This is an Exhibit B Prime/Subcontractor Form for Volusia County, Florida's Invitation to Bid (ITB) No. 26-B-39IF for the reconstruction of the Florida Shores Boulevard Vehicular Beach Access Ramp project (Contract No. C-2068). The form requires all bidders to identify and list every proposed subcontractor that will perform work on the project, including the company name, complete address, dollar value of work, and percentage of work to be performed. Anticipated subcontractor disciplines required for the project include demolition, excavation and grading, concrete sheet pile installation, concrete placement, pavement markings and paint, signage, site restoration and landscaping, testing, and surveying. The non-mandatory pre-bid meeting is scheduled for March 16, 2026, at 10:30 a.m., with a deadline for submitting questions on March 26, 2026, at 11:59 p.m., and sealed bids due April 9, 2026, at 3:00 p.m. The total estimated project cost is $2,041,339, with award anticipated in May 2026.

Failure to complete and return the Prime/Subcontractor Form may result in a bid being deemed non-responsive. Bidders must ensure all subcontractors hold appropriate Florida licenses, and any changes to subcontractors during project execution require prior written approval from the County Project Manager. The form allocates work percentages between the prime contractor and all subcontractors, with the total bid price to match the amount listed on the Bid Price Sheet. The County reserves the right to seek clarification regarding subcontractors but will not permit changes to the total submitted base bid pricing. This form is also utilized to determine local preference in accordance with the solicitation's local bid preference provisions. The project is FEMA-funded and requires compliance with federal contract provisions including Davis-Bacon Act prevailing wage requirements and various federal compliance standards.

View the file

Other files

File Type Posted
Florida_Shores_Boulevard_Vehicular_Beach_Access_Ramp_(Addendum_#3_Revision).pdf PDF
Exhibit_D_-_Construction_Plans_26-B-39IF_-_REVISED_04.07.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-39IF_-_REVISION_1_-_REPLACES_ALL_PREVIOUS_VERSIONS_-_USE_THIS_FORM_ONLY.xlsx XLSX spreadsheet
Exhibit_E_-_Technical_Specifications_26-B-39IF_-_REVISED_03.23.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS.docx DOCX document
Florida_Shores_Boulevard_Vehicular_Beach_Access_Ramp_(Addendum_#1_Revision).pdf PDF
Exhibit_B_-_Prime_SubContractor_Form_26-B-39IF.xls XLS spreadsheet
Exhibit_G_-_Bid_Price_Sheet_26-B-39IF.xlsx XLSX spreadsheet
Exhibit_L_-_Installation_Floater_Affidavit_26-B-39IF.docx DOCX document
Exhibit_K_-_Federal_Contract_Provisions_26-B-39IF.pdf PDF
Exhibit_J_-_Survey_26-B-39IF.pdf PDF
Exhibit_I_-_Geotechnical_Data_26-B-39IF.pdf PDF
Exhibit_H_-_FDEP_Permit_26-B-39IF.pdf PDF
Exhibit_F_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_E_-_Technical_Specifications_26-B-39IF.pdf PDF
Exhibit_D_-_Construction_Plans_26-B-39IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-39IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-39IF.pdf PDF
FLORIDA_SHORES.pdf PDF
FDEP_Permit_VO002371_AR_FO_SECURED.pdf PDF
Tech_Specs_2025-05-19_Final_Design_-_Tech_Specs_-_Florida_Shores.pdf PDF
Survey_240601_LB.pdf PDF
Geotech_G23215_Report_of_Geotechnical_Data_DSS_07-30-24.pdf PDF
2025-05-19_Bid_Schedule.xlsx XLSX spreadsheet
PRIME-SUB_FORM_Florida_Shores_Vehicular_Beach_Ramp.xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2068ITB No. 26-B-39IF
EXHIBIT B - PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Attachment G - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Demolition$ - 00.00%
Excavation, Grading & Compaction$ - 00.00%
Concrete Sheet Pile Installation$ - 00.00%
Concrete Placement$ - 00.00%
Pavement Markings and Pain$ - 00.00%
Signage$ - 00.00%
Site Restoration/Landscaping$ - 00.00%
Testing$ - 00.00%
Surveying$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%