative, i.e., the Lease Administration Manager (LAM), about cybersecurity incidents that impact a federal tenant’s safety, security, or proper functioning.
C. Lessors are encouraged to put into place the following cyber protection measures in order to safeguard facilities and occupants:
1. Engineer and install BACS to comply with the Department of Homeland Security Industrial Control Systems Computer Emergency Response Team (DHS ICS-CERT) cyber security guidance and recommendations (https://ics-cert.us-cert.gov/Recommended-Practices).
2. Refer to the National Institute of Standards and Technology Cyber Security Framework (NISTCSF) (https://www.nist.gov/cyberframework) and cybersecurity guidance in the DHS Commercial Facilities Sector-Specific Plan (https://www.dhs.gov/publication/nipp-sspcommercial-facilities-2015) for best practices to manage cyber risks.
3. Encourage vendors of BACS to secure these devices and software through the following:
a. Develop and Institute a proper Configuration Management Plan for the BACS devices and applications, so that the system can be supported.
b. Safeguard sensitive data and/or login credentials through the use of strong encryption on devices and applications. This means using NIST- approved encryption algorithms, secure protocols (i.e., Transport Layer Security (TLS) 1.1, TLS 1.2, TLS 1.3) and Federal Information Processing Standard (FIPS) 140-2 validated modules.
c. Disable unnecessary services in order to protect the system from unnecessary access and a potential exposure point by a malicious attacker. Examples include File Transfer ProtocolFTP (a protocol used for transferring files to a remote location) and Telnet (allowing a user to issue commands remotely). Additionally, use of protocols that transmit data in the clear (such as default ZigBee) should be avoided, in favor of protocols that are encrypted.
https://ics-cert.us-cert.gov/Recommended-Practices https://ics-cert.us-cert.gov/Recommended-Practices https://www.nist.gov/cyberframework https://www.nist.gov/cyberframework https://www.dhs.gov/publication/nipp-ssp-commercial-facilities-2015 https://www.dhs.gov/publication/nipp-ssp-commercial-facilities-2015 https://www.dhs.gov/publication/nipp-ssp-commercial-facilities-2015 https://www.dhs.gov/publication/nipp-ssp-commercial-facilities-2015
d. Close unnecessary open ports to secure against unprivileged access.
e. Monitor and free web applications and supporting servers of common vulnerabilities in web applications, such as those identified by the (Open Web Application Security Project (OWASP) Top 10 Project (https://www.owasp.org/index.php/Category:OWASP_Top_Ten_Project).
f. Enforce Least Privilege, where proper permissions are enforced on a device or application so that a malicious attacker cannot gain access to all data. Enforcing Least Privilege will only allow users to access data they are allowed to see. Additional information can be found at https://www.beyondtrust.com/blog/what-is-least-privilege/
g. Protect against Insufficient User Access Auditing, where device or application does not have a mechanism to log/track activity by user. Enforce changing of factory default Username and Password to prevent unauthorized entry into the BACS system.
h. Use updated antivirus software subscription at all times. Kaspersky-branded products or services, prohibited from use by the Federal Government, are not to be utilized.
i. Conduct antivirus and spyware scans on a regular basis. Patching for workstations and server Operating System (OS), as well as vulnerability patching should follow standard industry best practices for software development life cycle (SDLC).
j. Discontinue the use of end of life (EOL) systems and use only applications/systems that are supported by the manufacturer.
k. Operating Systems must be supported by the vendor for security updates (e.g., do not use Windows Server 2003).
l. Proposed standard installation, operation, maintenance, updates, and/or patching of software shall not alter the configuration settings from the approved United States Government Configuration Baseline (USGCB) or tenant agency guidance (if applicable).
m. Disallow the use of commercially-provided circuits to manage building systems and install building systems on a protected network, safeguarded by the enterprise firewalls in place.
