Exhibit_E_-_Technical_Specifications_26-B-39IF_-_REVISED_03.23.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS.docx

DOCX document 44 KB Posted

Attached to
Florida Shores Boulevard Vehicular Beach Access Ramp
Solicitation number
26-B-39IF
Issued by
Volusia County, Florida

About this file

Technical Specifications Summary: Florida Shores Boulevard Vehicular Beach Access Ramp

This document is the Technical Specifications exhibit for Invitation to Bid No. 26-B-39IF issued by Volusia County, Florida, in partnership with the State of Florida Department of Environmental Protection, for the reconstruction of the Florida Shores Boulevard Vehicular Beach Access Ramp in Daytona Beach. The project encompasses the removal of the existing storm-damaged vehicular beach access ramp and construction of a new concrete vehicular ramp, concrete sidewalk, concrete sheet pile seawall, and gravity retaining wall with ancillary site improvements located within the Florida Shores Boulevard Right-of-Way. The project consists of 17 bid items including mobilization/demobilization, demolition, excavation and grading, sand fill, sheet-pile seawall, gravity wall, reinforced concrete ramp, heavy-duty concrete, curbing, sidewalk, aluminum guardrail and gate, landscaping, pavement markings and signage, as-built survey, site restoration, bond, and flood insurance. The pre-bid meeting is scheduled for March 16, 2026, at 10:30 a.m., with the question submission deadline of March 26, 2026, at 11:59 p.m., and sealed bids due April 9, 2026, at 3:00 p.m. The project requires substantial completion within 120 days and final completion within 150 days from the Notice to Proceed, with award anticipated in May 2026.

The specifications establish comprehensive technical requirements for concrete quality, reinforcement materials, construction sequencing, and environmental compliance. Concrete specifications vary by application, including FDOT Type II, Class IV for seawall caps (5,500 psi), FDOT Class V for pre-stressed piles, FDOT Type II, Class II for ramps and gravity walls (4,500 psi), and FDOT Type II, Class I for sidewalks (3,000 psi), all with maximum chloride content of 0.40 lbs/cubic yard. Reinforcement shall be fiberglass (Tuf-Bar or equivalent) for concrete caps and ramps, with steel reinforcement for gravity walls complying with FDOT Specifications Index 400. The contractor must comply with all applicable permits including those from Volusia County, Florida Department of Environmental Protection, and the Volusia County Incidental Take Permit for Threatened and Endangered Sea Turtles, with responsibility for all costs resulting from permit violations. The contractor must provide pre-construction staking accepted by the engineer, conduct a pre-construction meeting to establish construction access and staging areas, provide notification at least three days prior to major construction events, and submit certified as-built drawings upon completion. All concrete testing must comply with ASTM standards, with cylinder sampling at one set of four cylinders per 50 cubic yards or fraction thereof per day's placement per mix design.

View the file

Other files

File Type Posted
Florida_Shores_Boulevard_Vehicular_Beach_Access_Ramp_(Addendum_#3_Revision).pdf PDF
Exhibit_D_-_Construction_Plans_26-B-39IF_-_REVISED_04.07.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-39IF_-_REVISION_1_-_REPLACES_ALL_PREVIOUS_VERSIONS_-_USE_THIS_FORM_ONLY.xlsx XLSX spreadsheet
Florida_Shores_Boulevard_Vehicular_Beach_Access_Ramp_(Addendum_#1_Revision).pdf PDF
Exhibit_B_-_Prime_SubContractor_Form_26-B-39IF.xls XLS spreadsheet
Exhibit_G_-_Bid_Price_Sheet_26-B-39IF.xlsx XLSX spreadsheet
Exhibit_L_-_Installation_Floater_Affidavit_26-B-39IF.docx DOCX document
Exhibit_K_-_Federal_Contract_Provisions_26-B-39IF.pdf PDF
Exhibit_J_-_Survey_26-B-39IF.pdf PDF
Exhibit_I_-_Geotechnical_Data_26-B-39IF.pdf PDF
Exhibit_H_-_FDEP_Permit_26-B-39IF.pdf PDF
Exhibit_F_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_E_-_Technical_Specifications_26-B-39IF.pdf PDF
Exhibit_D_-_Construction_Plans_26-B-39IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-39IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-39IF.pdf PDF
FLORIDA_SHORES.pdf PDF
FDEP_Permit_VO002371_AR_FO_SECURED.pdf PDF
Tech_Specs_2025-05-19_Final_Design_-_Tech_Specs_-_Florida_Shores.pdf PDF
Survey_240601_LB.pdf PDF
Geotech_G23215_Report_of_Geotechnical_Data_DSS_07-30-24.pdf PDF
2025-05-19_Bid_Schedule.xlsx XLSX spreadsheet
PRIME-SUB_FORM_Florida_Shores_Vehicular_Beach_Ramp.xls XLS spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Shores Boulevard Vehicular Beach Access Technical Specifications Technical Specifications

