Exhibit B - Bid Form.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
SKOV SUBSTATION TRANSFORMER PURCHASE: REQUEST FOR PROPOSAL
Solicitation number
S-R33123-00011021
Issued by
Wasco County, Oregon

About this file

This document is a Bid Form for a state and local contract opportunity issued by Northern Wasco County PUD in Oregon. The RFP is seeking proposals for the furnishing and installation of two 32/36/40 transformers at a location within the City limits of The Dalles, OR 97058. The Bid Form requires bidders to provide details on their company information, commercial terms, previous experience, manufacturing locations, technical specifications, shipping and testing requirements, and other details. The contract opportunity is open to all qualified bidders, and the selected transformer manufacturer must conform to the submittal and installation schedule outlined in the RFP.

The Bid Form specifies that the transformer units must meet various technical requirements, including guaranteed no-load and load losses, efficiency, impedance, short-circuit test data, and other performance metrics. Bidders must also provide details on subcontractors, warranties, and any special tools or spare parts. Pricing is to be provided per unit, with delivery and installation costs listed separately. The RFP does not mention any specific funding sources or set-asides, and there is no incumbent contractor identified.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Sheet 1: Bid FormFill out cells in yellow only
SectionFieldDescription/InstructionPricingDescriptionQTYUnitsUnit CostTotal
Bidder InformationCompany NameEnter the name of the bidding company.Transformer & Equipment2ea0
Contact PersonEnter the name of the contact person.Freight (DDP)1ls0
AddressEnter the company’s address.Installation Laborhr0
Phone NumberEnter the contact phone number.Testing/CX Supportls0
Email AddressEnter the contact email address.*Add rows as needed0
Commercial TermsDelivery TimeSpecify the delivery time in weeks or months.Total0
Warranty PeriodSpecify the warranty period in years.
Validity of the OfferEnter the validity period of the offer (e.g., 30 days).
Experience & ReferencesPrevious Experience 1Provide details of previous similar projects.
Previous Experience 2Provide details of previous similar projects.
Previous Experience 3Provide details of previous similar projects.
References 1List references or clients who have used similar transformers.
References 2List references or clients who have used similar transformers.
References 3List references or clients who have used similar transformers.
EIS RequirementsSubcontractor NamesNames of subcontractors who will perform field services and specific transformer tasks.
Manufacturing LocationsLocation of plants for transformer and coil/core manufacturing.
Drawings and LiteratureDrawings showing transformer dimensions, center of gravity, weight, and accessories.
Core and Coil DescriptionDescription of core and coil construction and materials.
Capacity TablesCapacity tables showing percent life loss at various temperatures and loads.
Alarm and ProtectionDescription of alarm, protection, pressure relief, and safety devices.
Controls DescriptionComplete description of controls including manufacturer(s), types, and options.
Tap Changer DescriptionDescription of manual no-load (DETC) and on-load (OLTC) tap changer.
Bushing InformationManufacturer, type, current rating, and dimensions of high-voltage bushings.
Surge ArrestersFull description of surge arresters, including voltages.
No-load LossesGuaranteed no-load (core) losses at rated primary voltage.
Load LossesGuaranteed load (copper) losses, including auxiliary losses at rated MVA and voltage.
EfficiencyEfficiency at 1/4 load, 1/2 load, 3/4 load, and full load.
ImpedancePercent resistance, reactance, and impedance H to X windings at rated MVA (55°C rise).
Short-circuit Test DataShort-circuit test data on similar unit.
Excitation CurrentExcitation current at 100%, 105%, and 110% rated voltage.
No-load In-rush CurrentMaximum no-load in-rush current.
Withstand Voltage ValuesGuaranteed withstand voltage values: Basic insulation level, chopped wave, low frequency.
Cooling Equipment GroupsNumber of groups of forced cooling equipment and hp rating of each group.
Noise LevelGuaranteed maximum noise level at each rating in dB.
Shipment MannerProposed manner of shipment: upright own cover, upright with shipping cover, etc.
Top Oil Temperature RiseMaximum top oil temperature rise of cooling medium.
Field TestsSpecific tests recommended by the manufacturer to be made in the field at time of commisioning, dressing out, and energization.
Cancellation ChargesSchedule of stipulated cancellation charges in 30-day intervals starting at the award date.
Special Tools and Spare PartsDescribe special tools and spare parts recommended by the manufacturer.
Submittal ScheduleSchedule for submittals; must conform to Submittal requirements in Section 33 73 13, Part 1, Article 1.4.
Lead TimesDelivery lead time from date of order.
Installation ScheduleDuration for install and turnover.