Workstations or servers running building monitor and control systems are not connected and visible on the public internet.
n. Systems should have proper system configuration hardening and align with Center for Internet Security (CIS) benchmarks or other industry recognized benchmarks. Additional information can be found at https://www.cisecurity.org/cis-benchmarks/.
https://www.owasp.org/index.php/Category:OWASP_Top_Ten_Project https://www.owasp.org/index.php/Category:OWASP_Top_Ten_Project https://www.owasp.org/index.php/Category:OWASP_Top_Ten_Project https://www.cisecurity.org/cis-benchmarks/ https://www.cisecurity.org/cis-benchmarks/
SECURITY REQUIREMENTS - FACILITY SECURITY LEVEL II
THESE PARAGRAPHS CONTAIN ADDITIONAL SECURITY REQUIREMENTS, AND, UNLESS
FACILITY ENTRANCES AND LOBBY
EMPLOYEE ACCESS CONTROL AT ENTRANCES (SHELL)
SECURING CRITICAL AREAS (SHELL)
VISITOR ACCESS CONTROL (SHELL)
INTERIOR (GOVERNMENT SPACE)
IDENTITY VERIFICATION (SHELL)
FORMAL KEY CONTROL PROGRAM (SHELL)
SITES AND EXTERIOR OF THE BUILDING
SIGNAGE
POSTING OF SIGNAGE IDENTIFYING THE SPACE AS GOVERNMENTAL (SHELL)
POSTING OF REGULATORY SIGNAGE (SHELL)
LANDSCAPING
LANDSCAPING REQUIREMENTS (SHELL)
CRIME PREVENTION THROUGH ENVIRONMENTAL DESIGN (SHELL)
HAZMAT STORAGE
PLACEMENT OF RECEPTACLES, CONTAINERS, AND MAILBOXES
SECURITY SYSTEMS
CLOSED CIRCUIT TELEVISION SYSTEM (CCTV)
LESSOR PROVIDED DESIGN, INSTALLATION, AND MAINTENANCE
INTRUSION DETECTION SYSTEM (IDS)
LESSOR PROVIDED DESIGN, INSTALLATION, AND MAINTENANCE
DURESS ALARM
LESSOR PROVIDED DESIGN, INSTALLATION, AND MAINTENANCE
STRUCTURE
OPERATIONS AND ADMINISTRATION
LESSOR TO WORK WITH FACILITY SECURITY COMMITTEE (FSC) (SHELL)
ACCESS TO BUILDING INFORMATION (SHELL)
CYBERSECURITY (SHELL)
Facilities Management
HVAC
design
NOVEMBER 1, 2017
Rev. March 1, 2024
HVAC Design Manual May 1, 2023
GENERAL i
TABLE OF CONTENTS
Chapter 1: BASIC REQUIREMENTS
1.1 GENERAL .................................................................................................................................... 1-2
1.2 ENERGY CONSERVATION ........................................................................................................... 1-3
1.3 MEASUREMENT AND VERIFICATION.......................................................................................... 1-4
1.4 ABBREVIATIONS AND REFERENCES ............................................................................................ 1-4
1.5 COMMISSIONING ....................................................................................................................... 1-4
1.6 VA STANDARDS .......................................................................................................................... 1-4
1.7 HVAC DESIGN MANUAL (PG 18-10) AND
A/E SUBMISSION REQUIREMENTS (PG 18-15) ........................................................................ 1-13
1.8 VA HOSPITAL BUILDING SYSTEM ............................................................................................. 1-14
APPENDIX 1-A: VA HOSPITAL BUILDING SYSTEM .................................................................................... 1-15
1-A.1 DESCRIPTION OF MODULES ................................................................................................. 1-15
1-A.2 REFERENCES ......................................................................................................................... 1-16
1-A.3 BASIC DESIGN OF A SERVICE ZONE ...................................................................................... 1-16
Chapter 2: HVAC DESIGN PARAMETERS AND SELECTION CRITERIA
2.1 GENERAL .................................................................................................................................... 2-2
2.2 BASIS OF DESIGN ........................................................................................................................ 2-2
2.3 SPECIAL STUDIES ........................................................................................................................ 2-8
2.4 BUILDING THERMAL ENVELOPE (EXISTING FACILITIES ONLY) ................................................. 2-11
2.5 VIBRATION CONTROL ............................................................................................................... 2-11
2.6 SEISMIC DESIGN REQUIREMENTS ............................................................................................ 2-11
2.7 FIRE AND SMOKE PROTECTION ................................................................................................ 2-13
2.8 DESIGN CONSIDERATIONS FOR EXISTING BUILDINGS ............................................................. 2-14
2.9 PROJECT PLANNING ................................................................................................................. 2-16
2.10 DEMOLITION WORK ................................................................................................................. 2-16
2.11 LOCATIONS OF OUTDOOR AIR INTAKES AND EXHAUST AIR OUTLETS .................................... 2-16
Chapter 3: AIRSIDE HVAC SYSTEMS AND EQUIPMENT
3.1 INTRODUCTION ............................................................................................................................. 3-3
3.2 ALL-AIR SYSTEMS .......................................................................................................................... 3-3
3.3 TERMINAL COOLING AND HEATING SYSTEMS ............................................................................ 3-13
GENERAL ii
3.4 HEATING AND VENTILATION UNITS (HVU) ................................................................................. 3-15
3.5 SUPPLY AIR OUTLETS .................................................................................................................. 3-16