1. General: These Technical Specifications provide details of the proposed construction (work) as shown on the Drawings titled “Florida Shores Boulevard Vehicular Beach Access Ramp for County of Volusia, Florida” (COUNTY) by Coastal Technology Corporation (ENGINEER) dated 5/19/2025. The work (Project) consists of furnishing all labor, equipment, and materials as required for:

a) removal of the existing storm damaged vehicular beach access ramp including associated buried and exposed debris, and

b) construction of a new concrete vehicular beach access ramp and concrete sidewalk – fronted by a concrete sheet pile seawall and gravity retaining wall – with other ancillary site improvements as shown on the Drawings.

The Project Site is primarily within Florida Shores Boulevard Right-of-Way in the City of Daytona Beach (City).

2. Permit Compliance: The CONTRACTOR shall abide by all notes and conditions indicated on the Drawings and all permits associated with the work including permits from the COUNTY, Florida Department of Environmental Protection (FDEP), the Volusia County Incidental Take Permit and Habitat Conservation Plan for Threatened and Endangered Sea Turtles, and other permits required by the COUNTY. If the CONTRACTOR violates any condition of the permits and work is stopped by the State of Florida or other public entity, then any additional costs incurred by the CONTRACTOR in association with stoppage of the work shall be paid by the CONTRACTOR and not charged to the COUNTY. The CONTRACTOR shall obtain a COUNTY building permit.

3. Pre-Construction Meeting: Prior to commencement of construction, the CONTRACTOR shall meet on site with the ENGINEER to establish the construction access, staging areas, and pre-construction conditions of the site. The ENGINEER shall check construction staking (by CONTRACTOR) at this meeting.

4. Staking: Prior to initiation of construction, staking of the proposed construction is to be performed by the CONTRACTOR by methods subject to acceptance by the ENGINEER. Upland survey control is reflected in the site survey drawing by Sliger & Associates, INC 06/28/2024 (Appendix 1). The CONTRACTOR shall stake the configuration of the proposed improvements including the seawall and gravity wall.

5. Avoidance of Protected Species and Benthic Resources: The CONTRACTOR shall avoid impacts to any state or federally designated threatened or endangered species including sea turtles, manatees, sawfish, and shorebirds during construction activities. In addition, the CONTRACTOR shall perform the work so as to avoid adverse impacts to ocean waters and associated resources including beach and dune system, or other benthic resources. If any adverse water resource-related impact occurs as a result of construction activities, the CONTRACTOR shall immediately notify the ENGINEER and COUNTY.

6. Impacts to Cultural and Historic Resources: If prehistoric or historic artifacts are encountered at any time within the Project site, all activities involving subsurface disturbance in the vicinity of the artifacts shall cease. The CONTRACTOR shall contact the COUNTY, the ENGINEER, and the Florida Department of State, Division of Historical Resources, Compliance Review Section (DHR), at (850) 245-6333, as well as the appropriate permitting agency office. Project activities shall not resume without verbal or written authorization from the Division of Historical Resources. If unmarked human remains are encountered, all work shall stop immediately and the proper authorities notified in accordance with Section 872.05, F.S.

