Exhibit B-1 Alaska Construction Surveying Manual.pdf
PDF 351 KB Posted
- Solicitation number
- RFP # 25253003
- Issued by
- Juneau City and Borough, Alaska
About this file
This document is the Alaska Department of Transportation and Public Facilities' Construction Surveying Requirements. It outlines the survey accuracy and frequency requirements for various elements of transportation construction projects in the state of Alaska, including stationing, centerline, grade stakes, culverts, bridges, and other features. The document provides detailed tables specifying the allowable tolerances for horizontal and vertical measurements, as well as the required staking frequencies for tangents, curves, and interchange ramps. It also includes guidance on typical section drawings, survey point materials, alignment notes, clearing notes, level notes, slope stake notes, culvert notes, and blue/red top and grade stake notes.
The related state and local contract opportunity is a Request for Proposals (RFP) from the Alaska Department of Transportation and Public Facilities for design services related to the installation of a partial signal at the Egan/Yandukin intersection in Juneau, Alaska. The scope of work includes a complete design of the partial signal and pedestrian accommodations, as well as assistance with the environmental document and permitting processes, and public/stakeholder involvement. The estimated performance period is from October 1, 2024 to December 31, 2026, and the expected cost range for these professional services is $500,000 to $1,000,000.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Alaska Department of Transportation and Public Facilities
Alaska Construction Surveying Requirements (US Customary Units)
Alaska Construction Surveying Requirements (US Customary Units)
Table of Contents
Description Page
1. Survey accuracy requirements
2. Survey frequency requirements
3. Typical section drawing
4. Survey point materials requirements
5. Typical alignment notes
6. Typical clearing notes
7. Typical level notes
8. Typical slope stake notes
9. Typical culvert notes
10. Typical culvert camber diagram
11. Typical blue or red tops and grade stake notes 11
Alaska Construction Surveying Requirements i June 2, 2003
1. Survey accuracy requirements
Third order survey
Use a 1/5000 horizontal closure.
Use an angle closure of 30 N seconds, where N equals the number of angles in the traverse.
An Alaska-registered professional land surveyor must perform or supervise replacement of survey monuments (property, USGS, USC&GS, BLM, etc.) or establishment of monuments (including centerline).
All monument work must comply with AS 34.65.040 and meet standards in the latest version of the Alaska Society of Professional Land Surveyors’ Standards of Practice Manual.
The allowable vertical error for misclosure is e = 0.05 M e = maximum misclosure in feet, M
= length of the level circuit in miles.
Table 1—Survey accuracy requirements (in feet)
Stationing HI Closure Horizontal
Angle Distance To center line
Grade
Additional cross sections 1.0 0.01 0.04 ** 0.1 0.1 Benches 0.01 0.02 Blue tops*** 1.0 0.01 0.04 0.1 0.02 Bridges * 0.01 0.02 0.01 Centerline * * Clearing & Grubbing 1.0 1.0 Culverts 1.0 0.01 0.04 ** 0.1 0.1 Curb & gutter 1.0 0.01 0.02 0.1 0.02 Grade stakes 1.0 0.1 0.1 Guardrail 1.0 0.1 Manholes, catch basins & inlets 1.0 0.01 0.02 0.1 0.02 Monuments * * Red tops*** 1.0 0.01 0.02 0.1 0.05 Riprap 1.0 0.1 0.04 1.0 0.1 Signs 1.0 0.1 Slope stakes & RP’s 1.0 0.01 0.04 ** 0.1 0.1 Under drains & sewer 1.0 0.01 0.02 0.1 0.02
* Third order survey **Right angle prism or transit angles from center line *** Use blue tops for top of base course and red tops for the bottom of base course.
Alaska Construction Surveying Requirements 1 June 2, 2003
1. Survey frequency requirements
Table 2—Survey frequency requirements (in feet)
Tangents Curves Interchange ramps Stake each per plan
See special instructions on sample notes
Additional cross sections * * * Bench marks X Blue tops 100 100** 25 X Blue tops within 100 feet both sides of railroad track crossings and bridge approaches
25 25 25 X
Bridges X X Center line 100 100** 25 Clearing 100 100** 25 X Culverts X X Curb and gutter 25 25 25 Grade stakes 100 100** 50 Guardrail 25 25 25 Manholes, catch basins & inlets X Monuments X Red tops 100 100** 25 X Riprap 50 50 50 Signs X Slope stake / cross sections 100 100** 25 X Under drains and sewers 50 25 25
* Establish additional cross sections and slope stakes at all breaks in topography and where structures begin and end.
**Curves shall be staked on 50-foot stations if the curve is greater than six degrees.
June 2, 2003 2 Alaska Construction Surveying Requirements
2. Typical Section Drawing
Alaska Construction Surveying Requirements 3 June 2, 2003
3. Survey point materials requirements
These are minimum requirements; larger sizes may be necessary.
Use only stakes with planed sides.
