Exhibit B - FPS R5 Cleveland Furniture - Fixtures and Equipment - FFandE.pdf

PDF 190 KB Posted

Attached to
US Government seeks to Lease Office Space in Cleveland, Ohio
Solicitation number
5OH0350
Issued by

About this file

This is a Statement of Work (SOW) for the procurement, delivery, and installation of Furniture, Fixtures, and Equipment (FF&E) to support the DHS/Federal Protective Service (FPS) Cleveland Area Command at the A.J. Celebrezze Federal Building in Cleveland, Ohio.

The scope encompasses a complete FF&E solution for administrative, operational, and mission-support spaces, including nine personnel workstations (36 SF cubicles each) with height-adjustable desks, ergonomic task chairs with specified dimensions (25"+ girth, 300+ lbs weight capacity, 24"+ back support height), dual monitor arms, task lighting, and integrated power/data raceways. Additional requirements include supervisory workstation enhancements with guest chairs and lateral file cabinets; specialized storage solutions for evidence, weapons, ammunition, tactical equipment, and K-9 operations; secure file and evidence rooms with GSA-approved containers and high-density shelving; an explosive bunker with blast-rated and fire-resistant cabinets; conference room furniture accommodating 6-8 seats with AV capabilities for a 65" display; break area furnishings including a refrigerator with filtered water line and microwave; and IT LAN/IDF room equipment including server racks, cable management hardware, and anti-static matting. All FF&E must be new, commercial-grade, and compliant with DHS, FPS, and GSA standards, including GSA PBS P100 Facilities Standards, ADA Accessibility Guidelines, and NFPA/OSHA requirements. The contractor is responsible for all procurement, delivery, assembly, installation, site restoration, warranty documentation, and operations & maintenance manuals. The government will provide the Program of Requirements, floor plans, access coordination, and security requirements. The period of performance includes procurement lead time, delivery, installation, and punch-list resolution, with final acceptance occurring after completion of any punch-list items.

View the file

Other files

File Type Posted
5OH0350 FAQ (final).pdf PDF
5OH0350 RLP Amendment No. 2 (final).pdf PDF
5OH0350 RLP Amendment No. 1.pdf PDF
5OH0350 Cleveland L100 Draft DR_8_5_2026.pdf PDF
Exhibit I_GSAR Representation 552.270-33 (Jun. 2021) Revised Blue Text (Nov. 2024) Fillable.pdf PDF
Exhibit B_VBA_CFM - Physical Security and Resiliency Design Manual 2023.pdf PDF
5OH0350 Cleveland RLP Draft_DR_8-05-2026.pdf PDF
Exhibit B_FPS_Cleveland A J CELEBREZZE FB POR_Public Release.pdf PDF
Exhibit B_MasterProg-VBA_Cleveland_POR.pdf PDF
Exhibit B_FPS_General Scope of Work Cleveland OH Requirements.pdf PDF
Exhibit B_FPS_R5 Cleveland OH AC Mission Space Construction Requirements.pdf PDF
Exhibit E_3517B General Clauses (Apr. 2026).pdf PDF
Exhibit B - FPS R5 Cleveland Furniture - Fixtures and Equipment - FFandE.pdf PDF
Exhibit H_FPLS Prelease Evaluation Form 12000 (May 2015).pdf PDF
Exhibit B_VBA Design Guide - Space Program Criteria 2021.pdf PDF
Exhibit C_Security Requirements (FSL Level III) (Oct. 2024).pdf PDF
Exhibit B_FPS_Real Property Management Manual.pdf PDF
Exhibit J RLP - Broker Project (May 2026).pdf PDF
Exhibit B_VBA Design Guide - Technical Criteria 2021.pdf PDF
Exhibit D_3516 Solicitation Provisions (Mar. 2026).pdf PDF
Exhibit B_VBA Design Guide - Technical Criteria 2021.pdf PDF
Exhibit B_FPS_Real Property Management Manual.pdf PDF
Exhibit B_VBA_CFM - Physical Security and Resiliency Design Manual 2023.pdf PDF
Exhibit B_VBA Design Guide - Technical Criteria 2021 (1).pdf PDF
5OH0350 Cleveland L100 Draft DR_8_5_2026.pdf PDF
Exhibit B_FPS_R5 Cleveland OH AC Mission Space Construction Requirements.pdf PDF
Exhibit E_3517B General Clauses (Apr. 2026).pdf PDF
Exhibit B_VBA Design Guide - Space Program Criteria 2021.pdf PDF
Exhibit J RLP - Broker Project (May 2026).pdf PDF
Exhibit B_MasterProg-VBA_Cleveland_POR.pdf PDF
5OH0350 Cleveland RLP Draft_DR_8-05-2026.pdf PDF
Exhibit H_FPLS Prelease Evaluation Form 12000 (May 2015).pdf PDF
Exhibit B_FPS_Cleveland A J CELEBREZZE FB POR_Public Release.pdf PDF
Exhibit B_FPS_General Scope of Work Cleveland OH Requirements.pdf PDF
Exhibit D_3516 Solicitation Provisions (Mar. 2026).pdf PDF
Exhibit I_GSAR Representation 552.270-33 (Jun. 2021) Revised Blue Text (Nov. 2024) Fillable.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Furniture, Fixtures, and Equipment (FF&E)