7. Inspection Notification: The CONTRACTOR will notify the ENGINEER as to the time and date of the following events at least three (3) days prior to the event:

(a) Mobilization onto the site.

(b) Preparation of the CONTRACTOR's access and staging areas.

(c) Demolition and Removal of Debris

(d) Seawall Construction

i. placement of sheet piles,

ii. completion of forms and steel placement for concrete cap,

iii. installation of Helical Soil Anchors

iv. pour of concrete cap,

v. removal of forms,

vi. placement and compaction of the seawall backfill.

(e) Gravity Wall Construction

i. excavation and compaction of subgrade,

ii. completion of forms and steel placement,

iii. concrete pour,

iv. removal of forms.

(f) Ramp, Curb, and Sidewalk Construction:

i. excavation and compaction of subgrade,

ii. completion of forms and reinforcement placement,

iii. concrete pour,

iv. removal of forms.

(g) Ancillary Improvements

i. Landscaping

ii. Pavement Markings & Signage

(h) Site restoration

(i) Demobilization Failure to comply may be taken as cause for rejection of work completed.

8. Construction Access: The CONTRACTOR may obtain access to the site via Florida Shores Boulevard or otherwise via the beach as may be allowed by the permits and may be accepted by the ENGINEER at the pre-construction meeting. The CONTRACTOR may store materials and equipment on the site (within staging area within Florida Shores Boulevard Right-of-Way) as identified by the CONTRACTOR and accepted by the ENGINEER at the pre-construction meeting. The CONTRACTOR will (a) place temporary barricades and/or fencing surrounding the staging area and area of construction, and (b) control these areas with signage and the CONTRACTOR’s personnel to restrict public access to these areas. Upon completion of construction, the CONTRACT will remove the barricades, fencing, and signage.

The CONTRACTOR shall be permitted to exclude the public for safety purposes from the work area in the immediate vicinity of the CONTRACTOR’s operations. The CONTRACTOR will minimize the areas closed to the public. The CONTRACTOR shall provide and maintain barricades, warning signals, and a flag person as required by local, State or Federal regulations to ensure public safety - as accepted by the ENGINEER. If the CONTRACTOR is not able to keep and maintain the public at a safe distance from construction activity, the CONTRACTOR is to notify the ENGINEER and COUNTY and request assistance in controlling public access to the active construction site including within the staging area.

9. Standard Specifications: Construction shall be consistent with Florida Department of Transportation “Standard Specifications for Road and Bridge Construction FY 2025-26” (FDOT Specifications) unless specified otherwise in these Technical Specifications.

10. Concrete: Concrete for the:

· Seawall cap shall be FDOT Type II, Class IV for Extremely Aggressive Environments with a minimum 28-day compressive strength (fC’) of 5,500 psi. Concrete shall have a maximum water/cement ratio of 0.44 lbs/lbs and a minimum total cement content of 600 lbs/cubic yard of concrete.

· Pre-stressed piles, and pre-cast corner piles, shall be FDOT Class V with Highly Reactive Pozzolans for Extremely Aggressive Environments. Concrete shall have a maximum water/cement ratio of 0.37 lbs/lbs and a minimum total cement content of 600 lbs/cubic yard of concrete.

· Ramp, Heavy Duty Concrete, and Gravity wall shall be FDOT Type II, Class II (Bridge Deck) for Extremely Aggressive Environments with a minimum 28-day compressive strength (fC’) of 4,500 psi. Concrete shall have a maximum water/cement ratio of 0.44 lbs/lbs and a minimum total cement content of 600 lbs/cubic yard of concrete.