3.6 ENERGY RECOVERY SYSTEMS ...................................................................................................... 3-17
3.7 DESIGN CRITERIA – AIR DISTRIBUTION SYSTEMS ....................................................................... 3-19
3.8 EXHAUST SYSTEMS ...................................................................................................................... 3-22
3.9 LABORATORIES AND VETERINARY MEDICAL UNITS .................................................................... 3-24
3.10 FUME HOOD EXHAUST SYSTEMS............................................................................................ 3-26
3.11 BIOLOGICAL SAFETY CABINETS (BSC) ..................................................................................... 3-29
3.12 BIOLOGICAL SAFETY LEVEL 3 (BSL3) ....................................................................................... 3-30
Chapter 4: BUILDING COOLING AND HEATING SYSTEM
4.1 INTRODUCTION .......................................................................................................................... 4-2
4.2 COOLING SYSTEMS – CHILLED WATER ....................................................................................... 4-2
4.3 COOLING SYSTEMS - DIRECT EXPANSION (DX) ........................................................................ 4-12
4.4 HEATING SYSTEMS ................................................................................................................... 4-13
4.5 DESIGN CRITERIA – PIPING SYSTEMS ....................................................................................... 4-21
APPENDIX 4-A: PROPYLENE GLYCOL – WATER SOLUTION ....................................................................... 4-30
4-A.1 GENERAL .............................................................................................................................. 4-30
4-A.2 PUMP SELECTION ................................................................................................................. 4-32
4-A.3 SAMPLE PUMP SELECTION – WITH PROPYLENE GLYCOL SOLUTION ................................... 4-33
4-A.4 NOTES TO BE ADDED TO EQUIPMENT SCHEDULES ............................................................. 4-36
Chapter 5: HVAC CONTROL SYSTEMS
5.1 GENERAL .................................................................................................................................... 5-2
5.2 BASIC DESIGN NEW STANDALONE FACILITY .............................................................................. 5-5
5.3 BACNET CONTROLLER IDENTIFICATION ..................................................................................... 5-5
5.4 BASIC DESIGN ALL PROJECTS INTEGRATING TO EXISTING DDC SYSTEMS ................................. 5-5
5.5 SPECIFIC REQUIREMENTS .......................................................................................................... 5-6
5.6 HUMIDITY SENSORS ................................................................................................................. 5-11
5.7 SYSTEM APPLICATIONS ............................................................................................................ 5-11
5.8 SUSTAINABILITY AND MAINTAINABILITY PRACTICES ............................................................... 5-15
5.9 DOCUMENTATION REQUIREMENTS ........................................................................................ 5-16
Chapter 6: APPLICATIONS
6.1 OVERVIEW ..................................................................................................................................... 6-5
GENERAL iii
6.2 DEDICATED AIR-HANDLING UNITS ................................................................................................ 6-5
6.3 COMMON (NON-DEDICATED) AIR-HANDLING UNITS ................................................................... 6-6
6.4 DESIGNATED EMERGENCY EPIDEMIC AIR HANDLING UNITS ....................................................... 6-7
6.5 GENERAL NOTES ........................................................................................................................... 6-8
DEDICATED AHU SYSTEM DATA SHEETS AND ROOM DATA SHEETS .................................................... 6-15
All Chapter 6 System and Room Data in Excel (Section 508 compliant)
Chapter 7: CLIMATIC DATA
7.1 CLIMATIC CONDITIONS ................................................................................................................. 7-2
7.2 HIGH HUMIDITY LOCATIONS ....................................................................................................... 7-14
7.3 LOW HUMIDITY LOCATIONS ....................................................................................................... 7-15
Chapter 8: ABBREVIATIONS AND REFERENCES
8.1 ABBREVIATIONS ......................................................................................................................... 8-2
8.2 REFERENCES ............................................................................................................................... 8-8 https://www.cfm.va.gov/til/dManual/dmHVAC06-Table.xlsx
GENERAL iv
FOREWORD
VA Program Offices, project teams, designers and constructors, are obligated to our Nation's Veterans and taxpayers to make the most effective and efficient use of resources, by providing a continuum of safe, secure, high quality, high performance, and high value environments of care and service for Veterans. The VA Office of Construction and Facilities Management (CFM) supports the Department's mission through development and application of standards as a basis for disciplined planning, design, and construction of VA facilities.