DHS/FPS – Cleveland Area Command (AC)

A.J. Celebrezze Federal Building – Cleveland, OH

1.0 Purpose

The purpose of this Statement of Work (SOW) is to procure, deliver, and install all Furniture, Fixtures, and Equipment (FF&E) required to support the DHS/Federal Protective Service (FPS) Cleveland Area Command (AC) in accordance with the approved Program of Requirements (POR). The Contractor shall provide all labor, materials, equipment, supervision, project management, and quality control necessary to furnish and install FF&E that meets DHS, FPS, and GSA standards.

2.0 Scope

The Contractor shall provide a complete FF&E solution for all administrative, operational, and mission-support spaces identified in the POR. This includes, but is not limited to:

• Personnel workstations (36 SF cubicles)

• Supervisory workstation enhancements

• Evidence, weapons, and secure storage solutions

• Tactical equipment storage

• K-9 storage and explosive bunker storage

• Conference room furniture

• Break area furnishings

• IT LAN/IDF room equipment racks and accessories

• Detainee processing fixtures

• General support furnishings and accessories

All FF&E shall be new, commercial-grade, compliant with federal standards, and suitable for a law-enforcement operational environment.

3.0 Applicable Documents

The Contractor shall comply with the following:

• DHS/FPS Program of Requirements (POR) – Cleveland AC

• GSA PBS P100 Facilities Standards

• GSA Federal Management Regulation (FMR)

• GSA Schedule 71/72 (if applicable)

• DHS Sustainability and Environmental Requirements

• ADA Accessibility Guidelines

• NFPA and OSHA requirements for applicable equipment

4.0 Requirements

4.1 General Requirements

The Contractor shall:

• Provide FF&E that meets or exceeds DHS/FPS durability, security, and ergonomic standards.

• Coordinate all measurements, field verifications, and installation logistics with GSA and FPS.

• Provide finish selections, product data sheets, and shop drawings for Government approval.

• Deliver, assemble, and install all FF&E in accordance with manufacturer specifications.

• Remove all packing materials and restore the site to clean condition.

• Provide warranties, maintenance instructions, and as-built documentation.

5.0 Room-Specific FF&E Requirements

5.1 Personnel Workstations (36 SF Cubicles)

Provide complete workstation packages for nine (9) positions, including:

• Modular cubicle system workstations (36 SF footprint)

• Height-adjustable (electronic)

• Ergonomic task chair (adjustable chairs offering girth 25”+, 300lbs + weight capacity, drop away arms, offer a back support in height of 24”+

• Locking mobile pedestal

• Overhead storage bin

• Dual Monitor arms

• Task lighting

• Integrated power/data raceway

• Cable management

Supervisor workstation shall include two guest chairs and one lateral file cabinet.

5.2 Storage & Mission Support Spaces

5.2.1 Bulk Storage – 120 SF

• Heavy-duty shelving (14 gauge steel) https://buzzseating.com/shield-law-enforcement-chair/ https://www.uline.com/Grp_597/Pallet-Racking?pricode=WB9961&utm_source=Bing&utm_medium=cpc&utm_term=%2Bindustrial%20%2Bracking&utm_campaign=Shelving%2C%20Bins%20and%20Storage&AdKeyword=industrial%20racking&AdMatchtype=p&ad_group_id=1250146060328967&msclkid=a8275db886ca176f19a2345110bb3302