· Sidewalk shall be FDOT Type II, Class I with a minimum 28-day compressive strength (fC’) of 3,000 psi. Concrete shall have a maximum water/cement ratio of 0.50 lbs/lbs and a minimum total cement content of 470 lbs/cubic yard of concrete. Concrete shall include fiber reinforcement in the form of Fibermesh 300®fibers at a minimum of 1.5 lbs/yd3 kg/m3) of concrete – mixed and installed per the manufacturer’s recommendations All concrete shall have a maximum chloride content of 0.40 lbs/cubic yard of concrete. Concrete materials, placement, finishing, and curing must confirm to requirements of Sections 346 of FDOT Specifications. The CONTRACTOR shall provide and place visqueen against the grade prior to a concrete pour against grade. The CONTRACTOR shall employ a vibrator as necessary to ensure filling of the forms with concrete – subject to acceptance by the ENGINEER.

The CONTRACTOR shall provide concrete cylinder tests for each concrete pour - as required by Section 346 of FDOT Specs and as accepted by the ENGINEER. The CONTRACTOR shall provide one set of four cylinders for each 50 cubic yards, or fraction thereof, for each day’s placement of each mix design. Samples shall be in accordance with ASTM C172, processing and curing in accordance with ASTM C31, and testing in accordance with ASTM C39. One cylinder shall be tested at three days or seven days, as required by job conditions, and two cylinders shall be tested for one valid test at 28 days. The fourth cylinder is to be cured and held for testing at 42-days, if 28-day test indicates deficient results, or as a spare in case of cylinder damage.

11. Reinforcement: All reinforcing of the proposed concrete cap, and ramp shall be fiberglass as manufactured by Tuf-Bar or near equivalent as accepted by the ENGINEER and COUNTY. All reinforcing of the proposed gravity walls shall be steel consistent with FDOT Specifications and Index 400. All reinforcing shall have a minimum cover of 3". All reinforcing shall be placed according to ACI and Florida Building Codes. No laps in reinforcing shall be allowed in pre-cast or pre-stressed members.

12. Payment: The COUNTY shall make payment to the CONTRACTOR for all materials and labor according to the unit prices and lump sum prices indicated on the Bid Schedule. The CONTRACTOR shall submit copies of yard and weight tickets for all materials with his Payment Request for unit price based bid items. The COUNTY shall make final payment for each phase of the work upon completion of the work by the CONTRACTOR and acceptance of the work by the ENGINEER and the COUNTY. The CONTRACTOR shall provide all materials, labor and equipment needed to perform the work required by these specifications for each Bid Item (as described below), with no additional cost to be incurred by the COUNTY.

13. Bid Items: The following describes Bid Items for the work:

13.1 Mobilization/Demobilization: Mobilization/demobilization consists of the preparatory work, operations, and mobilizing for beginning the work and demobilizing after completion of the work, including, but no limited to, those operations necessary for the movement of personnel, equipment, supplies, materials, and incidentals to and from the Project site, and for the establishment of safety equipment and first aid supplies, sanitary and other facilities as required by these specifications, and state and local laws and regulations. CONTRACTOR to preserve existing asphalt within the Florida Shores Boulevard right of way, any damaged asphalt shall be replaced under Bid Item 15. All costs connected with the one (1) time mobilization and demobilization of all the CONTRACTOR’S employees and equipment and all costs connected to obtainment of a performance bond for the work are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 1.

The CONTRACTOR is to (a) determine if underground or overhead utilities exist at all work locations, and (b) propose adjustments to work locations as needed to avoid any damage to existing utilities. The CONTRACTOR must contact Sunshine Utilities (1-800-432-4770) prior to the commencement of construction.

All other costs associated with performance of the work (including bonding and insurance requirements, erosion and sediment control, maintenance of traffic, additional signage) and not addressed in other bid items – shall be included in the CONTRACTOR’s proposal for Bid Item 1. All costs connected with mobilization/demobilization are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 1. The CONTRACTOR shall be eligible for payment for up to 60% of mobilization/demobilization after the installation of one sheet pile as accepted by the ENGINEER and COUNTY.