VA Standards are the culmination of a partnership among the Department of Veterans Affairs (VA), the VA Administrations, Program Officials, Clinicians, Industry, Academic and Research Organizations, Expert Consultants, and the Office of Construction and Facilities Management.
VA Standards are developed through integration of VA-specific requirements, Federal law and regulation, benchmarking of industry best practice, evidence-based research and design, and value-based analysis of leading edge innovation. The result is the establishment of best value standards for optimum functionality, safety, operability, performance, and quality throughout the VA environment of care and service.
The VA Technical Information Library (TIL) (www.cfm.va.gov/TIL) provides standards for all VA planning, design, and construction projects. VA TIL Standards communicate the basis of design and are required to be utilized by project teams working on new construction and renovations of existing facilities. VA Standards will maximize the effectiveness and efficiency of the planning and design process and facilitate a high level of design, while controlling construction, operating, and maintenance costs.
For all VA projects, it is required that project teams comply with the following in all phases of project development:
1) All applicable VA Standards published in the VA Technical Information Library (TIL) shall be applied as a basis, foundation, and framework in planning, design, and construction.
Any substantial variance from Standards shall be considered only as required to accommodate specific site, functional, and operational conditions. Upon consideration of variance CFM shall be consulted, and each Administration will function as Authority Having Jurisdiction for decision. Each substantial variance shall have a basis rationale and be documented in the project record;
2) Clinicians, providers, primary users, and other stakeholders shall be involved in all phases of project development to best adapt Standards for specific functional, operational, and site conditions, and to provide optimum service environments for Veterans. This also includes installations and modifications of systems or technology involving safety, security, functionality, or environmental quality. Stakeholder involvement shall be documented in the project record.
VA TIL Standards are not project-specific. It is impossible to foresee all rapidly evolving requirements of VA facilities and each site or project will have unique requirements or conditions. Site-specific issues must be addressed within the context of these standards and applied to each individual project. Use these Standards does not preclude the need for, nor absolve planners, designers, and constructors of their responsibility to provide complete, http://www.cfm.va.gov/TIL
GENERAL v functional, safe, and secure designs suited to the unique requirements of each project, within budget, and on schedule.
Materials, equipment and systems are shown in an illustrative, performance-based format and are not intended to depict, suggest, or otherwise constitute endorsement of any specific product or manufacturer. Manufacturers should be consulted for actual dimensions, configurations, and utility requirements.
For additional information regarding the VA Technical Information Library and development and application of VA planning, design, and construction standards, please contact Donald L.
Myers, Director, Facilities Standards Service, US Department of Veterans Affairs, Office of Construction and Facilities Management.
GENERAL vi
ACKNOWLEDGEMENTS
The following individuals are those whose guidance, insight, advice and expertise made the update and revision of the HVAC Design Manual possible:
DEPARTMENT OF VETERANS AFFAIRS:
Donald L. Myers, AIA Director Facilities Standard Services (003C2B) VA Office of Construction and Facilities Management Washington DC
Mahmut Nazli, PE Senior Mechanical Engineer and Project Manager Facilities Standard Services (003C2B)
Dave Tash, PE Senior Mechanical Engineer Facilities Standard Services (003C2B)
Asesh Raychaudhuri, PE
Consulting Support Services (003C5)
Don Walden
Consulting Support Services (003C5)
Vincent Rizzo, PE Director, Office of Healthcare Engineering (19HEFE) VHA Office of Healthcare Environment and Facilities Programs Washington, DC
GENERAL vii
A/E AND CONSULTANTS:
TOLAND AND MIZELL ARCHITECTS, INC.