• Lockable storage cabinets

• Equipment bins/totes

• Pallet-capable floor rack

5.2.2 Ammo/Weapons Storage – 100 SF

• Stackable GSA-approved class 5/6 weapons lockers

• GSA-approved class Ammunition storage cabinets

• Reinforced shelving

• Wall-mounted gear racks

• Class 5 Weapons Container

5.2.3 Secure File/Evidence Combo – 120 SF

• GSA security containers

• Evidence lockers

• Shelving for boxed evidence

• Lockable file cabinets

5.2.4 Tactical Equipment Storage – 160 SF

• 36”-48” TA-50 Tactical Gear Locker

• Lockable cage storage

• PPE storage solution

• Wall-mounted tactical panels

5.2.5 Evidence Room – 120 SF

• Evidence lockers

• High-density shelving

• Refrigerated evidence locker (if required)

• Pass-through evidence cabinet

5.2.6 Secure File Room – 120 SF

• GSA-approved file cabinets

• Lockable shelving

• Document storage racks

5.2.7 K-9 Storage – 75 SF

https://www.uline.com/Grp_597/Pallet-Racking?pricode=WB9961&utm_source=Bing&utm_medium=cpc&utm_term=%2Bindustrial%20%2Bracking&utm_campaign=Shelving%2C%20Bins%20and%20Storage&AdKeyword=industrial%20racking&AdMatchtype=p&ad_group_id=1250146060328967&msclkid=a8275db886ca176f19a2345110bb3302 https://www.uline.com/Grp_597/Pallet-Racking?pricode=WB9961&utm_source=Bing&utm_medium=cpc&utm_term=%2Bindustrial%20%2Bracking&utm_campaign=Shelving%2C%20Bins%20and%20Storage&AdKeyword=industrial%20racking&AdMatchtype=p&ad_group_id=1250146060328967&msclkid=a8275db886ca176f19a2345110bb3302 https://dascostorage.com/law-enforcement/weapons/ https://www.spacesaver.com/products/lockers/evidence-locker https://dascostorage.com/military/ta-50-storage-locker/ https://www.spacesaver.com/products/lockers/evidence-locker

• Ventilated storage cabinets

• K-9 equipment racks

• Odor-resistant bins

• Tie-down points (as required)

5.2.8 Explosive Bunker – 25 SF

• Blast-rated storage container

• Fire-resistant cabinet

• Safety signage

5.2.9 Canine Explosive Bunker Storage – 120 SF

• Explosive-rated storage units

• Ventilated cabinets

5.3 Shared & Common Spaces

5.3.1 Break Area – 72 SF

• Small table and chairs

• Refrigerator with a filtered water line for ice and water distribution

• Microwave shelf/cabinet

• Trash and recycling bins

5.3.2 Conference Room – 150 SF

• Conference table (6–8 seats)

• Ergonomic conference chairs

• Wall-mounted display & blocking for (1) 65” display

• AV credenza

• Whiteboard or digital board

5.3.3 IT LAN Closet (IDF) – 120 SF

• Server racks

• Wall-mounted equipment shelves

• Cable management hardware

• Anti-static mat

6.0 Deliverables

https://www.armagcorp.com/commercial-explosives-storage/indoor-magazines/?_gl=1*1nv0lgj*_up*MQ..*_ga*MTkyODg5NjEwNC4xNzc2OTE5NDQz*_ga_WJHG8M3DL8*czE3NzY5MTk0NDIkbzEkZzEkdDE3NzY5MTk1MjYkajM4JGwwJGgw

The Contractor shall provide:

1. Project Management Plan

2. Product Submittals & Finish Boards

3. Installation Schedule

4. As-Built FF&E Layouts

5. Warranty Documentation

6. O&M Manuals

7.0 Period of Performance

The period of performance shall be established at award and shall include:

• Procurement lead time

• Delivery

• Installation

• Punch-list resolution

8.0 Government Furnished Information (GFI)

The Government will provide:

• POR

• Floor plans

• Access coordination

• Security requirements

9.0 Security Requirements

Contractor personnel shall comply with:

• FPS and GSA access control procedures

• Background check requirements (if applicable)

• Escort requirements for uncleared personnel

10.0 Inspection & Acceptance

The Government will inspect all FF&E for:

• Compliance with specifications

• Proper installation

• Damage or defects

• Operational readiness

Final acceptance occurs after punch-list completion.

11.0 Warranty

All FF&E shall include manufacturer warranties. Contractor shall provide warranty service information and points of contact.

File details come from the government source that posted it. Updated .