Table 3—Survey point materials requirements la th o r w hi sk er s
2” x x 8” h ub
2” x x h
1” x x st ak e
1” x x st ak e la th
H a nd ta ck d na il d na il
½ x re ba r
Benchmarks
X
Blue tops X X Centerline P.C., P.T., P.O.T. X X X * X* Centerline reference points X X X * X * Centerline station X X Clearing X Culvert stake X X X Culvert stake references X X X Curb and gutter X X X Guardrail X Major structures X X * X * X X * X * Red tops X X Signs X Slope stake X X Slope stake references X X X
* Optional depending on conditions, and to be determined by the Project Engineer.
June 2, 2003 4 Alaska Construction Surveying Requirements
4. Typical alignment notes
The Chief of Parties must prepare the alignment book before actual staking.
Don’t use swing ties for reference points.
Use three point right angle ties, two to the right and one left, or vice versa.
Reference P.C., P.I., P.T., and P.O.T.
Alaska Construction Surveying Requirements 5 June 2, 2003
5. Typical clearing notes
Exclude areas not needing clearing.
Draw a diagram as required to show unusual or confusing areas.
June 2, 2003 6 Alaska Construction Surveying Requirements
6. Typical level notes
Balance back sights and foresights.
Establish all benchmarks and take the centerline profile before doing any staking involving elevations.
Don’t set benchmarks in utility poles.
Don’t use side shots on benchmarks.
Use the turn through method when establishing benchmarks.
Re-check benchmarks after each major freeze/thaw cycle and/or any environmental event that may change the benchmark elevation.
Do not use double rodding.
Run separate level loops between all benchmarks.
Set benchmarks in trees of at least six-inch diameter, unless approved by the Project Engineer.
Correct errors in benchmark elevations so they will not affect the elevations of succeeding benchmarks.
Consult with the Project Engineer before placing benchmarks in areas of permafrost or other unstable ground.
Establish benchmarks at intervals and locations consistent with good engineering practice, and generally not more than 1000 feet.
Completely describe benchmarks when establishing or re-establishing their elevation.
Give centerline stationing, offset, benchmark projection, and observable benchmark characteristics. When checking into or out of benchmarks, note the book and page number that contains the most recent elevation establishment for that benchmark.
Write the station on the top twelve inches facing centerline, with numerals a minimum of one inch in height.
June 2, 2003 7 Alaska Construction Surveying Requirements
7. Typical slope stake notes
Enter the station, elevations, shoulder distance or ditch distances, and slope in the slope stake book before staking begins.
In areas where slides or overbreak are anticipated, extend the sections beyond the construction limits.
Slope-stake each section that is cross-sectioned.
Final re-cross sections are required where there are overbreaks, undercuts, etc. Re-cross section book and page numbers shall be noted on the original cross-section and slope staking page for the relevant stations.
Use a hand level only for one turn up or down from the instrument.
Clearly note hand level turns.
Use a reference point that is 10-20 feet beyond the slope stake.
The reference point must show the cut or fill to the slope stake and must include the slope stake information.
Slope stake all abrupt changes in typical sections.
Position all laths to face centerline.
Include at least the following information on the stake: (1) where to begin the cut or fill (2) the slope ratio (3) the depth of cut or height of fill and (4) the station.
Alaska Construction Surveying Requirements 8 June 2, 2003
8. Typical culvert notes
Show at least the following information on culvert stakes station size length type of pipe (e.g., 24” x 80’ CMP) cut or fill from top of hub to inlet & outlet skew angle horizontal distance from hub to end of pipe gradient of pipe drop of pipe
Ensure that all culverts have a minimum camber equal to 1% of the length of the pipe, unless the Project Engineer directs otherwise.
Develop a culvert camber diagram showing each section of pipe and its elevation and offset.
June 2, 2003 9 Alaska Construction Surveying Requirements
9. Typical culvert camber diagram
June 2, 2003 10 Alaska Construction Surveying Requirements
10. Typical blue or red tops and grade stake notes
Place blue and red tops at each break in typical section and on centerline.
Use blue tops for top of base course.
Use red tops for the bottom of the base course.
Evenly space red/blue tops at and between crown section break points with a maximum spacing of
25 feet between red/blue tops.
Establish horizontal control from centerline references and vertical control from benchmarks.
Place blue tops at the same interval as slope stakes.
Stake all curve transitions.
Alaska Construction Surveying Requirements 11 June 2, 2003
| Table of Contents |
| Description |
| Page |
| Survey accuracy requirements |
| Third order survey |
| Table 1—Survey accuracy requirements \(in feet\� |
Survey frequency requirements
Table 2—Survey frequency requirements \(in feet�
| Typical Section Drawing |
| Survey point materials requirements |
Table 3—Survey point materials requirements
| Typical alignment notes |
| Typical clearing notes |
| Typical level notes |
| Typical slope stake notes |
| Typical culvert notes |
| Typical culvert camber diagram |
| � |
| Typical blue or red tops and grade stake notes |
File details come from the government source that posted it. Updated .