Matt Toland Project Manager Atlanta, Georgia
APPLIED ENGINEERING SOLUTIONS
Pedro J. Camejo, PE Assistant Project Manager Atlanta, Georgia
CLARK NEXSEN, INC.
Wade Williams, PE Mechanical Department Manager Macon, Georgia
GENERAL viii
INTRODUCTION
This VA HVAC Design Manual for the Department of Veterans Affairs (VA) Healthcare Facilities is the only detailed design requirements manual for VA. The original 2017 version has been edited several times since first publication to keep the information updated and synchronized with the latest industry trends. VA lessons learned, collected from VHA clinicians and operations personnel, have been incorporated as well. The November 1, 2021 revision of this manual includes high priority changes recommended by the VA CFM/VHA HVAC committee in response to the COVID-19 pandemic. Compliance to the Design Manual, which promulgates minimum performance design standards for VA owned and leased new buildings and renovated facilities, ensures that VA facilities will be of the highest quality to support Veterans Health Care.
The Office of Construction and Facilities Management (CFM) is responsible for developing and maintaining this Design Manual. Revisions are made as necessary. The Architect/Engineers (A/E), Project Managers (PM), Resident Engineers (RE), Contractors, and Consultants should refer to the VA Directives, VA Policies, VA Design Alerts and Memorandums before each use of this design manual to note any updates that have been made since the last use. The VA Design Manuals align the VA Facilities program with the VA mission.
VA has adopted the latest edition of the codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify additional codes and standards that VA follows on its projects.
Design, construction, renovation and installation of all VA Facilities must be in accordance with this Design Manual and with the latest editions and/or revisions of all applicable codes, policies and standards. Nothing in this Design Manual should be construed as authorization or permission to disregard or violate local and legal requirements.
Variance from this Design Manual may be proposed to promote new concepts and design enhancements. Variance shall not conflict with Federal Regulations, Public Laws, Executive Orders, or the needs of the end users. All variances shall be reviewed by the VHA Office of Healthcare Engineering (OHE) in consultation with CFM Consulting Support Service (CSS).
Any reviewed variances are subject to written approval by the VA Authority. The VA Authority for all VHA projects is the Director of the Office of Healthcare Engineering. The VA Authority for VBA and NCA projects is the Director of the Office of Construction and Facilities Management (CFM). Request for variance shall be submitted in writing by the A/E through the COR in sufficient detail to explain the issues.
BASIC REQUIREMENTS 1-1
Chapter 1: BASIC REQUIREMENTS Chapter 1: Table of Contents ...................................................................................................... 1-1
1.1 GENERAL .................................................................................................................................... 1-2
1.1.1 DEVIATIONS AND VA AUTHORITY ...................................................................................... 1-2
1.2 ENERGY CONSERVATION ........................................................................................................... 1-3
1.2.1 Energy Reduction Requirement - New Construction ......................................................... 1-3
1.2.2 Energy Reduction Requirement - Major Renovations ....................................................... 1-3
1.2.3 Life-Cycle Cost Analysis – Methodology ............................................................................ 1-3
1.2.4 VA POLICY ........................................................................................................................... 1-4
1.3 MEASUREMENT AND VERIFICATION.......................................................................................... 1-4
1.4 ABBREVIATIONS AND REFERENCES ............................................................................................ 1-4
1.5 COMMISSIONING ....................................................................................................................... 1-4
1.6 VA STANDARDS .......................................................................................................................... 1-4
1.6.1 VA MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1) .................................................. 1-5
1.6.2 DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3) ..................................................... 1-5
1.6.3 STANDARD DETAILS AND CAD STANDARDS (PG-18-4) ...................................................... 1-5
1.6.4 DESIGN MANUALS (by discipline) (PG-18-10) .................................................................... 1-6
1.6.5 DESIGN GUIDES (graphical, by function) (PG-18-12) ......................................................... 1-7
1.6.6 OTHER DOCUMENTS AND STANDARDS ........................................................................... 1-10
1.7 HVAC DESIGN MANUAL (PG 18-10) AND A/E SUBMISSION REQUIREMENTS (PG 18-15)....... 1-13
1.7.1 COORDINATION ............................................................................................................... 1-13