13.2 Demolition [Reference FDOT Specifications – Section 110] All costs connected with removal and disposal (or salvage) of existing structures are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 2. As needed for construction of these improvements, the CONTRACTOR shall remove and dispose of the existing ramp, roadway, palm tree, and other debris (except beach-compatible sand) – unless otherwise accepted in writing by the COUNTY and ENGINEER. The CONTRACTOR shall separate the debris from the beach-compatible sand through: (a) manual labor, and/or (b) screening of removed materials. The remaining beach compatible fill will be used by the CONTRACTOR to restore natural grades on the beach (see Section 13.3 of these Specifications).

13.3 Excavation, Grading, and Compaction: The lump sum bid price for this item shall include, but not be limited to the required manpower, equipment, materials, and other items necessary, including any possible dewatering techniques, permitting for dewatering, and all applicable safety measures, for excavation, grading and compaction as indicated on the Drawings, technical reports, and specifications. Items to be included in the cost of this item include, but are not limited to; excavation of overburden material required to construct the ramp; grading and other earthwork activities required to achieve design pavement grades, running slopes and cross slopes; design elevations, cross slopes and running slopes for all sidewalk, and other fine and finish grading around structures that is required to finish the Project as shown on the Drawings.

The CONTRACTOR shall place and grade sand fill to meet the lines and grades shown on the Drawings unless as may otherwise be accepted by the ENGINEER via a Change Order or Field Directive. Unless otherwise accepted by the ENGINEER, finished grades must be within a vertical tolerance of 0.1 foot above or below the proposed finished grade elevation shown on the Drawings.

Upon completion of all filling operations, the site shall be graded and dressed so as to eliminate any pockets, ridges, and depressions in the finished grades. The CONTRACTOR shall place the fill in one foot lifts compacted to 95% density (per Section 120 of FDOT Specifications) subject to acceptance by the ENGINEER. This item shall also include all professional geotechnical proctor testing and compaction testing as required by Section 120 of FDOT Specifications. Compaction tests will be required per each lift of placed fill or backfill, under all structures as indicated on the Drawings.

All costs connected with excavation, grading, and compaction are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 3.

13.4 Sand Fill: The CONTRACTOR shall provide and place clean sand fill material obtained from a source landward of the CCCL – to supplement existing beach-compatible sand as may be excavated by the CONTRACTOR to construct the new ramp - as may be needed to (a) backfill the seawall and gravity wall, and (b) create the finished grades as shown on the Drawings. The sand within the trucks shall not contain more than 5% moisture, generally be free of excess water, and subject to the acceptance of the ENGINEER and COUNTY. The trucks shall be weighed (a) empty – immediately before filling for each truck load, and (b) again after being loaded with sand fill for each truck load to determine the net weight of sand fill. Trucks shall be weighed in a location that is easily accessible and will cause no delay in the transport of the fill to the Project site. The scales used for weighing the trucks shall be certified by the Florida Department of Agriculture & Customer Services. The CONTRACTOR shall provide a “weight ticket” for each truckload citing the net weight of material in the truck, the date of delivery, and the project name, these tickets will document the delivered fill quantity eligible for payment. The CONTRACTOR will provide to the COUNTY and ENGINEER a daily log including (1) a summary table of all truckloads of sand delivered to the site during the prior day including the net weight and the location of delivery for each truckload, and (2) the total tonnage of sand delivered through the prior day. With the CONTRACTOR’s requests for payment under this Bid Item, the CONTRACTOR shall provide the COUNTY with copies of all certified weight tickets, which shall serve as the basis of payment for Sand Fill. All costs connected with providing clean beach compatible sand fill are to be included in the per ton price indicated on the CONTRACTOR’s bid proposal for Bid Item 4.

