Amendment 001.2 - Exhibit B - Revised Bid Form~1.docx

DOCX document 40 KB Posted

Attached to
SKOV SUBSTATION TRANSFORMER PURCHASE: REQUEST FOR PROPOSAL
Solicitation number
S-R33123-00011021
Issued by
Wasco County, Oregon

About this file

This document is a Request for Proposal (RFP) from Northern Wasco County PUD for the purchase and installation of two 115-12.47/7.2 kV, 24/32/40 MVA ONAN/ONAF/ONAF 55°C power transformers to be furnished and installed at the Skov Substation in The Dalles, Oregon. The RFP requires bidders to complete a bid evaluation schedule that includes pricing for the transformers, site preparation, spare parts, and field-related services. Bidders must also provide technical specifications and details on the transformers, including no-load and load losses, efficiency, and withstand voltages. The RFP includes additive alternates for transformer storage and an alternate oil option. Bids must be submitted by a specific date and time, and the successful bidder will be awarded a contract.

The bid evaluation will be based on the total cost, including the transformer purchase price, no-load and load losses, and other related costs. The RFP does not mention any set-asides or incumbent contractors. Funding requirements and sources are not specified. The contract term and any renewal options are not stated.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID EVALUATION SCHEDULE

115-kV CLASS POWER TRANSFORMER

Complete the following Bid Evaluation Schedule; indicate the no-load (core) losses, load (copper) losses at loading noted, and associated dollar amounts. This schedule will be used for bid evaluation purposes.

BID GROUP A: POWER TRANSFORMER

Item
Description
Amount
A‑1
TWO (2) 115 – 12.47/7.2 kV, 24/32/40 MVA ONAN/ONAF/ONAF 55 degC, Power Transformers as specified in these Contract Documents (f.o.b. Skov Substation, The Dalles, Oregon)
$_______________
A-2
Preparation for energization, including unloading at site, placement of transformer on pad at site, and installation of all transformer accessories
$_______________
SUBTOTAL A (Items A-1 and A-2)
$_______________
A‑3
No-Load (core) Losses = ________ kW x $7,282/kW =
A-4
Load (copper) Losses at 24 MVA loading = _________ kW x $6,609/kW =
$_______________
TOTAL A (Items A-1, A-2, A-3, and A-4)
$_______________

BID GROUP B: SPARE PARTS

Item
Description
Amount
B-1
One high-voltage bushing, complete with gaskets
$_______________
B-2
One low-voltage bushing, complete with gaskets
$_______________
B-3
One complete set of contacts and coils for each type of contactor or relay furnished
$_______________
B-4
Miscellaneous spare parts, tools and materials (refer to Section 33 73 13)
$_______________
TOTAL B (Items B-1, B-2, B-3, and B-4)
$_______________

BID GROUP C: FIELD-RELATED SERVICES

Item
Description
Amount
C-1
Two (2) days minimum for transformer equipment related field service, including necessary installation and testing services, and startup assistance provided to OWNER (all travel expenses to be included): ________ days @ $___________ per diem
$_______________
C-2
One (1) day minimum for transformer equipment related OWNER training (all travel expenses to be included): ________ days @ $___________ per diem
$_______________
TOTAL C (Items C-1 and C-2)
$_______________

ADDITIVE ALTERNATE A TRANSFORMER STORAGE CHARGE

Should site development or construction be delayed, the OWNER may choose to have the transformer stored at the manufacturer’s facility. If necessary to store a transformer beyond the specified delivery date range, state the amount to store a transformer per month.

________________________________________________________ Dollars

and ___________________________________ Cents/Month $____________/Month
(Amount written in words has precedence)

ADDITIVE ALTERNATE B ALTERNATE OIL OPTION

If available by the manufacturer, provide an alternative adder price to design and supply the transformer with an accepted biodegradable seed or vegetable oil-based substitute that meets all ASTM, IEEE, and ANSI performance requirements. The oil alternative will be in lieu of pure mineral oil insulation. A datasheet for the alternative oil and a list of any special tools, monitoring devices, testing, or maintenance requirements to properly care for the substitute oil must be noted herein and provided with the proposal. The cost shown is interpreted as the difference to provide the transformer with the substitute oil, to be purchased at the OWNER’s option.

________________________________________________________ Dollars

and ___________________________________ Cents $_________________
(Amount written in words has precedence)

EQUIPMENT INFORMATION STATEMENT

1. Names of subcontractors who will perform field services and specific tasks to be performed.

2. Location of plant where transformer will be manufactured, and location of plant where coil and core are manufactured, if different than assembly plant. Acceptable transformers and components shall be manufactured and assembled in the contiguous United States.

3. Drawings and literature showing transformer dimensions (including base for pad design), center of gravity of transformer filled with oil, weight, description, and location or bushings, lightning arresters, pumps, fans, and accessories.

4. Description of core and coil construction and materials.

5. Capacity tables showing percent life loss at various ambient temperatures, oil temperatures, and peak load periods in standard format.

6. Description of alarm, protection, pressure relief, and safety devices.

7. Complete description of controls proposed including manufacturer(s), types, and options available.

8. Description of manual no-load (de-energized) tap changer (DETC) and on-load tap changer (OLTC).

9. Manufacturer, type, current rating, and stud dimensions of all high-voltage bushings.

10. A full description of the surge arresters, including all sparkover voltages and IR discharge voltages.

11. Guaranteed no-load (core) losses at 115kV primary voltage.

12. Guaranteed load (copper) losses, including auxiliary losses, at rated MVA (ONAN) and 115 kV primary voltage.

13. Efficiency at 1/4 load, 1/2 load, 3/4 load, and full load.

14. Percent resistance, reactance, and impedance H to X windings at rated MVA (55 degrees C rise).

15. Short-circuit test data on similar unit.

16. Excitation current at 100 percent, 105 percent, and 110 percent rated voltage (115 kV).

17. Maximum no-load in-rush current.

18. The following guaranteed withstand voltage values at 115 kV kV:

a. Basic insulation level._____________________________________
b. Chopped wave, 3 microsecond_____________________________________
c. Low frequency._____________________________________

19. Number of groups of forced cooling equipment, and hp rating of each group.

20. Guaranteed maximum noise level at each rating in dB.

21. Proposed manner of shipment:

a. Upright own cover.

b. Upright with shipping cover.

c. Upright with bushing pockets removed.

d. Other (describe).

22. Maximum top oil temperature rise of cooling medium.

23. Specific tests recommended by the manufacturer to be made in the field at time of energization.

24. Schedule of stipulated cancellation charges in 30-day intervals starting at the award date.

25. Describe special tools and spare parts recommended by manufacturer, but not listed in Bid Group B, and provide cost (to be purchased at OWNER’s option).

26. Schedule for submittals; schedule must conform to Submittal requirements in Section 33 73 13, Part 1, Article 1.4., and include:

a. Guaranteed schedule for submittal of certified transformer dimensions and weights after receipt of purchase order.

b. Guaranteed schedule for submittal of certified transformer control schematics and interconnection wiring diagrams.

c. Guaranteed schedule for submittal of the operations and maintenance manuals.

d. Guaranteed delivery date in terms of time interval following award of the Purchase Order for each bid item.

27. EXCEPTIONS TAKEN TO THE CONTRACT DOCUMENTS.

Amendment Acknowledgement

Acknowledgement of Receipt:

I/We acknowledge receipt of the Bid Amendments listed below:

a. Add as needed

END OF SECTION

NWCPUD24001MAY 2024
00 42 43 (EQUIPMENT PURCHASE)4PROPOSAL