1.7.2 COMPLIANCE REQUIREMENTS ......................................................................................... 1-13
1.7.3 EQUIPMENT SCHEDULES .................................................................................................. 1-13
1.8 VA HOSPITAL BUILDING SYSTEM ............................................................................................. 1-14 APPENDIX 1-A: VA HOSPITAL BUILDING SYSTEM ..................................................................... 1-15
1-A.1 DESCRIPTION OF MODULES ................................................................................................. 1-15 GENERAL .......................................................................................................................................... 1-15 STRUCTURAL BAYS ........................................................................................................................... 1-15 THE SERVICE ZONE ........................................................................................................................... 1-15 THE FUNCTIONAL ZONE ................................................................................................................... 1-15 FIRE COMPARTMENT ....................................................................................................................... 1-15 UTILITIES .......................................................................................................................................... 1-15 ZONING OF AIR-HANDLING UNITS ................................................................................................... 1-16
1-A.2 REFERENCES ......................................................................................................................... 1-16 DEVELOPMENT STUDY-VAHBS (REDBOOK – REVISED 1976) ........................................................... 1-16 SUPPLEMENT TO DEVELOPMENT STUDY (2006) ............................................................................. 1-16
1-A.3 BASIC DESIGN OF A SERVICE ZONE ...................................................................................... 1-16
BASIC REQUIREMENTS 1-2
1.1 GENERAL
HVAC Design Manual for New, Replacement, Additions, and Renovations of Existing VA Facilities (March 2011 with Amendments A and B) and HVAC Design Manual for Community Living Centers and Domiciliary (March 2011) are revised to combine both documents into one manual and to incorporate changes resulting from the following:
• International Building Code (IBC) Including IMC and IPC
• ASHRAE Standard 170 – 2013 (Ventilation of Health Care Facilities)
• HVAC Design Criteria Revisions – Surgery Suite, SPS Suite, Animal Research, etc.
• Coordination With Current VA Design Guides
• Miscellaneous Corrections and Users’ Input
• VA Sustainable Design Manual
• Addition of Requirements for Central Laundries, and Office Buildings
This manual is intended for the Architect/Engineer (henceforth referred to as the A/E) and others engaged in the design and renovation of VA facilities. It is applicable to all Major Projects, Non-Recurring Maintenance (NRM) and Minor Construction Projects to ensure quality control and uniformity in design and construction practice and procedures.
Use of this manual shall result in meeting the primary objective of providing environmental comfort to patients, staff, and visitors. The HVAC system shall be:
• Technically correct, complete, and coordinated.
• In compliance with all applicable safety standards.
• Easily accessible for repairs and maintenance.
• Energy efficient.
• In compliance with prescribed noise and vibration levels.
1.1.1 DEVIATIONS AND VA AUTHORITY
Deviations from this manual may be proposed to promote new concepts and design enhancements and to contend with adverse existing conditions and limitations in renovation projects. Deviations shall not conflict with Federal Regulations, Public Laws, Executive Orders, or the needs of the end users. All deviations shall be reviewed and approved in writing by the VA Authority. The VA Authority for all VHA projects is the Director of the Office of Healthcare Engineering (OHE). The VA Authority for VACO, VBA and NCA projects is the Director of the Office of Construction and Facilities Management (CFM). Request for deviations shall be submitted in writing by the A/E through the COR in sufficient detail to explain the issues. The amount of documentation will vary on a case by case basis but in general may contain some or all of the following elements:
• Narrative explanation of the requested deviation (provided in all cases).
• Construction cost impact (provided in all cases).
• Construction schedule impact (provided in all cases).
• Equipment and material data sheets when applicable.
• Photographs of existing conditions when applicable.
BASIC REQUIREMENTS 1-3
• Calculations, including cost estimates.
• Drawings and sketches.
• Other background information such as codes, standards etc.
The complete request for deviation shall include all the required elements listed above in a concise narrative package with supporting data which clearly communicate what the deviation is, why the deviation is being requested, and the operational, maintenance, energy, cost, and schedule impacts of accepting the deviation and of rejecting the deviation.