13.5 Sheet-Pile Seawall: The CONTRACTOR shall construct the concrete sheet-pile seawall as shown on the Drawings. Appendix 2 is a “Report of Geotechnical Data” by Bechtol Engineering and Testing, Inc. dated July 30, 2024, which indicates sub-surface conditions. All costs for providing and installing the seawall – including sheet-piles, concrete cap, filter fabric, helical anchors, and testing, as shown on the Drawings are to be included in the lump sumunit price indicated on the CONTRACTOR’s bid proposal for Bid Item 5.

13.6 Gravity Wall: The CONTRACTOR shall provide all materials, labor, and equipment to construct the Gravity Walls per FDOT Index 6011 and associated FDOT Specifications as identified on the Drawings. All costs connected with the gravity wall are to be included in the lump sumunit price indicated on the CONTRACTOR’s bid proposal for Bid Item 6.

13.7 Reinforced Concrete Ramp: The CONTRACTOR shall provide all materials, labor, and equipment to construct the new Reinforced Concrete Ramp per FDOT Specifications Section 346 except as may be otherwise (a) shown on the Drawings, and/or (b) identified in these Specifications. Concrete reinforcing shall be Glass Fiber Reinforced Polymer (GFRP) reinforcing bars meeting FDOT Specifications Section 932. The Ramp shall include the filter fabric, gravel stone (#57 stone), and compacted subbase as shown on the Drawings. All costs connected with the reinforced concrete ramp are to be included in the lump sumunit price indicated on the CONTRACTOR’s bid proposal for Bid Item 7.

13.8 Heavy Duty Concrete: The CONTRACTOR shall provide all testing, materials, labor and equipment to install the Heavy Duty Concrete as shown on the drawings. The CONTRACTOR shall install concrete pavement joints consistent with Section 350 of FDOT Specifications as shown on the Drawings. Contraction joints shall include fourteen (14) inch long, 1” diameter fiberglass dowel bar spaced at 12” on center. The subgrade shall be stabilized with 4-6 inches of aggregate base material or limerock, meeting the requirements of FDOT Standard Specification Section 290, mixed into the upper one foot of subgrade as needed to achieve a minimum Limerock Bearing Ratio (LBR) of 40. Stabilized subgrade shall be compacted to a minimum of 98% maximum density as determined by ASTM D-1557 (Modified Proctor Test). The CONTRACTOR shall maintain the required density and compaction of the subgrade and base course until the subsequent base or pavement is placed. The base course shall consist of 6-inch graded aggregate base (GAB) meeting the requirements of FDOT Standard Specification 204. Base material shall achieve a minimum LBR value of 100 and be compacted to a minimum of 100% maximum density as determined by the Modified Proctor Test. All costs connected with the Heavy Duty Concrete are to be included in the lump sum unit price indicated on the CONTRACTOR’s bid proposal for Bid Item 8.

13.9 FDOT Type “D” Curb: The CONTRACTOR shall provide all materials, labor, and equipment to install FDOT type “D” Curb as shown on the Drawings and as consistent with FDOT Specification Section 520. The FDOT Type “D” Curb shall be a monolithic pour with the ramp and sidewalk or a separate pour with the sidewalk to include a 1.5”x3.5”x6’ shear key every 5 ft on center. All costs connected with the concrete curb are to be included in the per linear foot prices indicated on the CONTRACTOR’s bid proposal for Bid Item 9.

13.10 Sidewalk: The CONTRACTOR shall provide all materials, labor and equipment to install 6” thick sidewalk as shown on the drawings and as consistent with FDOT Specification Section 522. The sidewalk shall be a monolithic pour with the ramp or a separate pour with 1.5”x3.5”x6’ shear key every 5 ft on center. All costs connected with the concrete sidewalk are to be included in the per square yard price indicated on the CONTRACTOR’s bid proposal for Bid Item 10.