1.2 ENERGY CONSERVATION
Refer to the VA Sustainable Design Manual, May 6, 2014 or approved latest edition available at the time design NTP is issued.
1.2.1 ENERGY REDUCTION REQUIREMENT - NEW CONSTRUCTION
All new buildings and/or additions to existing buildings entering design on or after April 7, 2023, must be designed to meet the minimum requirements of ASHRAE 90.1-2019. In addition, if lifecycle cost-effective, reduce site energy use by 30 percent compared to the baseline building performance rating per ASHRAE 90.1-2019, Appendix G. If a lifecycle cost effective design cannot be achieved that meets the 30 percent reduction requirements, select the most efficient design that meets or exceeds the minimum requirements and is lifecycle cost-effective.
1.2.2 ENERGY REDUCTION REQUIREMENT - MAJOR RENOVATIONS
Comply with requirement to achieve LEED Silver certification contained in CFM Policy Memo 003C-2021-21 (Green Building Certification Requirement) and Standards Alert 018 (Green Building Certification Standard Update).
Meet the minimum requirements of LEED v4.1 Energy and Atmosphere prerequisite “Minimum Energy Performance.” In addition, achieve a minimum of five points (20% better than ASHRAE 90.1-2016) under LEED v4.1 Energy and Atmosphere Credit “Optimize Energy Performance,” if lifecycle cost-effective. If five points cannot be achieved in a LCC-effective manner, design to achieve the highest number of points that are LCC-effective.
1.2.3 LIFE-CYCLE COST ANALYSIS – METHODOLOGY
An engineering and economic analysis shall be performed in accordance with the procedure outlined by the DOE in the National Institute of Standards and Technology (NIST) Handbook 135 dated February 1996 (or the approved latest edition) – Life-Cycle Costing Manual for the Federal Energy Management Program. The available resources are:
NIST Handbook 135 – Life-Cycle Costing Manual for the Federal Energy Management Program
Located in: http://fire.nist.gov/bfrlpubs/build96/PDF/b96121.pdf
Energy Price Indices and Discount Factors for Life-Cycle Cost Analysis – 2016 (current year) – Annual Supplement to NIST Handbook 135
Located in: http://nvlpubs.nist.gov/nistpubs/ir/2016/NIST.IR.85-3273-31.pdf http://fire.nist.gov/bfrlpubs/build96/PDF/b96121.pdf http://nvlpubs.nist.gov/nistpubs/ir/2016/NIST.IR.85-3273-31.pdf
BASIC REQUIREMENTS 1-4
NIST Building Life Cycle Cost (BLCC) Programs (current version and year)
Located in: https://energy.gov/eere/femp/building-life-cycle-cost-programs
1.2.4 VA POLICY
Reduction in the energy budget shall be expressed in Btu/sf (gross) [kWh/sm (gross)]. Follow the requirements in the approved latest edition of the VA Sustainable Design Manual.
1.3 MEASUREMENT AND VERIFICATION
Per DOE Guidelines issued under Section 103 of EPACT, install building-level utility meters in new major construction and renovation projects to track and continuously optimize performance. Memorandum of Understanding (MOU) mandates that the actual performance data from the first year of operation shall be compared with the energy design target. After one year of occupancy, the A/E shall measure all new major installations using the ENERGY STAR® Benchmarking Tool for building and space types covered by ENERGY STAR® or FEMP-designated equipment. The A/E shall submit a report of findings to the VA Authority identified in paragraph 1.1.
1.4 ABBREVIATIONS AND REFERENCES
See Chapter 7: CLIMATIC DATA for weather design conditions to be used for calculations.
See Chapter 8: ABBREVIATIONS AND REFERENCES for abbreviations and references used in this manual.
1.5 COMMISSIONING
In accordance with the Guiding Principles for Sustainable Federal Buildings (Feb 2016), employ commissioning practices tailored to the size and complexity of the building and its system components in order to verify performance of building components and systems and help ensure that design requirements have been meet.
Comply with VA’s Whole Building Commissioning Process Manual May 2013, Revised November 2013.
1.6 VA STANDARDS
At the beginning of every design project the A/E shall download from the VA Technical Information Library (TIL) all technical documents pertinent to the scope of the project being completed and shall use those documents and the documents referenced therein as references for the completion of the project.