13.11 FDOT Aluminum Guardrail and Gate: Under Bid Item 11, the CONTRACTOR shall furnish and construct an Aluminum Guardrail and 68” double swing arm gate (total opening to be 68”) consistent with FDOT Specification Section 515, Type 1 infill, maintaining the 4” sphere requirement from grade to a minimum of 42” above grade as required by the Florida Building Code. The guardrail posts shall be set in 3,000 PSI concrete two foot diameter three feet below grade shall and fastened to the gravity wall and seawall cap using FDOT Case IV. The pay quantity for Guardrail under Bid Item 11 will be the number of linear feet of guardrail and gate, measured along the centerline of the guardrail and gate, actually constructed and accepted by the COUNTY and ENGINEER. Prior to fabrication, the CONTRACTOR shall provide shop drawings for acceptance by the COUNTY and ENGINEER. Payment shall be full compensation for all work and materials specified in construction of metal guardrail, including posts, fasteners, and any required bending of the guardrail panels, and any other materials or work incidental to the construction of the guardrail. Guardrail shall be 6061T grade aluminum and be consistent with FDOT Standard Index 515. All costs connected with materials, labor, equipment, and installation, of the proposed guardrail and gate are to be included in the unit price indicated on the CONTRACTOR’s bid proposal for Bid Item 11.

13.12 Landscaping: All costs connected with materials, labor, equipment, installation, and temporary irrigation of the proposed sea oats and palm trees are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 112.

13.13 Pavement markings and signage: Following the construction of the vehicular ramp, the CONTRACTOR shall apply new thermoplastic FDOT Durable Paint pavement markings in accordance with the FDOT Specification 710 Painted Pavement Markings, and 971 Pavement Marking Materials, 711 Thermoplastic Traffic Stripes and Markings and as shown on the Drawings.

The CONTRACTOR shall notify the ENGINEER prior to placement of the materials and submit shop drawingsa certification to the ENGINEER and COUNTY for acceptance with the APL number and the batch or Lot numbers of the thermoplastic to be used.

The CONTRACTOR shall not allow traffic onto or permit vehicles to cross newly applied pavement markings until they are sufficiently dry. The CONTRACTOR shall remove and replace any portion of the pavement markings damaged by passing traffic or from any other cause at no additional cost to the COUNTY. Pavement markings are subject to a 180 day observation period under normal traffic. The observation period shall begin with the satisfactory completion and acceptance of the work. Pavement markings shall show no signs of failure due to blistering, excessive cracking, chipping, discoloration, poor adhesion to the pavement, loss of retroreflectivity, or vehicular damage. The COUNTY reserves the right to check the retroreflectivity any time prior to the end of the observation period. The CONTRACTOR shall replace any pavement markings that do not perform satisfactorily under traffic during the 180 day observation period at no additional cost to the COUNTY. All costs connected with the pavement markings and signage are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 123.

13.14 As-Built Survey: CONTRACTOR shall provide a final “as-built” Drawings certified by a Professional Land Surveyor licensed in the State of Florida in AutoCAD and PDF format. The “as-built” Drawings shall include field measurements, after construction, of actual as-constructed features and their surroundings, locations, and dimensions, and elevations with information noted on copies of the contract Drawings. All costs connected with the as-built survey are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 134.

13.15 Site Restoration: The CONTRACTOR shall restore the site to a pre-construction condition or better, including asphalt within the Florida Shores Boulevard Right of Way – subject to acceptance by the COUNTY and Engineer. The CONTRACTOR shall also restore all pavement, sidewalks, landscaping, and other areas disturbed by the CONTRACTOR as a result of construction activities. All costs connected with the site restoration are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 145.

13.16 Bond: The CONTRACTOR shall provide bond(s) as required by the COUNTY. All costs connected to obtainment of a performance bond for the work are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 156.

13.17 Flood Insurance: The CONTRACTOR shall provide Flood Insurance as required by the COUNTY. All costs connected to obtainment of Flood insurance for the work are to be included in the lump sum price indicated on the CONTRACTOR’s bid proposal for Bid Item 167.

Technical Specifications Revised - March 23, 2026

File details come from the government source that posted it. Updated .